TOOL FOR ERECTING PILLAR AND PILLAR ERECTING METHOD USING THE SAME
PROBLEM TO BE SOLVED: To provide a tool for erecting a pillar and a pillar erecting method using the same, which does not deteriorate the use efficiency of work spaces, improve the safety of erection works, shortens a construction period, and enables delicate adjustment in a easy manner. SOLUTION: A...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TANAKA HIROSHI YAMAKAWA ISAO KUMADA MASAKANE |
description | PROBLEM TO BE SOLVED: To provide a tool for erecting a pillar and a pillar erecting method using the same, which does not deteriorate the use efficiency of work spaces, improve the safety of erection works, shortens a construction period, and enables delicate adjustment in a easy manner. SOLUTION: A steel pipe 12 is provided on the upper end of a lower steel pipe pillar 7 to engage with the lower hole of an upper steel pipe pillar 8 via the inner side of the hole and gap between both steel pipe pillars. Supporting points are provided near the lowest end of the inner side of the upper steel pipe pillar 8 for adjusting the verticality of the upper steel pipe pillar 8 by sloping it. In a state that the steel pipe 12 of the lower steel pipe pillar 7 is fitted into the lower hole of the upper steel pipe pillar 8, the handle 6 of the tool 1 for erecting a pillar mounted on respective sides of the lower steel pipe pillar 7 is wheeled to press or withdraw the front end face of an adjusting bolt 4 to or from respective sides of the upper steel pipe pillar 8, so that the slope of the upper steel pipe pillar 8 is adjusted. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2002349072A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2002349072A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2002349072A3</originalsourceid><addsrcrecordid>eNrjZHAK8ff3UXDzD1JwDXJ1DvH0c1cI8PTxcQxScPRzgTHhUr6uIR7-LgqhwSBOiIerQrCjrysPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYn3CjAyMDAyNrE0MDdyNCZKEQAtsitH</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>TOOL FOR ERECTING PILLAR AND PILLAR ERECTING METHOD USING THE SAME</title><source>esp@cenet</source><creator>TANAKA HIROSHI ; YAMAKAWA ISAO ; KUMADA MASAKANE</creator><creatorcontrib>TANAKA HIROSHI ; YAMAKAWA ISAO ; KUMADA MASAKANE</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a tool for erecting a pillar and a pillar erecting method using the same, which does not deteriorate the use efficiency of work spaces, improve the safety of erection works, shortens a construction period, and enables delicate adjustment in a easy manner. SOLUTION: A steel pipe 12 is provided on the upper end of a lower steel pipe pillar 7 to engage with the lower hole of an upper steel pipe pillar 8 via the inner side of the hole and gap between both steel pipe pillars. Supporting points are provided near the lowest end of the inner side of the upper steel pipe pillar 8 for adjusting the verticality of the upper steel pipe pillar 8 by sloping it. In a state that the steel pipe 12 of the lower steel pipe pillar 7 is fitted into the lower hole of the upper steel pipe pillar 8, the handle 6 of the tool 1 for erecting a pillar mounted on respective sides of the lower steel pipe pillar 7 is wheeled to press or withdraw the front end face of an adjusting bolt 4 to or from respective sides of the upper steel pipe pillar 8, so that the slope of the upper steel pipe pillar 8 is adjusted.</description><edition>7</edition><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>2002</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20021204&DB=EPODOC&CC=JP&NR=2002349072A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20021204&DB=EPODOC&CC=JP&NR=2002349072A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TANAKA HIROSHI</creatorcontrib><creatorcontrib>YAMAKAWA ISAO</creatorcontrib><creatorcontrib>KUMADA MASAKANE</creatorcontrib><title>TOOL FOR ERECTING PILLAR AND PILLAR ERECTING METHOD USING THE SAME</title><description>PROBLEM TO BE SOLVED: To provide a tool for erecting a pillar and a pillar erecting method using the same, which does not deteriorate the use efficiency of work spaces, improve the safety of erection works, shortens a construction period, and enables delicate adjustment in a easy manner. SOLUTION: A steel pipe 12 is provided on the upper end of a lower steel pipe pillar 7 to engage with the lower hole of an upper steel pipe pillar 8 via the inner side of the hole and gap between both steel pipe pillars. Supporting points are provided near the lowest end of the inner side of the upper steel pipe pillar 8 for adjusting the verticality of the upper steel pipe pillar 8 by sloping it. In a state that the steel pipe 12 of the lower steel pipe pillar 7 is fitted into the lower hole of the upper steel pipe pillar 8, the handle 6 of the tool 1 for erecting a pillar mounted on respective sides of the lower steel pipe pillar 7 is wheeled to press or withdraw the front end face of an adjusting bolt 4 to or from respective sides of the upper steel pipe pillar 8, so that the slope of the upper steel pipe pillar 8 is adjusted.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2002</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAK8ff3UXDzD1JwDXJ1DvH0c1cI8PTxcQxScPRzgTHhUr6uIR7-LgqhwSBOiIerQrCjrysPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYn3CjAyMDAyNrE0MDdyNCZKEQAtsitH</recordid><startdate>20021204</startdate><enddate>20021204</enddate><creator>TANAKA HIROSHI</creator><creator>YAMAKAWA ISAO</creator><creator>KUMADA MASAKANE</creator><scope>EVB</scope></search><sort><creationdate>20021204</creationdate><title>TOOL FOR ERECTING PILLAR AND PILLAR ERECTING METHOD USING THE SAME</title><author>TANAKA HIROSHI ; YAMAKAWA ISAO ; KUMADA MASAKANE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2002349072A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2002</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>TANAKA HIROSHI</creatorcontrib><creatorcontrib>YAMAKAWA ISAO</creatorcontrib><creatorcontrib>KUMADA MASAKANE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TANAKA HIROSHI</au><au>YAMAKAWA ISAO</au><au>KUMADA MASAKANE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>TOOL FOR ERECTING PILLAR AND PILLAR ERECTING METHOD USING THE SAME</title><date>2002-12-04</date><risdate>2002</risdate><abstract>PROBLEM TO BE SOLVED: To provide a tool for erecting a pillar and a pillar erecting method using the same, which does not deteriorate the use efficiency of work spaces, improve the safety of erection works, shortens a construction period, and enables delicate adjustment in a easy manner. SOLUTION: A steel pipe 12 is provided on the upper end of a lower steel pipe pillar 7 to engage with the lower hole of an upper steel pipe pillar 8 via the inner side of the hole and gap between both steel pipe pillars. Supporting points are provided near the lowest end of the inner side of the upper steel pipe pillar 8 for adjusting the verticality of the upper steel pipe pillar 8 by sloping it. In a state that the steel pipe 12 of the lower steel pipe pillar 7 is fitted into the lower hole of the upper steel pipe pillar 8, the handle 6 of the tool 1 for erecting a pillar mounted on respective sides of the lower steel pipe pillar 7 is wheeled to press or withdraw the front end face of an adjusting bolt 4 to or from respective sides of the upper steel pipe pillar 8, so that the slope of the upper steel pipe pillar 8 is adjusted.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2002349072A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CEILINGS FIXED CONSTRUCTIONS FLOORS FORMS GENERAL BUILDING CONSTRUCTIONS HANDLING BUILDING MATERIALS ON THE SITE INSULATION OR OTHER PROTECTION OF BUILDINGS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ROOFS SCAFFOLDING SHUTTERING WALLS, e.g. PARTITIONS |
title | TOOL FOR ERECTING PILLAR AND PILLAR ERECTING METHOD USING THE SAME |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T06%3A17%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TANAKA%20HIROSHI&rft.date=2002-12-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2002349072A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |