Power distribution system having priority Load Control

A power distribution system is disclosed. The power distribution system may have a generator, a first load interruption device associated with the generator, and a load powered by the generator. The power distribution system may also have a second load interruption device associated with the load, a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KEITH FOLKEN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KEITH FOLKEN
description A power distribution system is disclosed. The power distribution system may have a generator, a first load interruption device associated with the generator, and a load powered by the generator. The power distribution system may also have a second load interruption device associated with the load, and a generator controller. The generator controller may be configured to control the generator, determine existence of a fault condition associated with electric service between the generator and the load, and selectively activate the second load interruption device based on the determination. The generator controller may be further configured to determine if activation of the second load interruption device isolated the fault condition, and selectively activate the first load interruption device when activation of the second load interruption device fails to isolate the fault condition.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_GB2503532B</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>GB2503532B</sourcerecordid><originalsourceid>FETCH-epo_espacenet_GB2503532B3</originalsourceid><addsrcrecordid>eNrjZDALyC9PLVJIySwuKcpMKi3JzM9TKK4sLknNVchILMvMS1coKMrML8osqVTwyU9MUXDOzyspys_hYWBNS8wpTuWF0twM8m6uIc4euqkF-fGpxQWJyal5qSXx7k5GpgbGpsZGTsaEVQAAK_wtJQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Power distribution system having priority Load Control</title><source>esp@cenet</source><creator>KEITH FOLKEN</creator><creatorcontrib>KEITH FOLKEN</creatorcontrib><description>A power distribution system is disclosed. The power distribution system may have a generator, a first load interruption device associated with the generator, and a load powered by the generator. The power distribution system may also have a second load interruption device associated with the load, and a generator controller. The generator controller may be configured to control the generator, determine existence of a fault condition associated with electric service between the generator and the load, and selectively activate the second load interruption device based on the determination. The generator controller may be further configured to determine if activation of the second load interruption device isolated the fault condition, and selectively activate the first load interruption device when activation of the second load interruption device fails to isolate the fault condition.</description><language>eng</language><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER ; CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORSOR DYNAMO-ELECTRIC CONVERTERS ; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS ; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER ; ELECTRICITY ; EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS ; GENERATION ; SYSTEMS FOR STORING ELECTRIC ENERGY</subject><creationdate>2015</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150729&amp;DB=EPODOC&amp;CC=GB&amp;NR=2503532B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20150729&amp;DB=EPODOC&amp;CC=GB&amp;NR=2503532B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KEITH FOLKEN</creatorcontrib><title>Power distribution system having priority Load Control</title><description>A power distribution system is disclosed. The power distribution system may have a generator, a first load interruption device associated with the generator, and a load powered by the generator. The power distribution system may also have a second load interruption device associated with the load, and a generator controller. The generator controller may be configured to control the generator, determine existence of a fault condition associated with electric service between the generator and the load, and selectively activate the second load interruption device based on the determination. The generator controller may be further configured to determine if activation of the second load interruption device isolated the fault condition, and selectively activate the first load interruption device when activation of the second load interruption device fails to isolate the fault condition.</description><subject>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</subject><subject>CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORSOR DYNAMO-ELECTRIC CONVERTERS</subject><subject>CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS</subject><subject>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</subject><subject>ELECTRICITY</subject><subject>EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS</subject><subject>GENERATION</subject><subject>SYSTEMS FOR STORING ELECTRIC ENERGY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2015</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDALyC9PLVJIySwuKcpMKi3JzM9TKK4sLknNVchILMvMS1coKMrML8osqVTwyU9MUXDOzyspys_hYWBNS8wpTuWF0twM8m6uIc4euqkF-fGpxQWJyal5qSXx7k5GpgbGpsZGTsaEVQAAK_wtJQ</recordid><startdate>20150729</startdate><enddate>20150729</enddate><creator>KEITH FOLKEN</creator><scope>EVB</scope></search><sort><creationdate>20150729</creationdate><title>Power distribution system having priority Load Control</title><author>KEITH FOLKEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_GB2503532B3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2015</creationdate><topic>CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER</topic><topic>CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORSOR DYNAMO-ELECTRIC CONVERTERS</topic><topic>CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS</topic><topic>CONVERSION OR DISTRIBUTION OF ELECTRIC POWER</topic><topic>ELECTRICITY</topic><topic>EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS</topic><topic>GENERATION</topic><topic>SYSTEMS FOR STORING ELECTRIC ENERGY</topic><toplevel>online_resources</toplevel><creatorcontrib>KEITH FOLKEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KEITH FOLKEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Power distribution system having priority Load Control</title><date>2015-07-29</date><risdate>2015</risdate><abstract>A power distribution system is disclosed. The power distribution system may have a generator, a first load interruption device associated with the generator, and a load powered by the generator. The power distribution system may also have a second load interruption device associated with the load, and a generator controller. The generator controller may be configured to control the generator, determine existence of a fault condition associated with electric service between the generator and the load, and selectively activate the second load interruption device based on the determination. The generator controller may be further configured to determine if activation of the second load interruption device isolated the fault condition, and selectively activate the first load interruption device when activation of the second load interruption device fails to isolate the fault condition.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_GB2503532B
source esp@cenet
subjects CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTINGELECTRIC POWER
CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORSOR DYNAMO-ELECTRIC CONVERTERS
CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
ELECTRICITY
EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
GENERATION
SYSTEMS FOR STORING ELECTRIC ENERGY
title Power distribution system having priority Load Control
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T04%3A18%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KEITH%20FOLKEN&rft.date=2015-07-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EGB2503532B%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true