Sand control completion having smart well capability and method for use of same

A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TRAVIS T HAILEY JR, WILLIAM LAUNEY VIDRINE
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TRAVIS T HAILEY JR
WILLIAM LAUNEY VIDRINE
description A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_GB2435063A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>GB2435063A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_GB2435063A3</originalsourceid><addsrcrecordid>eNqFi8EOATEQQHtxEHyD-YFNRHFHFjcH7puxO7VN2pmmHcTfW4m70zu898bmfEHuoBXWLGFgTIHUC0OPT893KBGzwovCIDHhzQevb_g-kbSXDpxkeBQCcVAw0tSMHIZCsx8nZn6or_tTRUkaKglbYtLmuFuu7HqxsVv7v_gAdp81zg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Sand control completion having smart well capability and method for use of same</title><source>esp@cenet</source><creator>TRAVIS T HAILEY JR ; WILLIAM LAUNEY VIDRINE</creator><creatorcontrib>TRAVIS T HAILEY JR ; WILLIAM LAUNEY VIDRINE</creatorcontrib><description>A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070815&amp;DB=EPODOC&amp;CC=GB&amp;NR=2435063A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070815&amp;DB=EPODOC&amp;CC=GB&amp;NR=2435063A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TRAVIS T HAILEY JR</creatorcontrib><creatorcontrib>WILLIAM LAUNEY VIDRINE</creatorcontrib><title>Sand control completion having smart well capability and method for use of same</title><description>A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqFi8EOATEQQHtxEHyD-YFNRHFHFjcH7puxO7VN2pmmHcTfW4m70zu898bmfEHuoBXWLGFgTIHUC0OPT893KBGzwovCIDHhzQevb_g-kbSXDpxkeBQCcVAw0tSMHIZCsx8nZn6or_tTRUkaKglbYtLmuFuu7HqxsVv7v_gAdp81zg</recordid><startdate>20070815</startdate><enddate>20070815</enddate><creator>TRAVIS T HAILEY JR</creator><creator>WILLIAM LAUNEY VIDRINE</creator><scope>EVB</scope></search><sort><creationdate>20070815</creationdate><title>Sand control completion having smart well capability and method for use of same</title><author>TRAVIS T HAILEY JR ; WILLIAM LAUNEY VIDRINE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_GB2435063A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>TRAVIS T HAILEY JR</creatorcontrib><creatorcontrib>WILLIAM LAUNEY VIDRINE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TRAVIS T HAILEY JR</au><au>WILLIAM LAUNEY VIDRINE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Sand control completion having smart well capability and method for use of same</title><date>2007-08-15</date><risdate>2007</risdate><abstract>A sand control completion (100) for installation in a wellbore (102) includes first and second packers (114, 116) that define a first zone (110) in the wellbore (102). A production tubing (120) extends substantially through the first zone (110). Positioned between the first and second packers (114, 116) are a sand control screen (130), an inflow control valve (122) and a crossover valve (126). The sand control screen forms a first annulus (152) with the production tubing (120) and a second annulus with the wellbore (102). The inflow control valve (122) is operable to selectively allow and prevent fluid communication between the first annulus (152) and the interior of the production tubing (120). The crossover valve (126) is operable to selectively allow and prevent fluid communication between the production tubing (120) and the second annulus.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_GB2435063A
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title Sand control completion having smart well capability and method for use of same
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T05%3A07%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TRAVIS%20T%20HAILEY%20JR&rft.date=2007-08-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EGB2435063A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true