Existing station top plate concrete supporting stress system

The utility model relates to an existing station top plate concrete supporting stress system. When a main body structure and an accessory structure are constructed through an existing open excavation method, the accessory structure and the main body structure need to be poured and constructed by sta...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG WEI, AN BINGZHONG, SHEN XIN, ZHAO FENG, YU JING, ZU XILONG, ZHANG QIANG, JIANG QINGGUO, XIONG RANRAN, YU ZHONG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WANG WEI
AN BINGZHONG
SHEN XIN
ZHAO FENG
YU JING
ZU XILONG
ZHANG QIANG
JIANG QINGGUO
XIONG RANRAN
YU ZHONG
description The utility model relates to an existing station top plate concrete supporting stress system. When a main body structure and an accessory structure are constructed through an existing open excavation method, the accessory structure and the main body structure need to be poured and constructed by stages. The system comprises a station top plate of a main body structure, an auxiliary concrete support above an auxiliary structure and a bracket, the bottom of the bracket is fixedly connected to the top surface of the station top plate; one end of the auxiliary concrete support is fixedly connected to the inner side of the crown beam on the outer side of the auxiliary structure, and the other end of the auxiliary concrete support is fixedly connected to the side face of the bracket. The design problem that staged pouring is needed in the accessory structure construction process is solved, the existing station top plate and the side wall are matched with the accessory concrete support and the bracket to form a stre
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN221345671UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN221345671UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN221345671UU3</originalsourceid><addsrcrecordid>eNrjZLBxrcgsLsnMS1coLkksyczPUyjJL1AoyEksSVVIzs9LLkoFMopLCwryi6CqilKLixWKK4tLUnN5GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RkaGxiamZuWFoqDFRigCzQjGC</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Existing station top plate concrete supporting stress system</title><source>esp@cenet</source><creator>WANG WEI ; AN BINGZHONG ; SHEN XIN ; ZHAO FENG ; YU JING ; ZU XILONG ; ZHANG QIANG ; JIANG QINGGUO ; XIONG RANRAN ; YU ZHONG</creator><creatorcontrib>WANG WEI ; AN BINGZHONG ; SHEN XIN ; ZHAO FENG ; YU JING ; ZU XILONG ; ZHANG QIANG ; JIANG QINGGUO ; XIONG RANRAN ; YU ZHONG</creatorcontrib><description>The utility model relates to an existing station top plate concrete supporting stress system. When a main body structure and an accessory structure are constructed through an existing open excavation method, the accessory structure and the main body structure need to be poured and constructed by stages. The system comprises a station top plate of a main body structure, an auxiliary concrete support above an auxiliary structure and a bracket, the bottom of the bracket is fixedly connected to the top surface of the station top plate; one end of the auxiliary concrete support is fixedly connected to the inner side of the crown beam on the outer side of the auxiliary structure, and the other end of the auxiliary concrete support is fixedly connected to the side face of the bracket. The design problem that staged pouring is needed in the accessory structure construction process is solved, the existing station top plate and the side wall are matched with the accessory concrete support and the bracket to form a stre</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240716&amp;DB=EPODOC&amp;CC=CN&amp;NR=221345671U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240716&amp;DB=EPODOC&amp;CC=CN&amp;NR=221345671U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>AN BINGZHONG</creatorcontrib><creatorcontrib>SHEN XIN</creatorcontrib><creatorcontrib>ZHAO FENG</creatorcontrib><creatorcontrib>YU JING</creatorcontrib><creatorcontrib>ZU XILONG</creatorcontrib><creatorcontrib>ZHANG QIANG</creatorcontrib><creatorcontrib>JIANG QINGGUO</creatorcontrib><creatorcontrib>XIONG RANRAN</creatorcontrib><creatorcontrib>YU ZHONG</creatorcontrib><title>Existing station top plate concrete supporting stress system</title><description>The utility model relates to an existing station top plate concrete supporting stress system. When a main body structure and an accessory structure are constructed through an existing open excavation method, the accessory structure and the main body structure need to be poured and constructed by stages. The system comprises a station top plate of a main body structure, an auxiliary concrete support above an auxiliary structure and a bracket, the bottom of the bracket is fixedly connected to the top surface of the station top plate; one end of the auxiliary concrete support is fixedly connected to the inner side of the crown beam on the outer side of the auxiliary structure, and the other end of the auxiliary concrete support is fixedly connected to the side face of the bracket. The design problem that staged pouring is needed in the accessory structure construction process is solved, the existing station top plate and the side wall are matched with the accessory concrete support and the bracket to form a stre</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBxrcgsLsnMS1coLkksyczPUyjJL1AoyEksSVVIzs9LLkoFMopLCwryi6CqilKLixWKK4tLUnN5GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RkaGxiamZuWFoqDFRigCzQjGC</recordid><startdate>20240716</startdate><enddate>20240716</enddate><creator>WANG WEI</creator><creator>AN BINGZHONG</creator><creator>SHEN XIN</creator><creator>ZHAO FENG</creator><creator>YU JING</creator><creator>ZU XILONG</creator><creator>ZHANG QIANG</creator><creator>JIANG QINGGUO</creator><creator>XIONG RANRAN</creator><creator>YU ZHONG</creator><scope>EVB</scope></search><sort><creationdate>20240716</creationdate><title>Existing station top plate concrete supporting stress system</title><author>WANG WEI ; AN BINGZHONG ; SHEN XIN ; ZHAO FENG ; YU JING ; ZU XILONG ; ZHANG QIANG ; JIANG QINGGUO ; XIONG RANRAN ; YU ZHONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN221345671UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WEI</creatorcontrib><creatorcontrib>AN BINGZHONG</creatorcontrib><creatorcontrib>SHEN XIN</creatorcontrib><creatorcontrib>ZHAO FENG</creatorcontrib><creatorcontrib>YU JING</creatorcontrib><creatorcontrib>ZU XILONG</creatorcontrib><creatorcontrib>ZHANG QIANG</creatorcontrib><creatorcontrib>JIANG QINGGUO</creatorcontrib><creatorcontrib>XIONG RANRAN</creatorcontrib><creatorcontrib>YU ZHONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WEI</au><au>AN BINGZHONG</au><au>SHEN XIN</au><au>ZHAO FENG</au><au>YU JING</au><au>ZU XILONG</au><au>ZHANG QIANG</au><au>JIANG QINGGUO</au><au>XIONG RANRAN</au><au>YU ZHONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Existing station top plate concrete supporting stress system</title><date>2024-07-16</date><risdate>2024</risdate><abstract>The utility model relates to an existing station top plate concrete supporting stress system. When a main body structure and an accessory structure are constructed through an existing open excavation method, the accessory structure and the main body structure need to be poured and constructed by stages. The system comprises a station top plate of a main body structure, an auxiliary concrete support above an auxiliary structure and a bracket, the bottom of the bracket is fixedly connected to the top surface of the station top plate; one end of the auxiliary concrete support is fixedly connected to the inner side of the crown beam on the outer side of the auxiliary structure, and the other end of the auxiliary concrete support is fixedly connected to the side face of the bracket. The design problem that staged pouring is needed in the accessory structure construction process is solved, the existing station top plate and the side wall are matched with the accessory concrete support and the bracket to form a stre</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN221345671UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Existing station top plate concrete supporting stress system
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T03%3A38%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WEI&rft.date=2024-07-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN221345671UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true