Prüfvorrichtung und Verfahren zur Prüfung von elektrischen Steckverbinder

A connector terminal checking device includes a base, a conduction checking part rotatably supported by the base to check the conductive condition of a connector to be checked, an abutting part attached to the base to come into contact with a rear end of the connector mounted on the conduction check...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: AIKAWA, JIRO, SHIZUOKA, JP
Format: Patent
Sprache:ger
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator AIKAWA, JIRO, SHIZUOKA, JP
description A connector terminal checking device includes a base, a conduction checking part rotatably supported by the base to check the conductive condition of a connector to be checked, an abutting part attached to the base to come into contact with a rear end of the connector mounted on the conduction checking part arranged in a conduction check position, a compression spring for urging the conduction checking part against a stand-by position and a solenoid for holding the conduction checking part in the conduction check position when checking the connector. In an initial state of the device, the solenoid is not energized, so that the conduction checking part is moved in the stand-by position by the compression spring. After the connector is inserted into the conduction checking part, it is pressed to the conduction check position by an operator. During checking, the solenoid is energized to maintain the conduction checking part in the conduction checking position. After checking, the solenoid is inactivated, so that the conduction checking part is raised from the base by the compression spring.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_DE4429442C2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>DE4429442C2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_DE4429442C23</originalsourceid><addsrcrecordid>eNrjZPAOKDq8J60sv6goMzmjpDQvXaE0L0UhLLUoLTGjKDVPoaq0SAGsBCRVlp-nkJqTml1SlFmcnAGUDS5JTc4uSy1KysxLSS3iYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxLq4mJkaWQOxsZEyEEgArsjdN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Prüfvorrichtung und Verfahren zur Prüfung von elektrischen Steckverbinder</title><source>esp@cenet</source><creator>AIKAWA, JIRO, SHIZUOKA, JP</creator><creatorcontrib>AIKAWA, JIRO, SHIZUOKA, JP</creatorcontrib><description>A connector terminal checking device includes a base, a conduction checking part rotatably supported by the base to check the conductive condition of a connector to be checked, an abutting part attached to the base to come into contact with a rear end of the connector mounted on the conduction checking part arranged in a conduction check position, a compression spring for urging the conduction checking part against a stand-by position and a solenoid for holding the conduction checking part in the conduction check position when checking the connector. In an initial state of the device, the solenoid is not energized, so that the conduction checking part is moved in the stand-by position by the compression spring. After the connector is inserted into the conduction checking part, it is pressed to the conduction check position by an operator. During checking, the solenoid is energized to maintain the conduction checking part in the conduction checking position. After checking, the solenoid is inactivated, so that the conduction checking part is raised from the base by the compression spring.</description><edition>6</edition><language>ger</language><subject>BASIC ELECTRIC ELEMENTS ; CURRENT COLLECTORS ; ELECTRICITY ; LINE CONNECTORS ; MEASURING ; MEASURING ELECTRIC VARIABLES ; MEASURING MAGNETIC VARIABLES ; PHYSICS ; TESTING</subject><creationdate>1997</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970123&amp;DB=EPODOC&amp;CC=DE&amp;NR=4429442C2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970123&amp;DB=EPODOC&amp;CC=DE&amp;NR=4429442C2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>AIKAWA, JIRO, SHIZUOKA, JP</creatorcontrib><title>Prüfvorrichtung und Verfahren zur Prüfung von elektrischen Steckverbinder</title><description>A connector terminal checking device includes a base, a conduction checking part rotatably supported by the base to check the conductive condition of a connector to be checked, an abutting part attached to the base to come into contact with a rear end of the connector mounted on the conduction checking part arranged in a conduction check position, a compression spring for urging the conduction checking part against a stand-by position and a solenoid for holding the conduction checking part in the conduction check position when checking the connector. In an initial state of the device, the solenoid is not energized, so that the conduction checking part is moved in the stand-by position by the compression spring. After the connector is inserted into the conduction checking part, it is pressed to the conduction check position by an operator. During checking, the solenoid is energized to maintain the conduction checking part in the conduction checking position. After checking, the solenoid is inactivated, so that the conduction checking part is raised from the base by the compression spring.</description><subject>BASIC ELECTRIC ELEMENTS</subject><subject>CURRENT COLLECTORS</subject><subject>ELECTRICITY</subject><subject>LINE CONNECTORS</subject><subject>MEASURING</subject><subject>MEASURING ELECTRIC VARIABLES</subject><subject>MEASURING MAGNETIC VARIABLES</subject><subject>PHYSICS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1997</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZPAOKDq8J60sv6goMzmjpDQvXaE0L0UhLLUoLTGjKDVPoaq0SAGsBCRVlp-nkJqTml1SlFmcnAGUDS5JTc4uSy1KysxLSS3iYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxLq4mJkaWQOxsZEyEEgArsjdN</recordid><startdate>19970123</startdate><enddate>19970123</enddate><creator>AIKAWA, JIRO, SHIZUOKA, JP</creator><scope>EVB</scope></search><sort><creationdate>19970123</creationdate><title>Prüfvorrichtung und Verfahren zur Prüfung von elektrischen Steckverbinder</title><author>AIKAWA, JIRO, SHIZUOKA, JP</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_DE4429442C23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>ger</language><creationdate>1997</creationdate><topic>BASIC ELECTRIC ELEMENTS</topic><topic>CURRENT COLLECTORS</topic><topic>ELECTRICITY</topic><topic>LINE CONNECTORS</topic><topic>MEASURING</topic><topic>MEASURING ELECTRIC VARIABLES</topic><topic>MEASURING MAGNETIC VARIABLES</topic><topic>PHYSICS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>AIKAWA, JIRO, SHIZUOKA, JP</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>AIKAWA, JIRO, SHIZUOKA, JP</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Prüfvorrichtung und Verfahren zur Prüfung von elektrischen Steckverbinder</title><date>1997-01-23</date><risdate>1997</risdate><abstract>A connector terminal checking device includes a base, a conduction checking part rotatably supported by the base to check the conductive condition of a connector to be checked, an abutting part attached to the base to come into contact with a rear end of the connector mounted on the conduction checking part arranged in a conduction check position, a compression spring for urging the conduction checking part against a stand-by position and a solenoid for holding the conduction checking part in the conduction check position when checking the connector. In an initial state of the device, the solenoid is not energized, so that the conduction checking part is moved in the stand-by position by the compression spring. After the connector is inserted into the conduction checking part, it is pressed to the conduction check position by an operator. During checking, the solenoid is energized to maintain the conduction checking part in the conduction checking position. After checking, the solenoid is inactivated, so that the conduction checking part is raised from the base by the compression spring.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language ger
recordid cdi_epo_espacenet_DE4429442C2
source esp@cenet
subjects BASIC ELECTRIC ELEMENTS
CURRENT COLLECTORS
ELECTRICITY
LINE CONNECTORS
MEASURING
MEASURING ELECTRIC VARIABLES
MEASURING MAGNETIC VARIABLES
PHYSICS
TESTING
title Prüfvorrichtung und Verfahren zur Prüfung von elektrischen Steckverbinder
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-09T02%3A53%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=AIKAWA,%20JIRO,%20SHIZUOKA,%20JP&rft.date=1997-01-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EDE4429442C2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true