METHOD AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

The invention relates to a method for transporting goods in a building (1) under construction, comprising providing an elevator arrangement (2;20) comprising a hoistway (H) inside the building (1) under construction, and vertically displaced landings (F0,Fn), and an elevator car (3), which is vertic...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Haapaniemi, Markku, Haikonen, Aki, Räsänen, Matti
Format: Patent
Sprache:eng ; fre ; ger
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Haapaniemi, Markku
Haikonen, Aki
Räsänen, Matti
description The invention relates to a method for transporting goods in a building (1) under construction, comprising providing an elevator arrangement (2;20) comprising a hoistway (H) inside the building (1) under construction, and vertically displaced landings (F0,Fn), and an elevator car (3), which is vertically movable inside the hoistway (H), the hoistway being provided with openings (4) between landings (F0,Fn) and the hoistway (H), one or more of the hoistway openings (4) being provided with a first door arrangement (5;25), wherein the first door arrangement (5;25) comprises a first sliding hoistway door (6;26) for openably closing the hoistway opening (4), the opening direction of which first hoistway door (6;26) is vertical; and thereafter transporting vertically goods between landings (F0,Fn) of the building (1) under construction with said elevator car (3); and thereafter constructing a second door arrangement (8) in place of one or more of the first door arrangements (5;25), wherein the second door arrangement (8) comprises a second sliding hoistway door (9) for openably closing the hoistway opening (4), the opening direction of which second sliding hoistway door (9) is horizontal; and thereafter transporting vertically passengers between landings (F0,Fn) of the building (1) with an elevator car (15) in the hoistway inside the building (1). The invention also relates to a construction-time elevator arrangement (2,20).
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_EP3822215B1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>EP3822215B1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_EP3822215B13</originalsourceid><addsrcrecordid>eNrjZDD0dQ3x8HdRcPRzUXD29wsOCQp1DvH099MN8fR1VXD1cQ1zDPEPUnAMCnL0c3f1dfUL4WFgTUvMKU7lhdLcDApuriHOHrqpBfnxqcUFicmpeakl8a4BxhZGRkaGpk6GxkQoAQAhliZh</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT</title><source>esp@cenet</source><creator>Haapaniemi, Markku ; Haikonen, Aki ; Räsänen, Matti</creator><creatorcontrib>Haapaniemi, Markku ; Haikonen, Aki ; Räsänen, Matti</creatorcontrib><description>The invention relates to a method for transporting goods in a building (1) under construction, comprising providing an elevator arrangement (2;20) comprising a hoistway (H) inside the building (1) under construction, and vertically displaced landings (F0,Fn), and an elevator car (3), which is vertically movable inside the hoistway (H), the hoistway being provided with openings (4) between landings (F0,Fn) and the hoistway (H), one or more of the hoistway openings (4) being provided with a first door arrangement (5;25), wherein the first door arrangement (5;25) comprises a first sliding hoistway door (6;26) for openably closing the hoistway opening (4), the opening direction of which first hoistway door (6;26) is vertical; and thereafter transporting vertically goods between landings (F0,Fn) of the building (1) under construction with said elevator car (3); and thereafter constructing a second door arrangement (8) in place of one or more of the first door arrangements (5;25), wherein the second door arrangement (8) comprises a second sliding hoistway door (9) for openably closing the hoistway opening (4), the opening direction of which second sliding hoistway door (9) is horizontal; and thereafter transporting vertically passengers between landings (F0,Fn) of the building (1) with an elevator car (15) in the hoistway inside the building (1). The invention also relates to a construction-time elevator arrangement (2,20).</description><language>eng ; fre ; ger</language><subject>ELEVATORS ; ESCALATORS OR MOVING WALKWAYS ; HAULING ; HOISTING ; LIFTING ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240717&amp;DB=EPODOC&amp;CC=EP&amp;NR=3822215B1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240717&amp;DB=EPODOC&amp;CC=EP&amp;NR=3822215B1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Haapaniemi, Markku</creatorcontrib><creatorcontrib>Haikonen, Aki</creatorcontrib><creatorcontrib>Räsänen, Matti</creatorcontrib><title>METHOD AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT</title><description>The invention relates to a method for transporting goods in a building (1) under construction, comprising providing an elevator arrangement (2;20) comprising a hoistway (H) inside the building (1) under construction, and vertically displaced landings (F0,Fn), and an elevator car (3), which is vertically movable inside the hoistway (H), the hoistway being provided with openings (4) between landings (F0,Fn) and the hoistway (H), one or more of the hoistway openings (4) being provided with a first door arrangement (5;25), wherein the first door arrangement (5;25) comprises a first sliding hoistway door (6;26) for openably closing the hoistway opening (4), the opening direction of which first hoistway door (6;26) is vertical; and thereafter transporting vertically goods between landings (F0,Fn) of the building (1) under construction with said elevator car (3); and thereafter constructing a second door arrangement (8) in place of one or more of the first door arrangements (5;25), wherein the second door arrangement (8) comprises a second sliding hoistway door (9) for openably closing the hoistway opening (4), the opening direction of which second sliding hoistway door (9) is horizontal; and thereafter transporting vertically passengers between landings (F0,Fn) of the building (1) with an elevator car (15) in the hoistway inside the building (1). The invention also relates to a construction-time elevator arrangement (2,20).</description><subject>ELEVATORS</subject><subject>ESCALATORS OR MOVING WALKWAYS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD0dQ3x8HdRcPRzUXD29wsOCQp1DvH099MN8fR1VXD1cQ1zDPEPUnAMCnL0c3f1dfUL4WFgTUvMKU7lhdLcDApuriHOHrqpBfnxqcUFicmpeakl8a4BxhZGRkaGpk6GxkQoAQAhliZh</recordid><startdate>20240717</startdate><enddate>20240717</enddate><creator>Haapaniemi, Markku</creator><creator>Haikonen, Aki</creator><creator>Räsänen, Matti</creator><scope>EVB</scope></search><sort><creationdate>20240717</creationdate><title>METHOD AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT</title><author>Haapaniemi, Markku ; Haikonen, Aki ; Räsänen, Matti</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_EP3822215B13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; fre ; ger</language><creationdate>2024</creationdate><topic>ELEVATORS</topic><topic>ESCALATORS OR MOVING WALKWAYS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>Haapaniemi, Markku</creatorcontrib><creatorcontrib>Haikonen, Aki</creatorcontrib><creatorcontrib>Räsänen, Matti</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Haapaniemi, Markku</au><au>Haikonen, Aki</au><au>Räsänen, Matti</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT</title><date>2024-07-17</date><risdate>2024</risdate><abstract>The invention relates to a method for transporting goods in a building (1) under construction, comprising providing an elevator arrangement (2;20) comprising a hoistway (H) inside the building (1) under construction, and vertically displaced landings (F0,Fn), and an elevator car (3), which is vertically movable inside the hoistway (H), the hoistway being provided with openings (4) between landings (F0,Fn) and the hoistway (H), one or more of the hoistway openings (4) being provided with a first door arrangement (5;25), wherein the first door arrangement (5;25) comprises a first sliding hoistway door (6;26) for openably closing the hoistway opening (4), the opening direction of which first hoistway door (6;26) is vertical; and thereafter transporting vertically goods between landings (F0,Fn) of the building (1) under construction with said elevator car (3); and thereafter constructing a second door arrangement (8) in place of one or more of the first door arrangements (5;25), wherein the second door arrangement (8) comprises a second sliding hoistway door (9) for openably closing the hoistway opening (4), the opening direction of which second sliding hoistway door (9) is horizontal; and thereafter transporting vertically passengers between landings (F0,Fn) of the building (1) with an elevator car (15) in the hoistway inside the building (1). The invention also relates to a construction-time elevator arrangement (2,20).</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; fre ; ger
recordid cdi_epo_espacenet_EP3822215B1
source esp@cenet
subjects ELEVATORS
ESCALATORS OR MOVING WALKWAYS
HAULING
HOISTING
LIFTING
PERFORMING OPERATIONS
TRANSPORTING
title METHOD AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T15%3A28%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Haapaniemi,%20Markku&rft.date=2024-07-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EEP3822215B1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true