STRUCTURE AND METHOD FOR CONSTRUCTION OF BOX CULVERT
PROBLEM TO BE SOLVED: To eliminate an obstruction to the traveling of a vehicle and labor for the control of a road by dispensing with smoothing by virtue of the elimination of a step between a temporary lining and a peripheral road surface. SOLUTION: The ground inside an earth retaining wall 2, whi...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!