Net cage construction
A net cage construction (50) is described comprising a number of floating tubes (12) and also a number of clamps (10) arranged mutually spaced apart around the floating tubes (12), where said clamps (10) comprise at least two ring-formed casings (22) with a respective through-running opening (14) th...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A net cage construction (50) is described comprising a number of floating tubes (12) and also a number of clamps (10) arranged mutually spaced apart around the floating tubes (12), where said clamps (10) comprise at least two ring-formed casings (22) with a respective through-running opening (14) that surrounds the floating tube (12), and which is connected via intermediate cross struts (24, 26, 28) to take up and retain the respective floating tubes (12), and that in said cross struts is arranged a connection (16) for rods (18) or chains that run to other clamps (10) on the net cage (50). Said connection (16) is formed as a common quick connection for the uptake of said rods (18) or chains and for the uptake of mooring chains (20), as the rods (18) or the chains arranged between mutual clamps (10) are arranged to take up the primary forces that run around the net cage construction (50) to relieve the forces in the floating tubes (12), and that said primary forces are transferred via the common connection (16) to the mooring chains (20). A method of assembling a net cage construction is also described. |
---|