PRECAST PANEL WITH SHEATHED TUBE AND METHOD OF CONSTRUCTING WATER SURFACE STRUCTURE

PROBLEM TO BE SOLVED: To provide a precast panel with a sheathed tube, facilitating installation and allowing the drive of a pile at an accurate position, and a method of constructing and repairing a water surface structure, allowing supply to be started in a short period. SOLUTION: The precast pane...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MATSUKIDA MASAYOSHI, TAKEI YASUSHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MATSUKIDA MASAYOSHI
TAKEI YASUSHI
description PROBLEM TO BE SOLVED: To provide a precast panel with a sheathed tube, facilitating installation and allowing the drive of a pile at an accurate position, and a method of constructing and repairing a water surface structure, allowing supply to be started in a short period. SOLUTION: The precast panel with the sheathed tube comprises the precast panel and the sheathed tube, the sheathed tube being subjected to anticorrosive treatment with its end having a length enough to be located in a water when installed corresponding to a pile head portion. Preferably, the end of the sheathed tube has a length to be located in the water at all times. The method of constructing the water surface structure consisting of a floor panel and the pile comprises installing the precast panel with the sheathed tube in position, driving the pile from above the precast panel with the sheathed tube along the sheathed tube and joining the precast panel with the sheathed tube to the pile.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2002097615A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2002097615A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2002097615A3</originalsourceid><addsrcrecordid>eNqNyrEKwjAQgOEsDlJ9h8O9ECsqjmdyMRVNQnKhYykSJ9FCfX8c9AGcfvj45yKFSAoTQ0BHF-hatpAsIVvSwPlIgE7Dldh6Dd6A8i5xzIpbd4IOmSKkHA0qgq_nSAsxuw-PqSx_rcTKECtbl_HVl2kcbuVZ3v05NFI28rDfrbe4-Wv6AGCPMGs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PRECAST PANEL WITH SHEATHED TUBE AND METHOD OF CONSTRUCTING WATER SURFACE STRUCTURE</title><source>esp@cenet</source><creator>MATSUKIDA MASAYOSHI ; TAKEI YASUSHI</creator><creatorcontrib>MATSUKIDA MASAYOSHI ; TAKEI YASUSHI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a precast panel with a sheathed tube, facilitating installation and allowing the drive of a pile at an accurate position, and a method of constructing and repairing a water surface structure, allowing supply to be started in a short period. SOLUTION: The precast panel with the sheathed tube comprises the precast panel and the sheathed tube, the sheathed tube being subjected to anticorrosive treatment with its end having a length enough to be located in a water when installed corresponding to a pile head portion. Preferably, the end of the sheathed tube has a length to be located in the water at all times. The method of constructing the water surface structure consisting of a floor panel and the pile comprises installing the precast panel with the sheathed tube in position, driving the pile from above the precast panel with the sheathed tube along the sheathed tube and joining the precast panel with the sheathed tube to the pile.</description><edition>7</edition><language>eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>2002</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20020402&amp;DB=EPODOC&amp;CC=JP&amp;NR=2002097615A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20020402&amp;DB=EPODOC&amp;CC=JP&amp;NR=2002097615A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MATSUKIDA MASAYOSHI</creatorcontrib><creatorcontrib>TAKEI YASUSHI</creatorcontrib><title>PRECAST PANEL WITH SHEATHED TUBE AND METHOD OF CONSTRUCTING WATER SURFACE STRUCTURE</title><description>PROBLEM TO BE SOLVED: To provide a precast panel with a sheathed tube, facilitating installation and allowing the drive of a pile at an accurate position, and a method of constructing and repairing a water surface structure, allowing supply to be started in a short period. SOLUTION: The precast panel with the sheathed tube comprises the precast panel and the sheathed tube, the sheathed tube being subjected to anticorrosive treatment with its end having a length enough to be located in a water when installed corresponding to a pile head portion. Preferably, the end of the sheathed tube has a length to be located in the water at all times. The method of constructing the water surface structure consisting of a floor panel and the pile comprises installing the precast panel with the sheathed tube in position, driving the pile from above the precast panel with the sheathed tube along the sheathed tube and joining the precast panel with the sheathed tube to the pile.</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2002</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyrEKwjAQgOEsDlJ9h8O9ECsqjmdyMRVNQnKhYykSJ9FCfX8c9AGcfvj45yKFSAoTQ0BHF-hatpAsIVvSwPlIgE7Dldh6Dd6A8i5xzIpbd4IOmSKkHA0qgq_nSAsxuw-PqSx_rcTKECtbl_HVl2kcbuVZ3v05NFI28rDfrbe4-Wv6AGCPMGs</recordid><startdate>20020402</startdate><enddate>20020402</enddate><creator>MATSUKIDA MASAYOSHI</creator><creator>TAKEI YASUSHI</creator><scope>EVB</scope></search><sort><creationdate>20020402</creationdate><title>PRECAST PANEL WITH SHEATHED TUBE AND METHOD OF CONSTRUCTING WATER SURFACE STRUCTURE</title><author>MATSUKIDA MASAYOSHI ; TAKEI YASUSHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2002097615A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2002</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>MATSUKIDA MASAYOSHI</creatorcontrib><creatorcontrib>TAKEI YASUSHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MATSUKIDA MASAYOSHI</au><au>TAKEI YASUSHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PRECAST PANEL WITH SHEATHED TUBE AND METHOD OF CONSTRUCTING WATER SURFACE STRUCTURE</title><date>2002-04-02</date><risdate>2002</risdate><abstract>PROBLEM TO BE SOLVED: To provide a precast panel with a sheathed tube, facilitating installation and allowing the drive of a pile at an accurate position, and a method of constructing and repairing a water surface structure, allowing supply to be started in a short period. SOLUTION: The precast panel with the sheathed tube comprises the precast panel and the sheathed tube, the sheathed tube being subjected to anticorrosive treatment with its end having a length enough to be located in a water when installed corresponding to a pile head portion. Preferably, the end of the sheathed tube has a length to be located in the water at all times. The method of constructing the water surface structure consisting of a floor panel and the pile comprises installing the precast panel with the sheathed tube in position, driving the pile from above the precast panel with the sheathed tube along the sheathed tube and joining the precast panel with the sheathed tube to the pile.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2002097615A
source esp@cenet
subjects FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
title PRECAST PANEL WITH SHEATHED TUBE AND METHOD OF CONSTRUCTING WATER SURFACE STRUCTURE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T23%3A42%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MATSUKIDA%20MASAYOSHI&rft.date=2002-04-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2002097615A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true