REINFORCING METHOD OF BANK
PROBLEM TO BE SOLVED: To surely and quickly reinforce a bank by filling an appropriate container with concrete, and arranging the container at the prescribed parts of the bank as concrete remains in non-hardened state. SOLUTION: An opening part is formed in the upper part of a cloth-made or syntheti...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | YOSHINO MASASHI KANEKO JUNICHI MATSUZAKI TAKAAKI |
description | PROBLEM TO BE SOLVED: To surely and quickly reinforce a bank by filling an appropriate container with concrete, and arranging the container at the prescribed parts of the bank as concrete remains in non-hardened state. SOLUTION: An opening part is formed in the upper part of a cloth-made or synthetic resin-made container 2 to provide a cover part on the opening part, and a suspension part is provided on the container 2. During execution, after a crane truck 9 and a truck mixer 10 are arranged in the neighborhood of the breaking prediction place of a bank 1, the container is filled with ready- mixed concrete appropriately blending aggregate at the place, the opening part is blocked by a string, the container is hung up by the crane truck 9, and successively disposed in recess parts 4 formed at the prescribed parts of the face of the side of a river 11. Since concrete is not hardened yet, the disposed container 2 deforms along the shape of the recess part 4 to bury the recess part 4 well. Thereby the bank 1 can be reinforced surely and quickly. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2000120038A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2000120038A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2000120038A3</originalsourceid><addsrcrecordid>eNrjZJAKcvX0c_MPcvb0c1fwdQ3x8HdR8HdTcHL08-ZhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGBgaGQMLYwtGYKEUAXA4gXQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>REINFORCING METHOD OF BANK</title><source>esp@cenet</source><creator>YOSHINO MASASHI ; KANEKO JUNICHI ; MATSUZAKI TAKAAKI</creator><creatorcontrib>YOSHINO MASASHI ; KANEKO JUNICHI ; MATSUZAKI TAKAAKI</creatorcontrib><description>PROBLEM TO BE SOLVED: To surely and quickly reinforce a bank by filling an appropriate container with concrete, and arranging the container at the prescribed parts of the bank as concrete remains in non-hardened state. SOLUTION: An opening part is formed in the upper part of a cloth-made or synthetic resin-made container 2 to provide a cover part on the opening part, and a suspension part is provided on the container 2. During execution, after a crane truck 9 and a truck mixer 10 are arranged in the neighborhood of the breaking prediction place of a bank 1, the container is filled with ready- mixed concrete appropriately blending aggregate at the place, the opening part is blocked by a string, the container is hung up by the crane truck 9, and successively disposed in recess parts 4 formed at the prescribed parts of the face of the side of a river 11. Since concrete is not hardened yet, the disposed container 2 deforms along the shape of the recess part 4 to bury the recess part 4 well. Thereby the bank 1 can be reinforced surely and quickly.</description><edition>7</edition><language>eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>2000</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20000425&DB=EPODOC&CC=JP&NR=2000120038A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20000425&DB=EPODOC&CC=JP&NR=2000120038A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YOSHINO MASASHI</creatorcontrib><creatorcontrib>KANEKO JUNICHI</creatorcontrib><creatorcontrib>MATSUZAKI TAKAAKI</creatorcontrib><title>REINFORCING METHOD OF BANK</title><description>PROBLEM TO BE SOLVED: To surely and quickly reinforce a bank by filling an appropriate container with concrete, and arranging the container at the prescribed parts of the bank as concrete remains in non-hardened state. SOLUTION: An opening part is formed in the upper part of a cloth-made or synthetic resin-made container 2 to provide a cover part on the opening part, and a suspension part is provided on the container 2. During execution, after a crane truck 9 and a truck mixer 10 are arranged in the neighborhood of the breaking prediction place of a bank 1, the container is filled with ready- mixed concrete appropriately blending aggregate at the place, the opening part is blocked by a string, the container is hung up by the crane truck 9, and successively disposed in recess parts 4 formed at the prescribed parts of the face of the side of a river 11. Since concrete is not hardened yet, the disposed container 2 deforms along the shape of the recess part 4 to bury the recess part 4 well. Thereby the bank 1 can be reinforced surely and quickly.</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2000</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAKcvX0c_MPcvb0c1fwdQ3x8HdR8HdTcHL08-ZhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGBgaGQMLYwtGYKEUAXA4gXQ</recordid><startdate>20000425</startdate><enddate>20000425</enddate><creator>YOSHINO MASASHI</creator><creator>KANEKO JUNICHI</creator><creator>MATSUZAKI TAKAAKI</creator><scope>EVB</scope></search><sort><creationdate>20000425</creationdate><title>REINFORCING METHOD OF BANK</title><author>YOSHINO MASASHI ; KANEKO JUNICHI ; MATSUZAKI TAKAAKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2000120038A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2000</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>YOSHINO MASASHI</creatorcontrib><creatorcontrib>KANEKO JUNICHI</creatorcontrib><creatorcontrib>MATSUZAKI TAKAAKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YOSHINO MASASHI</au><au>KANEKO JUNICHI</au><au>MATSUZAKI TAKAAKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>REINFORCING METHOD OF BANK</title><date>2000-04-25</date><risdate>2000</risdate><abstract>PROBLEM TO BE SOLVED: To surely and quickly reinforce a bank by filling an appropriate container with concrete, and arranging the container at the prescribed parts of the bank as concrete remains in non-hardened state. SOLUTION: An opening part is formed in the upper part of a cloth-made or synthetic resin-made container 2 to provide a cover part on the opening part, and a suspension part is provided on the container 2. During execution, after a crane truck 9 and a truck mixer 10 are arranged in the neighborhood of the breaking prediction place of a bank 1, the container is filled with ready- mixed concrete appropriately blending aggregate at the place, the opening part is blocked by a string, the container is hung up by the crane truck 9, and successively disposed in recess parts 4 formed at the prescribed parts of the face of the side of a river 11. Since concrete is not hardened yet, the disposed container 2 deforms along the shape of the recess part 4 to bury the recess part 4 well. Thereby the bank 1 can be reinforced surely and quickly.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2000120038A |
source | esp@cenet |
subjects | FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING |
title | REINFORCING METHOD OF BANK |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T14%3A39%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YOSHINO%20MASASHI&rft.date=2000-04-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2000120038A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |