MOVING TIMBERING CONSTRUCTION METHOD FOR BRIDGE FLOOR SLAB OVERHANG SECTION

PROBLEM TO BE SOLVED: To simplify the timbering of a horizontal overhang floor system frame form and omit wires, rods, flush type fixtures, etc., in constructing a steel bridge having a small number of main girders. SOLUTION: Large beams 15 and 15 are built over in the axis direction of a bridge in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ARAYOSHI SHINICHI, ITO AKIYA, UENO MAKOTO, MORI TAKAYUKI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!