DIKE FOR TANK ON THE GROUND
PROBLEM TO BE SOLVED: To reduce a cost required for construction of a dike by eliminating support by a pile foundation wherein a reserved liquid flowing out when an tank on the ground is damaged, is stopped by a fence integrally continuous in a circumferential direction instead of a wall clock. SOLU...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!