Fremgangsmåde og indretning til opbygning af en fast jernbane

The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and ex...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: GEISSLER, FRANZ, MOHR, WINFRIED, PIETSCHMANN, DIETER, DE PONTBRIAND, GILLES, BOUTIN, PIERRE-OLIVIER, BACHMANN, HANS
Format: Patent
Sprache:dan
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator GEISSLER, FRANZ
MOHR, WINFRIED
PIETSCHMANN, DIETER
DE PONTBRIAND, GILLES
BOUTIN, PIERRE-OLIVIER
BACHMANN, HANS
description The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_DK0731215TT3</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>DK0731215TT3</sourcerecordid><originalsourceid>FETCH-epo_espacenet_DK0731215TT33</originalsourceid><addsrcrecordid>eNrjZLBzK0rNTU_MSy_OPbw0JVUhP10hMy-lKLUkLzMvXaEkM0chvyCpMh3MS0xTSM1TSEssLlHISi3KS0rMS-VhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfEu3gbmxoZGhqYhIcbGxKgBAK7TMV4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Fremgangsmåde og indretning til opbygning af en fast jernbane</title><source>esp@cenet</source><creator>GEISSLER, FRANZ ; MOHR, WINFRIED ; PIETSCHMANN, DIETER ; DE PONTBRIAND, GILLES ; BOUTIN, PIERRE-OLIVIER ; BACHMANN, HANS</creator><creatorcontrib>GEISSLER, FRANZ ; MOHR, WINFRIED ; PIETSCHMANN, DIETER ; DE PONTBRIAND, GILLES ; BOUTIN, PIERRE-OLIVIER ; BACHMANN, HANS</creatorcontrib><description>The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.</description><edition>6</edition><language>dan</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; PERMANENT WAY ; PERMANENT-WAY TOOLS</subject><creationdate>2000</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20000911&amp;DB=EPODOC&amp;CC=DK&amp;NR=0731215T3$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20000911&amp;DB=EPODOC&amp;CC=DK&amp;NR=0731215T3$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>GEISSLER, FRANZ</creatorcontrib><creatorcontrib>MOHR, WINFRIED</creatorcontrib><creatorcontrib>PIETSCHMANN, DIETER</creatorcontrib><creatorcontrib>DE PONTBRIAND, GILLES</creatorcontrib><creatorcontrib>BOUTIN, PIERRE-OLIVIER</creatorcontrib><creatorcontrib>BACHMANN, HANS</creatorcontrib><title>Fremgangsmåde og indretning til opbygning af en fast jernbane</title><description>The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2000</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBzK0rNTU_MSy_OPbw0JVUhP10hMy-lKLUkLzMvXaEkM0chvyCpMh3MS0xTSM1TSEssLlHISi3KS0rMS-VhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfEu3gbmxoZGhqYhIcbGxKgBAK7TMV4</recordid><startdate>20000911</startdate><enddate>20000911</enddate><creator>GEISSLER, FRANZ</creator><creator>MOHR, WINFRIED</creator><creator>PIETSCHMANN, DIETER</creator><creator>DE PONTBRIAND, GILLES</creator><creator>BOUTIN, PIERRE-OLIVIER</creator><creator>BACHMANN, HANS</creator><scope>EVB</scope></search><sort><creationdate>20000911</creationdate><title>Fremgangsmåde og indretning til opbygning af en fast jernbane</title><author>GEISSLER, FRANZ ; MOHR, WINFRIED ; PIETSCHMANN, DIETER ; DE PONTBRIAND, GILLES ; BOUTIN, PIERRE-OLIVIER ; BACHMANN, HANS</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_DK0731215TT33</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>dan</language><creationdate>2000</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><toplevel>online_resources</toplevel><creatorcontrib>GEISSLER, FRANZ</creatorcontrib><creatorcontrib>MOHR, WINFRIED</creatorcontrib><creatorcontrib>PIETSCHMANN, DIETER</creatorcontrib><creatorcontrib>DE PONTBRIAND, GILLES</creatorcontrib><creatorcontrib>BOUTIN, PIERRE-OLIVIER</creatorcontrib><creatorcontrib>BACHMANN, HANS</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>GEISSLER, FRANZ</au><au>MOHR, WINFRIED</au><au>PIETSCHMANN, DIETER</au><au>DE PONTBRIAND, GILLES</au><au>BOUTIN, PIERRE-OLIVIER</au><au>BACHMANN, HANS</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Fremgangsmåde og indretning til opbygning af en fast jernbane</title><date>2000-09-11</date><risdate>2000</risdate><abstract>The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language dan
recordid cdi_epo_espacenet_DK0731215TT3
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
MACHINES FOR MAKING RAILWAYS OF ALL KINDS
PERMANENT WAY
PERMANENT-WAY TOOLS
title Fremgangsmåde og indretning til opbygning af en fast jernbane
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T14%3A34%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=GEISSLER,%20FRANZ&rft.date=2000-09-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EDK0731215TT3%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true