METHOD FOR INSTALLATION OF SUPPORTING MATERIAL FOR COFFERDAM CONSTRUCTION

PROBLEM TO BE SOLVED: To provide a method for installation of supporting material for cofferdam construction capable of installing even a long single supporting material by easily moving it to an installation position and capable of expecting an increase in construction efficiency. SOLUTION: After s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: SHINOHE KAZUO, MURAKAMI KOJI, NAEMURA KOZO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator SHINOHE KAZUO
MURAKAMI KOJI
NAEMURA KOZO
description PROBLEM TO BE SOLVED: To provide a method for installation of supporting material for cofferdam construction capable of installing even a long single supporting material by easily moving it to an installation position and capable of expecting an increase in construction efficiency. SOLUTION: After sheet pile walls 2, 2 for cofferdam construction are installed drivingly, specified stages of supporting materials 4, 5, 6 are floated on water surface between the sheet pile walls 2, 2, first the supporting material 4 on the uppermost stage is installed, second the water level of the water surface between the sheet pile walls 2, 2 is lowered to move the supporting materials 5, 6 to near the installation position of the supporting material 5 on the next stage, the supporting material 5 is installed and, at the same time, the movement and installation of the supporting material 6 on the lowermost stage are performed. Thus, even a long single supporting material can be moved easily to an installation position and installed.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2000352026A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2000352026A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2000352026A3</originalsourceid><addsrcrecordid>eNrjZPD0dQ3x8HdRcPMPUvD0Cw5x9PFxDPH091Pwd1MIDg0I8A8K8fRzV_B1DHEN8nT0Aatz9ndzcw1ycfQFsoBagkKdQTp4GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8V4CRgYGBsamRgZGZozFRigC3GC3e</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR INSTALLATION OF SUPPORTING MATERIAL FOR COFFERDAM CONSTRUCTION</title><source>esp@cenet</source><creator>SHINOHE KAZUO ; MURAKAMI KOJI ; NAEMURA KOZO</creator><creatorcontrib>SHINOHE KAZUO ; MURAKAMI KOJI ; NAEMURA KOZO</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a method for installation of supporting material for cofferdam construction capable of installing even a long single supporting material by easily moving it to an installation position and capable of expecting an increase in construction efficiency. SOLUTION: After sheet pile walls 2, 2 for cofferdam construction are installed drivingly, specified stages of supporting materials 4, 5, 6 are floated on water surface between the sheet pile walls 2, 2, first the supporting material 4 on the uppermost stage is installed, second the water level of the water surface between the sheet pile walls 2, 2 is lowered to move the supporting materials 5, 6 to near the installation position of the supporting material 5 on the next stage, the supporting material 5 is installed and, at the same time, the movement and installation of the supporting material 6 on the lowermost stage are performed. Thus, even a long single supporting material can be moved easily to an installation position and installed.</description><edition>7</edition><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2000</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20001219&amp;DB=EPODOC&amp;CC=JP&amp;NR=2000352026A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20001219&amp;DB=EPODOC&amp;CC=JP&amp;NR=2000352026A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SHINOHE KAZUO</creatorcontrib><creatorcontrib>MURAKAMI KOJI</creatorcontrib><creatorcontrib>NAEMURA KOZO</creatorcontrib><title>METHOD FOR INSTALLATION OF SUPPORTING MATERIAL FOR COFFERDAM CONSTRUCTION</title><description>PROBLEM TO BE SOLVED: To provide a method for installation of supporting material for cofferdam construction capable of installing even a long single supporting material by easily moving it to an installation position and capable of expecting an increase in construction efficiency. SOLUTION: After sheet pile walls 2, 2 for cofferdam construction are installed drivingly, specified stages of supporting materials 4, 5, 6 are floated on water surface between the sheet pile walls 2, 2, first the supporting material 4 on the uppermost stage is installed, second the water level of the water surface between the sheet pile walls 2, 2 is lowered to move the supporting materials 5, 6 to near the installation position of the supporting material 5 on the next stage, the supporting material 5 is installed and, at the same time, the movement and installation of the supporting material 6 on the lowermost stage are performed. Thus, even a long single supporting material can be moved easily to an installation position and installed.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2000</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPD0dQ3x8HdRcPMPUvD0Cw5x9PFxDPH091Pwd1MIDg0I8A8K8fRzV_B1DHEN8nT0Aatz9ndzcw1ycfQFsoBagkKdQTp4GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8V4CRgYGBsamRgZGZozFRigC3GC3e</recordid><startdate>20001219</startdate><enddate>20001219</enddate><creator>SHINOHE KAZUO</creator><creator>MURAKAMI KOJI</creator><creator>NAEMURA KOZO</creator><scope>EVB</scope></search><sort><creationdate>20001219</creationdate><title>METHOD FOR INSTALLATION OF SUPPORTING MATERIAL FOR COFFERDAM CONSTRUCTION</title><author>SHINOHE KAZUO ; MURAKAMI KOJI ; NAEMURA KOZO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2000352026A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2000</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>SHINOHE KAZUO</creatorcontrib><creatorcontrib>MURAKAMI KOJI</creatorcontrib><creatorcontrib>NAEMURA KOZO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SHINOHE KAZUO</au><au>MURAKAMI KOJI</au><au>NAEMURA KOZO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR INSTALLATION OF SUPPORTING MATERIAL FOR COFFERDAM CONSTRUCTION</title><date>2000-12-19</date><risdate>2000</risdate><abstract>PROBLEM TO BE SOLVED: To provide a method for installation of supporting material for cofferdam construction capable of installing even a long single supporting material by easily moving it to an installation position and capable of expecting an increase in construction efficiency. SOLUTION: After sheet pile walls 2, 2 for cofferdam construction are installed drivingly, specified stages of supporting materials 4, 5, 6 are floated on water surface between the sheet pile walls 2, 2, first the supporting material 4 on the uppermost stage is installed, second the water level of the water surface between the sheet pile walls 2, 2 is lowered to move the supporting materials 5, 6 to near the installation position of the supporting material 5 on the next stage, the supporting material 5 is installed and, at the same time, the movement and installation of the supporting material 6 on the lowermost stage are performed. Thus, even a long single supporting material can be moved easily to an installation position and installed.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JP2000352026A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title METHOD FOR INSTALLATION OF SUPPORTING MATERIAL FOR COFFERDAM CONSTRUCTION
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T13%3A42%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SHINOHE%20KAZUO&rft.date=2000-12-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2000352026A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true