Verfahren und Vorrichtung zum Aufbau einer festen Schienenfahrbahn
The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and ex...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | ger |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | BACHMANN, HANS, 92318 NEUMARKT, DE GEISLER, FRANZ, 92355 VELBURG, DE MOHR, WINFRIED, 92318 NEUMARKT, DE PIETSCHMANN, DIETER, 06618 NAUMBURG, DE PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR |
description | The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_DE19508107C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>DE19508107C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_DE19508107C13</originalsourceid><addsrcrecordid>eNrjZHAKSy1KS8woSs1TKM1LUQjLLyrKTM4oKc1LV6gqzVVwLE1LSixVSM3MSy1SSEstLgGqC07OyEzNS80DaUtKzMjjYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyUDVJfEuroaWpgYWhgbmzobGxKgBAFIkMi8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Verfahren und Vorrichtung zum Aufbau einer festen Schienenfahrbahn</title><source>esp@cenet</source><creator>BACHMANN, HANS, 92318 NEUMARKT, DE ; GEISLER, FRANZ, 92355 VELBURG, DE ; MOHR, WINFRIED, 92318 NEUMARKT, DE ; PIETSCHMANN, DIETER, 06618 NAUMBURG, DE ; PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR ; BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</creator><creatorcontrib>BACHMANN, HANS, 92318 NEUMARKT, DE ; GEISLER, FRANZ, 92355 VELBURG, DE ; MOHR, WINFRIED, 92318 NEUMARKT, DE ; PIETSCHMANN, DIETER, 06618 NAUMBURG, DE ; PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR ; BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</creatorcontrib><description>The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.</description><edition>6</edition><language>ger</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; PERMANENT WAY ; PERMANENT-WAY TOOLS</subject><creationdate>1996</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19961114&DB=EPODOC&CC=DE&NR=19508107C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19961114&DB=EPODOC&CC=DE&NR=19508107C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BACHMANN, HANS, 92318 NEUMARKT, DE</creatorcontrib><creatorcontrib>GEISLER, FRANZ, 92355 VELBURG, DE</creatorcontrib><creatorcontrib>MOHR, WINFRIED, 92318 NEUMARKT, DE</creatorcontrib><creatorcontrib>PIETSCHMANN, DIETER, 06618 NAUMBURG, DE</creatorcontrib><creatorcontrib>PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR</creatorcontrib><creatorcontrib>BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</creatorcontrib><title>Verfahren und Vorrichtung zum Aufbau einer festen Schienenfahrbahn</title><description>The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1996</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAKSy1KS8woSs1TKM1LUQjLLyrKTM4oKc1LV6gqzVVwLE1LSixVSM3MSy1SSEstLgGqC07OyEzNS80DaUtKzMjjYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyUDVJfEuroaWpgYWhgbmzobGxKgBAFIkMi8</recordid><startdate>19961114</startdate><enddate>19961114</enddate><creator>BACHMANN, HANS, 92318 NEUMARKT, DE</creator><creator>GEISLER, FRANZ, 92355 VELBURG, DE</creator><creator>MOHR, WINFRIED, 92318 NEUMARKT, DE</creator><creator>PIETSCHMANN, DIETER, 06618 NAUMBURG, DE</creator><creator>PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR</creator><creator>BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</creator><scope>EVB</scope></search><sort><creationdate>19961114</creationdate><title>Verfahren und Vorrichtung zum Aufbau einer festen Schienenfahrbahn</title><author>BACHMANN, HANS, 92318 NEUMARKT, DE ; GEISLER, FRANZ, 92355 VELBURG, DE ; MOHR, WINFRIED, 92318 NEUMARKT, DE ; PIETSCHMANN, DIETER, 06618 NAUMBURG, DE ; PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR ; BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_DE19508107C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>ger</language><creationdate>1996</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><toplevel>online_resources</toplevel><creatorcontrib>BACHMANN, HANS, 92318 NEUMARKT, DE</creatorcontrib><creatorcontrib>GEISLER, FRANZ, 92355 VELBURG, DE</creatorcontrib><creatorcontrib>MOHR, WINFRIED, 92318 NEUMARKT, DE</creatorcontrib><creatorcontrib>PIETSCHMANN, DIETER, 06618 NAUMBURG, DE</creatorcontrib><creatorcontrib>PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR</creatorcontrib><creatorcontrib>BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BACHMANN, HANS, 92318 NEUMARKT, DE</au><au>GEISLER, FRANZ, 92355 VELBURG, DE</au><au>MOHR, WINFRIED, 92318 NEUMARKT, DE</au><au>PIETSCHMANN, DIETER, 06618 NAUMBURG, DE</au><au>PONTBRIAND, GILLES DE, MANTES LA JOLIE, FR</au><au>BOUTIN, PIERRE-OLIVIER, LOUVECIENNES, FR</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Verfahren und Vorrichtung zum Aufbau einer festen Schienenfahrbahn</title><date>1996-11-14</date><risdate>1996</risdate><abstract>The construction method uses concrete block (16) and steel (18) sleepers, with two reinforced individual blocks. The reinforcements extend mainly parallel to the sleeper axis. They consist of structural steel bars, connected by clips to form a reinforcing cage. The bars act as connection bars and extend through both blocks, with at least some projecting over the outer block ends. The longitudinal reinforcements, which had previously been placed loosely in the concrete pan, are lifted, and connected to the connection bars and the projecting bar ends. The preassembled tracks modules are adjusted using a number of regulating gantries, located on the concrete pans.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | ger |
recordid | cdi_epo_espacenet_DE19508107C1 |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS MACHINES FOR MAKING RAILWAYS OF ALL KINDS PERMANENT WAY PERMANENT-WAY TOOLS |
title | Verfahren und Vorrichtung zum Aufbau einer festen Schienenfahrbahn |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-22T22%3A43%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BACHMANN,%20HANS,%2092318%20NEUMARKT,%20DE&rft.date=1996-11-14&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EDE19508107C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |