SYSTEM OG FREMGANGSMÅDE TIL INITIALISERING AF OPSTART AF EN VINDMØLLE
A method for initializing startup of a wind turbine (10) includes measuring, via one or more sensors (204, 206, 208), a first wind condition at the wind turbine (10) at a first moment in time. The method also includes measuring, via the one or more sensors (204, 206, 208), a second wind condition at...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | dan |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Gandhi, Jignesh Govindlal Purcell Murray, Megan Ahmad, Hammad |
description | A method for initializing startup of a wind turbine (10) includes measuring, via one or more sensors (204, 206, 208), a first wind condition at the wind turbine (10) at a first moment in time. The method also includes measuring, via the one or more sensors (204, 206, 208), a second wind condition at the wind turbine (10) at a subsequent, second moment in time. Further, the method includes estimating, via the processor(s) (154), an acceleration parameter of the wind turbine (10) as a function of the first wind condition and the second wind condition. Moreover, the method includes comparing, via the processor(s) (154), the acceleration parameter to a predetermined threshold. As such, the method includes initializing, via the processor(s) (154), a first startup process for the wind turbine when the acceleration parameter is at or below a predetermined threshold. Further, the method includes initializing, via the processor(s) (154), a second startup process for the wind turbine (10) when the acceleration parameter exceeds a predetermined threshold, the second startup process being faster than the first startup process. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_DK3628860TT3</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>DK3628860TT3</sourcerecordid><originalsourceid>FETCH-epo_espacenet_DK3628860TT33</originalsourceid><addsrcrecordid>eNrjZHAPjgwOcfVV8HdXcAty9XV39HMP9j3c6uKqEOLpo-Dp5xni6ejjGewa5OnnruDopuAfEBziGBQCYrr6KYR5-rn4Hp7h4-PKw8CalphTnMoLpbkZFN1cQ5w9dFML8uNTiwsSk1PzUkviXbyNzYwsLMwMQkKMjYlRAwCSKS57</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SYSTEM OG FREMGANGSMÅDE TIL INITIALISERING AF OPSTART AF EN VINDMØLLE</title><source>esp@cenet</source><creator>Gandhi, Jignesh Govindlal ; Purcell Murray, Megan ; Ahmad, Hammad</creator><creatorcontrib>Gandhi, Jignesh Govindlal ; Purcell Murray, Megan ; Ahmad, Hammad</creatorcontrib><description>A method for initializing startup of a wind turbine (10) includes measuring, via one or more sensors (204, 206, 208), a first wind condition at the wind turbine (10) at a first moment in time. The method also includes measuring, via the one or more sensors (204, 206, 208), a second wind condition at the wind turbine (10) at a subsequent, second moment in time. Further, the method includes estimating, via the processor(s) (154), an acceleration parameter of the wind turbine (10) as a function of the first wind condition and the second wind condition. Moreover, the method includes comparing, via the processor(s) (154), the acceleration parameter to a predetermined threshold. As such, the method includes initializing, via the processor(s) (154), a first startup process for the wind turbine when the acceleration parameter is at or below a predetermined threshold. Further, the method includes initializing, via the processor(s) (154), a second startup process for the wind turbine (10) when the acceleration parameter exceeds a predetermined threshold, the second startup process being faster than the first startup process.</description><language>dan</language><subject>BLASTING ; HEATING ; LIGHTING ; MACHINES OR ENGINES FOR LIQUIDS ; MECHANICAL ENGINEERING ; OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR ; PRODUCING MECHANICAL POWER ; WEAPONS ; WIND MOTORS ; WIND, SPRING WEIGHT AND MISCELLANEOUS MOTORS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220131&DB=EPODOC&CC=DK&NR=3628860T3$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220131&DB=EPODOC&CC=DK&NR=3628860T3$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Gandhi, Jignesh Govindlal</creatorcontrib><creatorcontrib>Purcell Murray, Megan</creatorcontrib><creatorcontrib>Ahmad, Hammad</creatorcontrib><title>SYSTEM OG FREMGANGSMÅDE TIL INITIALISERING AF OPSTART AF EN VINDMØLLE</title><description>A method for initializing startup of a wind turbine (10) includes measuring, via one or more sensors (204, 206, 208), a first wind condition at the wind turbine (10) at a first moment in time. The method also includes measuring, via the one or more sensors (204, 206, 208), a second wind condition at the wind turbine (10) at a subsequent, second moment in time. Further, the method includes estimating, via the processor(s) (154), an acceleration parameter of the wind turbine (10) as a function of the first wind condition and the second wind condition. Moreover, the method includes comparing, via the processor(s) (154), the acceleration parameter to a predetermined threshold. As such, the method includes initializing, via the processor(s) (154), a first startup process for the wind turbine when the acceleration parameter is at or below a predetermined threshold. Further, the method includes initializing, via the processor(s) (154), a second startup process for the wind turbine (10) when the acceleration parameter exceeds a predetermined threshold, the second startup process being faster than the first startup process.</description><subject>BLASTING</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MACHINES OR ENGINES FOR LIQUIDS</subject><subject>MECHANICAL ENGINEERING</subject><subject>OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR</subject><subject>PRODUCING MECHANICAL POWER</subject><subject>WEAPONS</subject><subject>WIND MOTORS</subject><subject>WIND, SPRING WEIGHT AND MISCELLANEOUS MOTORS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAPjgwOcfVV8HdXcAty9XV39HMP9j3c6uKqEOLpo-Dp5xni6ejjGewa5OnnruDopuAfEBziGBQCYrr6KYR5-rn4Hp7h4-PKw8CalphTnMoLpbkZFN1cQ5w9dFML8uNTiwsSk1PzUkviXbyNzYwsLMwMQkKMjYlRAwCSKS57</recordid><startdate>20220131</startdate><enddate>20220131</enddate><creator>Gandhi, Jignesh Govindlal</creator><creator>Purcell Murray, Megan</creator><creator>Ahmad, Hammad</creator><scope>EVB</scope></search><sort><creationdate>20220131</creationdate><title>SYSTEM OG FREMGANGSMÅDE TIL INITIALISERING AF OPSTART AF EN VINDMØLLE</title><author>Gandhi, Jignesh Govindlal ; Purcell Murray, Megan ; Ahmad, Hammad</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_DK3628860TT33</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>dan</language><creationdate>2022</creationdate><topic>BLASTING</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MACHINES OR ENGINES FOR LIQUIDS</topic><topic>MECHANICAL ENGINEERING</topic><topic>OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR</topic><topic>PRODUCING MECHANICAL POWER</topic><topic>WEAPONS</topic><topic>WIND MOTORS</topic><topic>WIND, SPRING WEIGHT AND MISCELLANEOUS MOTORS</topic><toplevel>online_resources</toplevel><creatorcontrib>Gandhi, Jignesh Govindlal</creatorcontrib><creatorcontrib>Purcell Murray, Megan</creatorcontrib><creatorcontrib>Ahmad, Hammad</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Gandhi, Jignesh Govindlal</au><au>Purcell Murray, Megan</au><au>Ahmad, Hammad</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SYSTEM OG FREMGANGSMÅDE TIL INITIALISERING AF OPSTART AF EN VINDMØLLE</title><date>2022-01-31</date><risdate>2022</risdate><abstract>A method for initializing startup of a wind turbine (10) includes measuring, via one or more sensors (204, 206, 208), a first wind condition at the wind turbine (10) at a first moment in time. The method also includes measuring, via the one or more sensors (204, 206, 208), a second wind condition at the wind turbine (10) at a subsequent, second moment in time. Further, the method includes estimating, via the processor(s) (154), an acceleration parameter of the wind turbine (10) as a function of the first wind condition and the second wind condition. Moreover, the method includes comparing, via the processor(s) (154), the acceleration parameter to a predetermined threshold. As such, the method includes initializing, via the processor(s) (154), a first startup process for the wind turbine when the acceleration parameter is at or below a predetermined threshold. Further, the method includes initializing, via the processor(s) (154), a second startup process for the wind turbine (10) when the acceleration parameter exceeds a predetermined threshold, the second startup process being faster than the first startup process.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | dan |
recordid | cdi_epo_espacenet_DK3628860TT3 |
source | esp@cenet |
subjects | BLASTING HEATING LIGHTING MACHINES OR ENGINES FOR LIQUIDS MECHANICAL ENGINEERING OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR PRODUCING MECHANICAL POWER WEAPONS WIND MOTORS WIND, SPRING WEIGHT AND MISCELLANEOUS MOTORS |
title | SYSTEM OG FREMGANGSMÅDE TIL INITIALISERING AF OPSTART AF EN VINDMØLLE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T11%3A06%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Gandhi,%20Jignesh%20Govindlal&rft.date=2022-01-31&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EDK3628860TT3%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |