CONCRETE PLACING EQUIPMENT AND PLACING METHOD IN SLIP FORM CONSTRUCTION
PROBLEM TO BE SOLVED: To provide a concrete placing equipment and placing method in a slip form construction method which can effectively carry out an execution. SOLUTION: A plurality of openable valves 8 are provided at spaces on a horizontal placing pipe 6 provided on the scaffold frame of a slip...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TANAKA HITOSHI HANDA SHIGETO TSUKAHARA YUICHI SUGIBASHI NAOYUKI |
description | PROBLEM TO BE SOLVED: To provide a concrete placing equipment and placing method in a slip form construction method which can effectively carry out an execution. SOLUTION: A plurality of openable valves 8 are provided at spaces on a horizontal placing pipe 6 provided on the scaffold frame of a slip form mold to successively ascend with the progress of execution, and a placing hose 6 is connected to each of the valves 8. In a process for placing the concrete into the slip form mold, the concrete is supplied to the horizontal placing pipe 6, and a plurality of valves 8 provided on the horizontal placing pipe 6 is successively opened to place the concrete in a space inside the mold. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2000073564A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2000073564A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2000073564A3</originalsourceid><addsrcrecordid>eNrjZHB39vdzDnINcVUI8HF09vRzV3ANDPUM8HX1C1Fw9HOBi_q6hnj4uyh4-ikE-3gGKLj5B_kqALUGhwSFOod4-vvxMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4rwAjAyAwNzY1M3E0JkoRAC5zLQE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONCRETE PLACING EQUIPMENT AND PLACING METHOD IN SLIP FORM CONSTRUCTION</title><source>esp@cenet</source><creator>TANAKA HITOSHI ; HANDA SHIGETO ; TSUKAHARA YUICHI ; SUGIBASHI NAOYUKI</creator><creatorcontrib>TANAKA HITOSHI ; HANDA SHIGETO ; TSUKAHARA YUICHI ; SUGIBASHI NAOYUKI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a concrete placing equipment and placing method in a slip form construction method which can effectively carry out an execution. SOLUTION: A plurality of openable valves 8 are provided at spaces on a horizontal placing pipe 6 provided on the scaffold frame of a slip form mold to successively ascend with the progress of execution, and a placing hose 6 is connected to each of the valves 8. In a process for placing the concrete into the slip form mold, the concrete is supplied to the horizontal placing pipe 6, and a plurality of valves 8 provided on the horizontal placing pipe 6 is successively opened to place the concrete in a space inside the mold.</description><edition>7</edition><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2000</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20000307&DB=EPODOC&CC=JP&NR=2000073564A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20000307&DB=EPODOC&CC=JP&NR=2000073564A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TANAKA HITOSHI</creatorcontrib><creatorcontrib>HANDA SHIGETO</creatorcontrib><creatorcontrib>TSUKAHARA YUICHI</creatorcontrib><creatorcontrib>SUGIBASHI NAOYUKI</creatorcontrib><title>CONCRETE PLACING EQUIPMENT AND PLACING METHOD IN SLIP FORM CONSTRUCTION</title><description>PROBLEM TO BE SOLVED: To provide a concrete placing equipment and placing method in a slip form construction method which can effectively carry out an execution. SOLUTION: A plurality of openable valves 8 are provided at spaces on a horizontal placing pipe 6 provided on the scaffold frame of a slip form mold to successively ascend with the progress of execution, and a placing hose 6 is connected to each of the valves 8. In a process for placing the concrete into the slip form mold, the concrete is supplied to the horizontal placing pipe 6, and a plurality of valves 8 provided on the horizontal placing pipe 6 is successively opened to place the concrete in a space inside the mold.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2000</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHB39vdzDnINcVUI8HF09vRzV3ANDPUM8HX1C1Fw9HOBi_q6hnj4uyh4-ikE-3gGKLj5B_kqALUGhwSFOod4-vvxMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4rwAjAyAwNzY1M3E0JkoRAC5zLQE</recordid><startdate>20000307</startdate><enddate>20000307</enddate><creator>TANAKA HITOSHI</creator><creator>HANDA SHIGETO</creator><creator>TSUKAHARA YUICHI</creator><creator>SUGIBASHI NAOYUKI</creator><scope>EVB</scope></search><sort><creationdate>20000307</creationdate><title>CONCRETE PLACING EQUIPMENT AND PLACING METHOD IN SLIP FORM CONSTRUCTION</title><author>TANAKA HITOSHI ; HANDA SHIGETO ; TSUKAHARA YUICHI ; SUGIBASHI NAOYUKI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2000073564A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2000</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>TANAKA HITOSHI</creatorcontrib><creatorcontrib>HANDA SHIGETO</creatorcontrib><creatorcontrib>TSUKAHARA YUICHI</creatorcontrib><creatorcontrib>SUGIBASHI NAOYUKI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TANAKA HITOSHI</au><au>HANDA SHIGETO</au><au>TSUKAHARA YUICHI</au><au>SUGIBASHI NAOYUKI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONCRETE PLACING EQUIPMENT AND PLACING METHOD IN SLIP FORM CONSTRUCTION</title><date>2000-03-07</date><risdate>2000</risdate><abstract>PROBLEM TO BE SOLVED: To provide a concrete placing equipment and placing method in a slip form construction method which can effectively carry out an execution. SOLUTION: A plurality of openable valves 8 are provided at spaces on a horizontal placing pipe 6 provided on the scaffold frame of a slip form mold to successively ascend with the progress of execution, and a placing hose 6 is connected to each of the valves 8. In a process for placing the concrete into the slip form mold, the concrete is supplied to the horizontal placing pipe 6, and a plurality of valves 8 provided on the horizontal placing pipe 6 is successively opened to place the concrete in a space inside the mold.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2000073564A |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | CONCRETE PLACING EQUIPMENT AND PLACING METHOD IN SLIP FORM CONSTRUCTION |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T18%3A55%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TANAKA%20HITOSHI&rft.date=2000-03-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2000073564A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |