DIKE FOR TANK ON THE GROUND

PROBLEM TO BE SOLVED: To reduce a cost required for construction of a dike by eliminating support by a pile foundation wherein a reserved liquid flowing out when an tank on the ground is damaged, is stopped by a fence integrally continuous in a circumferential direction instead of a wall clock. SOLU...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KURODA MASANOBU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!