PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM

A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LASZLO VARKONYI, CSABA ASSZONYI, GYULA VACI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LASZLO VARKONYI
CSABA ASSZONYI
GYULA VACI
description A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_GB2187923B</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>GB2187923B</sourcerecordid><originalsourceid>FETCH-epo_espacenet_GB2187923B3</originalsourceid><addsrcrecordid>eNrjZNAJCPJ3dg0OVnDzD1II8XBVcPb3Cw4JCnUO8fT3U_B3U3AJcvT0UwiODA5x9eVhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHuTkaGFuaWRsZOxoRVAAAXgCR7</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><source>esp@cenet</source><creator>LASZLO VARKONYI ; CSABA ASSZONYI ; GYULA VACI</creator><creatorcontrib>LASZLO VARKONYI ; CSABA ASSZONYI ; GYULA VACI</creatorcontrib><description>A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).</description><language>eng</language><subject>FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>1990</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19900718&amp;DB=EPODOC&amp;CC=GB&amp;NR=2187923B$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19900718&amp;DB=EPODOC&amp;CC=GB&amp;NR=2187923B$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LASZLO VARKONYI</creatorcontrib><creatorcontrib>CSABA ASSZONYI</creatorcontrib><creatorcontrib>GYULA VACI</creatorcontrib><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><description>A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).</description><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1990</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAJCPJ3dg0OVnDzD1II8XBVcPb3Cw4JCnUO8fT3U_B3U3AJcvT0UwiODA5x9eVhYE1LzClO5YXS3Azybq4hzh66qQX58anFBYnJqXmpJfHuTkaGFuaWRsZOxoRVAAAXgCR7</recordid><startdate>19900718</startdate><enddate>19900718</enddate><creator>LASZLO VARKONYI</creator><creator>CSABA ASSZONYI</creator><creator>GYULA VACI</creator><scope>EVB</scope></search><sort><creationdate>19900718</creationdate><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><author>LASZLO VARKONYI ; CSABA ASSZONYI ; GYULA VACI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_GB2187923B3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1990</creationdate><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>LASZLO VARKONYI</creatorcontrib><creatorcontrib>CSABA ASSZONYI</creatorcontrib><creatorcontrib>GYULA VACI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LASZLO VARKONYI</au><au>CSABA ASSZONYI</au><au>GYULA VACI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM</title><date>1990-07-18</date><risdate>1990</risdate><abstract>A process for the construction of a drain system, wherein a catchment body and at least one interconnected suction body are laid into the soil to be dewatered. Starting from a working pit (3) or bank, a nearly horizontal hole (9) is drilled for the catchment body (B), furthermore a hole (8) or shaft (18) preferably reaching the vicinity of an impermeable clay layer (2) is made from the ground surface for the suction body (A) transversely to and in communication with the hole (9) of the catchment body (B).</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_GB2187923B
source esp@cenet
subjects FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
title PROCESS FOR THE CONSTRUCTION OF DRAIN SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T09%3A36%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LASZLO%20VARKONYI&rft.date=1990-07-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EGB2187923B%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true