PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM
A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LASZLO VARKONYI CSABA ASSZONYI GYULA VACI |
description | A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B). |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_GB2187923B</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>GB2187923B</sourcerecordid><originalsourceid>FETCH-epo_espacenet_GB2187923B3</originalsourceid><addsrcrecordid>eNrjZNAJCPJ3dg0OVnDzD1II8XBVcPb3Cw4JCnUO8fT3U_B3U3AJcvT0UwiODA5x9eVhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHuTkaGFuaWRsZOxoRVAAAXgCR7</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><source>esp@cenet</source><creator>LASZLO VARKONYI ; CSABA ASSZONYI ; GYULA VACI</creator><creatorcontrib>LASZLO VARKONYI ; CSABA ASSZONYI ; GYULA VACI</creatorcontrib><description>A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).</description><language>eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>1990</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19900718&DB=EPODOC&CC=GB&NR=2187923B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19900718&DB=EPODOC&CC=GB&NR=2187923B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LASZLO VARKONYI</creatorcontrib><creatorcontrib>CSABA ASSZONYI</creatorcontrib><creatorcontrib>GYULA VACI</creatorcontrib><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><description>A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1990</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAJCPJ3dg0OVnDzD1II8XBVcPb3Cw4JCnUO8fT3U_B3U3AJcvT0UwiODA5x9eVhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHuTkaGFuaWRsZOxoRVAAAXgCR7</recordid><startdate>19900718</startdate><enddate>19900718</enddate><creator>LASZLO VARKONYI</creator><creator>CSABA ASSZONYI</creator><creator>GYULA VACI</creator><scope>EVB</scope></search><sort><creationdate>19900718</creationdate><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><author>LASZLO VARKONYI ; CSABA ASSZONYI ; GYULA VACI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_GB2187923B3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1990</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LASZLO VARKONYI</creatorcontrib><creatorcontrib>CSABA ASSZONYI</creatorcontrib><creatorcontrib>GYULA VACI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LASZLO VARKONYI</au><au>CSABA ASSZONYI</au><au>GYULA VACI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><date>1990-07-18</date><risdate>1990</risdate><abstract>A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_GB2187923B |
source | esp@cenet |
subjects | FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING |
title | PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T09%3A36%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LASZLO%20VARKONYI&rft.date=1990-07-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EGB2187923B%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |