WORK INFORMATION CONTROL SYSTEM
PROBLEM TO BE SOLVED: To provide a work information control system capable of facilitating order receipt/ordering of a work and allowing a client to confirm a progressing state and completion information of the work. SOLUTION: A client's terminal 2 is provided with work request information tran...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MAEJIMA AKIRA |
description | PROBLEM TO BE SOLVED: To provide a work information control system capable of facilitating order receipt/ordering of a work and allowing a client to confirm a progressing state and completion information of the work. SOLUTION: A client's terminal 2 is provided with work request information transmission means 21 and 25 transmitting work request information to a control server 3, work information demand means 21 demanding the work information of the requesting work, and display means 22 displaying the work information transmitted from the control server 3. The control server 3 is provided with work information preparation means 31 preparing the work information based on the work request information from the client's terminal 2, work information storage means 33 storing the work information, work request notification means 31 and 32 notifying a request notification to a contractor's terminal 4 based on the work information, work information renewal means 31 renewing the work information based on the progress information from the contractor's terminal 4, and work information provision means 31 providing the work information demanded from the client's terminal 2. The contractor's terminal 4 is provided with work request notification receiving means 41 and 45 receiving the work request notification from the control server 3 and progress information transmission means 41 and 45 transmitting the progress information of the requested work. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2003132196A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2003132196A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2003132196A3</originalsourceid><addsrcrecordid>eNrjZJAP9w_yVvD0c_MP8nUM8fT3U3D29wsJ8vdRCI4MDnH15WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgYGxobGRoaWZo7GRCkCADjpIl8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>WORK INFORMATION CONTROL SYSTEM</title><source>esp@cenet</source><creator>MAEJIMA AKIRA</creator><creatorcontrib>MAEJIMA AKIRA</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a work information control system capable of facilitating order receipt/ordering of a work and allowing a client to confirm a progressing state and completion information of the work. SOLUTION: A client's terminal 2 is provided with work request information transmission means 21 and 25 transmitting work request information to a control server 3, work information demand means 21 demanding the work information of the requesting work, and display means 22 displaying the work information transmitted from the control server 3. The control server 3 is provided with work information preparation means 31 preparing the work information based on the work request information from the client's terminal 2, work information storage means 33 storing the work information, work request notification means 31 and 32 notifying a request notification to a contractor's terminal 4 based on the work information, work information renewal means 31 renewing the work information based on the progress information from the contractor's terminal 4, and work information provision means 31 providing the work information demanded from the client's terminal 2. The contractor's terminal 4 is provided with work request notification receiving means 41 and 45 receiving the work request notification from the control server 3 and progress information transmission means 41 and 45 transmitting the progress information of the requested work.</description><edition>7</edition><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2003</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20030509&DB=EPODOC&CC=JP&NR=2003132196A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20030509&DB=EPODOC&CC=JP&NR=2003132196A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MAEJIMA AKIRA</creatorcontrib><title>WORK INFORMATION CONTROL SYSTEM</title><description>PROBLEM TO BE SOLVED: To provide a work information control system capable of facilitating order receipt/ordering of a work and allowing a client to confirm a progressing state and completion information of the work. SOLUTION: A client's terminal 2 is provided with work request information transmission means 21 and 25 transmitting work request information to a control server 3, work information demand means 21 demanding the work information of the requesting work, and display means 22 displaying the work information transmitted from the control server 3. The control server 3 is provided with work information preparation means 31 preparing the work information based on the work request information from the client's terminal 2, work information storage means 33 storing the work information, work request notification means 31 and 32 notifying a request notification to a contractor's terminal 4 based on the work information, work information renewal means 31 renewing the work information based on the progress information from the contractor's terminal 4, and work information provision means 31 providing the work information demanded from the client's terminal 2. The contractor's terminal 4 is provided with work request notification receiving means 41 and 45 receiving the work request notification from the control server 3 and progress information transmission means 41 and 45 transmitting the progress information of the requested work.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2003</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAP9w_yVvD0c_MP8nUM8fT3U3D29wsJ8vdRCI4MDnH15WFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8V4BRgYGxobGRoaWZo7GRCkCADjpIl8</recordid><startdate>20030509</startdate><enddate>20030509</enddate><creator>MAEJIMA AKIRA</creator><scope>EVB</scope></search><sort><creationdate>20030509</creationdate><title>WORK INFORMATION CONTROL SYSTEM</title><author>MAEJIMA AKIRA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2003132196A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2003</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>MAEJIMA AKIRA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MAEJIMA AKIRA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>WORK INFORMATION CONTROL SYSTEM</title><date>2003-05-09</date><risdate>2003</risdate><abstract>PROBLEM TO BE SOLVED: To provide a work information control system capable of facilitating order receipt/ordering of a work and allowing a client to confirm a progressing state and completion information of the work. SOLUTION: A client's terminal 2 is provided with work request information transmission means 21 and 25 transmitting work request information to a control server 3, work information demand means 21 demanding the work information of the requesting work, and display means 22 displaying the work information transmitted from the control server 3. The control server 3 is provided with work information preparation means 31 preparing the work information based on the work request information from the client's terminal 2, work information storage means 33 storing the work information, work request notification means 31 and 32 notifying a request notification to a contractor's terminal 4 based on the work information, work information renewal means 31 renewing the work information based on the progress information from the contractor's terminal 4, and work information provision means 31 providing the work information demanded from the client's terminal 2. The contractor's terminal 4 is provided with work request notification receiving means 41 and 45 receiving the work request notification from the control server 3 and progress information transmission means 41 and 45 transmitting the progress information of the requested work.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2003132196A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | WORK INFORMATION CONTROL SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-22T14%3A33%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MAEJIMA%20AKIRA&rft.date=2003-05-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2003132196A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |