Installation of subsea risers

A method of installing a wave-configuration subsea riser 32 of unbonded flexible pipe comprises lowering the riser progressively into the sea from an installation vessel 30 while suspending an elongate clump weight 38 in a catenary shape that comprises first 70 and second 72 limbs extending upwardly...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Alberto Lima Dos Santos, Mauricio Suarez De Oliveira, Davi Couto Neves Junior, Andre Ramiro Amorim
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Alberto Lima Dos Santos
Mauricio Suarez De Oliveira
Davi Couto Neves Junior
Andre Ramiro Amorim
description A method of installing a wave-configuration subsea riser 32 of unbonded flexible pipe comprises lowering the riser progressively into the sea from an installation vessel 30 while suspending an elongate clump weight 38 in a catenary shape that comprises first 70 and second 72 limbs extending upwardly from a conjoining bottom portion 74. An upper end of the first limb, at a distal end of the clump weight 38, is attached 46 to the riser and an upper end of the second limb 70, at a proximal end of the clump weight 38, is suspended from a winch 66 or crane of the vessel 30. While lowering the riser 32 from the vessel 30, the weight load applied to the riser 32 by the clump weight 38 is controlled by adjusting the relative lengths of the first 70 and second limbs 72 of the clump weight 38.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_GB2583108A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>GB2583108A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_GB2583108A3</originalsourceid><addsrcrecordid>eNrjZJD1zCsuSczJSSzJzM9TyE9TKC5NKk5NVCjKLE4tKuZhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHuTkamFsaGBhaOxoRVAABRbyNo</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installation of subsea risers</title><source>esp@cenet</source><creator>Alberto Lima Dos Santos ; Mauricio Suarez De Oliveira ; Davi Couto Neves Junior ; Andre Ramiro Amorim</creator><creatorcontrib>Alberto Lima Dos Santos ; Mauricio Suarez De Oliveira ; Davi Couto Neves Junior ; Andre Ramiro Amorim</creatorcontrib><description>A method of installing a wave-configuration subsea riser 32 of unbonded flexible pipe comprises lowering the riser progressively into the sea from an installation vessel 30 while suspending an elongate clump weight 38 in a catenary shape that comprises first 70 and second 72 limbs extending upwardly from a conjoining bottom portion 74. An upper end of the first limb, at a distal end of the clump weight 38, is attached 46 to the riser and an upper end of the second limb 70, at a proximal end of the clump weight 38, is suspended from a winch 66 or crane of the vessel 30. While lowering the riser 32 from the vessel 30, the weight load applied to the riser 32 by the clump weight 38 is controlled by adjusting the relative lengths of the first 70 and second limbs 72 of the clump weight 38.</description><language>eng</language><subject>BLASTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; ENGINEERING ELEMENTS AND UNITS ; EQUIPMENT FOR SHIPPING ; FIXED CONSTRUCTIONS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PERFORMING OPERATIONS ; PIPES ; RELATED EQUIPMENT ; SHIPS OR OTHER WATERBORNE VESSELS ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; TRANSPORTING ; WEAPONS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201021&amp;DB=EPODOC&amp;CC=GB&amp;NR=2583108A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20201021&amp;DB=EPODOC&amp;CC=GB&amp;NR=2583108A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Alberto Lima Dos Santos</creatorcontrib><creatorcontrib>Mauricio Suarez De Oliveira</creatorcontrib><creatorcontrib>Davi Couto Neves Junior</creatorcontrib><creatorcontrib>Andre Ramiro Amorim</creatorcontrib><title>Installation of subsea risers</title><description>A method of installing a wave-configuration subsea riser 32 of unbonded flexible pipe comprises lowering the riser progressively into the sea from an installation vessel 30 while suspending an elongate clump weight 38 in a catenary shape that comprises first 70 and second 72 limbs extending upwardly from a conjoining bottom portion 74. An upper end of the first limb, at a distal end of the clump weight 38, is attached 46 to the riser and an upper end of the second limb 70, at a proximal end of the clump weight 38, is suspended from a winch 66 or crane of the vessel 30. While lowering the riser 32 from the vessel 30, the weight load applied to the riser 32 by the clump weight 38 is controlled by adjusting the relative lengths of the first 70 and second limbs 72 of the clump weight 38.</description><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>EQUIPMENT FOR SHIPPING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PERFORMING OPERATIONS</subject><subject>PIPES</subject><subject>RELATED EQUIPMENT</subject><subject>SHIPS OR OTHER WATERBORNE VESSELS</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>TRANSPORTING</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJD1zCsuSczJSSzJzM9TyE9TKC5NKk5NVCjKLE4tKuZhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHuTkamFsaGBhaOxoRVAABRbyNo</recordid><startdate>20201021</startdate><enddate>20201021</enddate><creator>Alberto Lima Dos Santos</creator><creator>Mauricio Suarez De Oliveira</creator><creator>Davi Couto Neves Junior</creator><creator>Andre Ramiro Amorim</creator><scope>EVB</scope></search><sort><creationdate>20201021</creationdate><title>Installation of subsea risers</title><author>Alberto Lima Dos Santos ; Mauricio Suarez De Oliveira ; Davi Couto Neves Junior ; Andre Ramiro Amorim</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_GB2583108A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2020</creationdate><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>EQUIPMENT FOR SHIPPING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PERFORMING OPERATIONS</topic><topic>PIPES</topic><topic>RELATED EQUIPMENT</topic><topic>SHIPS OR OTHER WATERBORNE VESSELS</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>TRANSPORTING</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>Alberto Lima Dos Santos</creatorcontrib><creatorcontrib>Mauricio Suarez De Oliveira</creatorcontrib><creatorcontrib>Davi Couto Neves Junior</creatorcontrib><creatorcontrib>Andre Ramiro Amorim</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Alberto Lima Dos Santos</au><au>Mauricio Suarez De Oliveira</au><au>Davi Couto Neves Junior</au><au>Andre Ramiro Amorim</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installation of subsea risers</title><date>2020-10-21</date><risdate>2020</risdate><abstract>A method of installing a wave-configuration subsea riser 32 of unbonded flexible pipe comprises lowering the riser progressively into the sea from an installation vessel 30 while suspending an elongate clump weight 38 in a catenary shape that comprises first 70 and second 72 limbs extending upwardly from a conjoining bottom portion 74. An upper end of the first limb, at a distal end of the clump weight 38, is attached 46 to the riser and an upper end of the second limb 70, at a proximal end of the clump weight 38, is suspended from a winch 66 or crane of the vessel 30. While lowering the riser 32 from the vessel 30, the weight load applied to the riser 32 by the clump weight 38 is controlled by adjusting the relative lengths of the first 70 and second limbs 72 of the clump weight 38.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_GB2583108A
source esp@cenet
subjects BLASTING
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
ENGINEERING ELEMENTS AND UNITS
EQUIPMENT FOR SHIPPING
FIXED CONSTRUCTIONS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
PERFORMING OPERATIONS
PIPES
RELATED EQUIPMENT
SHIPS OR OTHER WATERBORNE VESSELS
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
TRANSPORTING
WEAPONS
title Installation of subsea risers
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T00%3A30%3A46IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Alberto%20Lima%20Dos%20Santos&rft.date=2020-10-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EGB2583108A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true