Sand control completion having smart well capability and method for use of same
A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114,...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | TRAVIS T HAILEY JR WILLIAM LAUNEY VIDRINE |
description | A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_GB2435063A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>GB2435063A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_GB2435063A3</originalsourceid><addsrcrecordid>eNqFi8EOATEQQHtxEHyD-YFNRHFHFjcH7puxO7VN2pmmHcTfW4m70zu898bmfEHuoBXWLGFgTIHUC0OPT893KBGzwovCIDHhzQevb_g-kbSXDpxkeBQCcVAw0tSMHIZCsx8nZn6or_tTRUkaKglbYtLmuFuu7HqxsVv7v_gAdp81zg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Sand control completion having smart well capability and method for use of same</title><source>esp@cenet</source><creator>TRAVIS T HAILEY JR ; WILLIAM LAUNEY VIDRINE</creator><creatorcontrib>TRAVIS T HAILEY JR ; WILLIAM LAUNEY VIDRINE</creatorcontrib><description>A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20070815&DB=EPODOC&CC=GB&NR=2435063A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20070815&DB=EPODOC&CC=GB&NR=2435063A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TRAVIS T HAILEY JR</creatorcontrib><creatorcontrib>WILLIAM LAUNEY VIDRINE</creatorcontrib><title>Sand control completion having smart well capability and method for use of same</title><description>A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqFi8EOATEQQHtxEHyD-YFNRHFHFjcH7puxO7VN2pmmHcTfW4m70zu898bmfEHuoBXWLGFgTIHUC0OPT893KBGzwovCIDHhzQevb_g-kbSXDpxkeBQCcVAw0tSMHIZCsx8nZn6or_tTRUkaKglbYtLmuFuu7HqxsVv7v_gAdp81zg</recordid><startdate>20070815</startdate><enddate>20070815</enddate><creator>TRAVIS T HAILEY JR</creator><creator>WILLIAM LAUNEY VIDRINE</creator><scope>EVB</scope></search><sort><creationdate>20070815</creationdate><title>Sand control completion having smart well capability and method for use of same</title><author>TRAVIS T HAILEY JR ; WILLIAM LAUNEY VIDRINE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_GB2435063A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>TRAVIS T HAILEY JR</creatorcontrib><creatorcontrib>WILLIAM LAUNEY VIDRINE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TRAVIS T HAILEY JR</au><au>WILLIAM LAUNEY VIDRINE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Sand control completion having smart well capability and method for use of same</title><date>2007-08-15</date><risdate>2007</risdate><abstract>A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_GB2435063A |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | Sand control completion having smart well capability and method for use of same |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T05%3A07%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TRAVIS%20T%20HAILEY%20JR&rft.date=2007-08-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EGB2435063A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |