BOOSTING CONTROLLER AND FLOW RATE MEASURING INSTRUMENT

PROBLEM TO BE SOLVED: To cause a boosting means to operate in correspondence with the operation of a load and thereby enhance the stability of voltage during operation and solve such problem that, the irregular operation of a boosting means works as a noise source during the operation of a load. SOL...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: SHIBA BUNICHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHIBA BUNICHI
description PROBLEM TO BE SOLVED: To cause a boosting means to operate in correspondence with the operation of a load and thereby enhance the stability of voltage during operation and solve such problem that, the irregular operation of a boosting means works as a noise source during the operation of a load. SOLUTION: A controlling means 23 detects the operation of the load 6, and sends a signal out to the boosting means 22 in correspondence with that operation and regulates voltage. Consequently, the controlling means supplies power to the load 6 with stable voltage. Further, the controlling means causes the boosting means 22 to operate during a period for which the operation of the load is not influenced. Thus, the operation of the boosting means which does not have the influences of noise and the like on the system can be implemented. COPYRIGHT: (C)2004,JPO
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2004072912A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2004072912A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2004072912A3</originalsourceid><addsrcrecordid>eNrjZDBz8vcPDvH0c1dw9vcLCfL38XENUnD0c1Fw8_EPVwhyDHFV8HV1DA4NAinx9AsOCQr1dfUL4WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgYGJgbmRpaGRo7GRCkCAIe_KKs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BOOSTING CONTROLLER AND FLOW RATE MEASURING INSTRUMENT</title><source>esp@cenet</source><creator>SHIBA BUNICHI</creator><creatorcontrib>SHIBA BUNICHI</creatorcontrib><description>PROBLEM TO BE SOLVED: To cause a boosting means to operate in correspondence with the operation of a load and thereby enhance the stability of voltage during operation and solve such problem that, the irregular operation of a boosting means works as a noise source during the operation of a load. SOLUTION: A controlling means 23 detects the operation of the load 6, and sends a signal out to the boosting means 22 in correspondence with that operation and regulates voltage. Consequently, the controlling means supplies power to the load 6 with stable voltage. Further, the controlling means causes the boosting means 22 to operate during a period for which the operation of the load is not influenced. Thus, the operation of the boosting means which does not have the influences of noise and the like on the system can be implemented. COPYRIGHT: (C)2004,JPO</description><edition>7</edition><language>eng</language><subject>APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC,OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWERSUPPLY SYSTEMS ; CONTROL OR REGULATION THEREOF ; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUTPOWER ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; GENERATION ; MEASURING ; MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL ; METERING BY VOLUME ; PHYSICS ; TESTING</subject><creationdate>2004</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20040304&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004072912A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20040304&amp;DB=EPODOC&amp;CC=JP&amp;NR=2004072912A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHIBA BUNICHI</creatorcontrib><title>BOOSTING CONTROLLER AND FLOW RATE MEASURING INSTRUMENT</title><description>PROBLEM TO BE SOLVED: To cause a boosting means to operate in correspondence with the operation of a load and thereby enhance the stability of voltage during operation and solve such problem that, the irregular operation of a boosting means works as a noise source during the operation of a load. SOLUTION: A controlling means 23 detects the operation of the load 6, and sends a signal out to the boosting means 22 in correspondence with that operation and regulates voltage. Consequently, the controlling means supplies power to the load 6 with stable voltage. Further, the controlling means causes the boosting means 22 to operate during a period for which the operation of the load is not influenced. Thus, the operation of the boosting means which does not have the influences of noise and the like on the system can be implemented. COPYRIGHT: (C)2004,JPO</description><subject>APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC,OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWERSUPPLY SYSTEMS</subject><subject>CONTROL OR REGULATION THEREOF</subject><subject>CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUTPOWER</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>GENERATION</subject><subject>MEASURING</subject><subject>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</subject><subject>METERING BY VOLUME</subject><subject>PHYSICS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2004</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBz8vcPDvH0c1dw9vcLCfL38XENUnD0c1Fw8_EPVwhyDHFV8HV1DA4NAinx9AsOCQr1dfUL4WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgYGJgbmRpaGRo7GRCkCAIe_KKs</recordid><startdate>20040304</startdate><enddate>20040304</enddate><creator>SHIBA BUNICHI</creator><scope>EVB</scope></search><sort><creationdate>20040304</creationdate><title>BOOSTING CONTROLLER AND FLOW RATE MEASURING INSTRUMENT</title><author>SHIBA BUNICHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2004072912A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2004</creationdate><topic>APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC,OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWERSUPPLY SYSTEMS</topic><topic>CONTROL OR REGULATION THEREOF</topic><topic>CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUTPOWER</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>GENERATION</topic><topic>MEASURING</topic><topic>MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL</topic><topic>METERING BY VOLUME</topic><topic>PHYSICS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>SHIBA BUNICHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHIBA BUNICHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BOOSTING CONTROLLER AND FLOW RATE MEASURING INSTRUMENT</title><date>2004-03-04</date><risdate>2004</risdate><abstract>PROBLEM TO BE SOLVED: To cause a boosting means to operate in correspondence with the operation of a load and thereby enhance the stability of voltage during operation and solve such problem that, the irregular operation of a boosting means works as a noise source during the operation of a load. SOLUTION: A controlling means 23 detects the operation of the load 6, and sends a signal out to the boosting means 22 in correspondence with that operation and regulates voltage. Consequently, the controlling means supplies power to the load 6 with stable voltage. Further, the controlling means causes the boosting means 22 to operate during a period for which the operation of the load is not influenced. Thus, the operation of the boosting means which does not have the influences of noise and the like on the system can be implemented. COPYRIGHT: (C)2004,JPO</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2004072912A
source esp@cenet
subjects APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC,OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWERSUPPLY SYSTEMS
CONTROL OR REGULATION THEREOF
CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUTPOWER
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
GENERATION
MEASURING
MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUIDLEVEL
METERING BY VOLUME
PHYSICS
TESTING
title BOOSTING CONTROLLER AND FLOW RATE MEASURING INSTRUMENT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T16%3A01%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHIBA%20BUNICHI&rft.date=2004-03-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2004072912A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true