SOIL IMPROVEMENT METHOD CARRYING OUT LAP WORK BY USING EFFICIENCY RETARDANT STABILIZER
PROBLEM TO BE SOLVED: To provide a soil improvement method capable of using an slow-acting stabilizer as a soil improvement material, easily carrying out work after approximately three days age of the existing improved pile, at the same time, revealing specific strength after the solidification in l...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!