Deep-hole large-diameter pile foundation reinforcement cage mounting and lowering positioning device

A deep-hole large-diameter pile foundation reinforcement cage installing, lowering and positioning device comprises a supporting mechanism and a hoisting mechanism, and the hoisting mechanism is arranged on one side of the supporting mechanism; the two ends of the assembly frames are fixedly connect...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI YULIANG, LIU LEI, LAI SHOUZE, GAO PENGFEI, ZHU WENJIE, CUI YUYUAN, ZUO RANWU, WANG YONG, GUO CHUNQIANG, QIN LIQIANG, PENG YISHENG, LU TONGWEI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI YULIANG
LIU LEI
LAI SHOUZE
GAO PENGFEI
ZHU WENJIE
CUI YUYUAN
ZUO RANWU
WANG YONG
GUO CHUNQIANG
QIN LIQIANG
PENG YISHENG
LU TONGWEI
description A deep-hole large-diameter pile foundation reinforcement cage installing, lowering and positioning device comprises a supporting mechanism and a hoisting mechanism, and the hoisting mechanism is arranged on one side of the supporting mechanism; the two ends of the assembly frames are fixedly connected with the extension arms, one group of extension arms are arranged at the tops of one ends of the assembly frames, the other group of extension arms are arranged at the bottoms of the other ends of the assembly frames, a plurality of adjusting holes are formed in the extension arms, the assembly frames are connected end to end through the extension arms to form a closed loop, and the extension arms are fixedly connected by inserting first sleeves into the adjusting holes; the relative position of the sliding frame and the assembling frame is adjusted, so that the position of the supporting arm relative to the reinforcement cage is adjusted, the supporting arm is pushed to slide on the sliding frame, the supportin
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN220813849UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN220813849UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN220813849UU3</originalsourceid><addsrcrecordid>eNqNi7EOgkAQRGksjPoPG3sSBQusUWNlJTW53A2wybF7OU79fSHxA6xm5s3MOnMXIOSDepA3sUfu2IxIiBR4Zp2-xJnEKhTB0mm0GCGJrOlB49wmlp6MOPL6QVxC0ImXx-Id3myxzVad8RN2P91k-9v1Wd9zBG0xBWMhSG39KIpDdSyr07lpyr9GX6hZQE8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Deep-hole large-diameter pile foundation reinforcement cage mounting and lowering positioning device</title><source>esp@cenet</source><creator>LI YULIANG ; LIU LEI ; LAI SHOUZE ; GAO PENGFEI ; ZHU WENJIE ; CUI YUYUAN ; ZUO RANWU ; WANG YONG ; GUO CHUNQIANG ; QIN LIQIANG ; PENG YISHENG ; LU TONGWEI</creator><creatorcontrib>LI YULIANG ; LIU LEI ; LAI SHOUZE ; GAO PENGFEI ; ZHU WENJIE ; CUI YUYUAN ; ZUO RANWU ; WANG YONG ; GUO CHUNQIANG ; QIN LIQIANG ; PENG YISHENG ; LU TONGWEI</creatorcontrib><description>A deep-hole large-diameter pile foundation reinforcement cage installing, lowering and positioning device comprises a supporting mechanism and a hoisting mechanism, and the hoisting mechanism is arranged on one side of the supporting mechanism; the two ends of the assembly frames are fixedly connected with the extension arms, one group of extension arms are arranged at the tops of one ends of the assembly frames, the other group of extension arms are arranged at the bottoms of the other ends of the assembly frames, a plurality of adjusting holes are formed in the extension arms, the assembly frames are connected end to end through the extension arms to form a closed loop, and the extension arms are fixedly connected by inserting first sleeves into the adjusting holes; the relative position of the sliding frame and the assembling frame is adjusted, so that the position of the supporting arm relative to the reinforcement cage is adjusted, the supporting arm is pushed to slide on the sliding frame, the supportin</description><language>chi ; eng</language><subject>BUILDING ; BUILDING MATERIALS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; STRUCTURAL ELEMENTS ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240419&amp;DB=EPODOC&amp;CC=CN&amp;NR=220813849U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240419&amp;DB=EPODOC&amp;CC=CN&amp;NR=220813849U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI YULIANG</creatorcontrib><creatorcontrib>LIU LEI</creatorcontrib><creatorcontrib>LAI SHOUZE</creatorcontrib><creatorcontrib>GAO PENGFEI</creatorcontrib><creatorcontrib>ZHU WENJIE</creatorcontrib><creatorcontrib>CUI YUYUAN</creatorcontrib><creatorcontrib>ZUO RANWU</creatorcontrib><creatorcontrib>WANG YONG</creatorcontrib><creatorcontrib>GUO CHUNQIANG</creatorcontrib><creatorcontrib>QIN LIQIANG</creatorcontrib><creatorcontrib>PENG YISHENG</creatorcontrib><creatorcontrib>LU TONGWEI</creatorcontrib><title>Deep-hole large-diameter pile foundation reinforcement cage mounting and lowering positioning device</title><description>A deep-hole large-diameter pile foundation reinforcement cage installing, lowering and positioning device comprises a supporting mechanism and a hoisting mechanism, and the hoisting mechanism is arranged on one side of the supporting mechanism; the two ends of the assembly frames are fixedly connected with the extension arms, one group of extension arms are arranged at the tops of one ends of the assembly frames, the other group of extension arms are arranged at the bottoms of the other ends of the assembly frames, a plurality of adjusting holes are formed in the extension arms, the assembly frames are connected end to end through the extension arms to form a closed loop, and the extension arms are fixedly connected by inserting first sleeves into the adjusting holes; the relative position of the sliding frame and the assembling frame is adjusted, so that the position of the supporting arm relative to the reinforcement cage is adjusted, the supporting arm is pushed to slide on the sliding frame, the supportin</description><subject>BUILDING</subject><subject>BUILDING MATERIALS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>STRUCTURAL ELEMENTS</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNi7EOgkAQRGksjPoPG3sSBQusUWNlJTW53A2wybF7OU79fSHxA6xm5s3MOnMXIOSDepA3sUfu2IxIiBR4Zp2-xJnEKhTB0mm0GCGJrOlB49wmlp6MOPL6QVxC0ImXx-Id3myxzVad8RN2P91k-9v1Wd9zBG0xBWMhSG39KIpDdSyr07lpyr9GX6hZQE8</recordid><startdate>20240419</startdate><enddate>20240419</enddate><creator>LI YULIANG</creator><creator>LIU LEI</creator><creator>LAI SHOUZE</creator><creator>GAO PENGFEI</creator><creator>ZHU WENJIE</creator><creator>CUI YUYUAN</creator><creator>ZUO RANWU</creator><creator>WANG YONG</creator><creator>GUO CHUNQIANG</creator><creator>QIN LIQIANG</creator><creator>PENG YISHENG</creator><creator>LU TONGWEI</creator><scope>EVB</scope></search><sort><creationdate>20240419</creationdate><title>Deep-hole large-diameter pile foundation reinforcement cage mounting and lowering positioning device</title><author>LI YULIANG ; LIU LEI ; LAI SHOUZE ; GAO PENGFEI ; ZHU WENJIE ; CUI YUYUAN ; ZUO RANWU ; WANG YONG ; GUO CHUNQIANG ; QIN LIQIANG ; PENG YISHENG ; LU TONGWEI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN220813849UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2024</creationdate><topic>BUILDING</topic><topic>BUILDING MATERIALS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>STRUCTURAL ELEMENTS</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>LI YULIANG</creatorcontrib><creatorcontrib>LIU LEI</creatorcontrib><creatorcontrib>LAI SHOUZE</creatorcontrib><creatorcontrib>GAO PENGFEI</creatorcontrib><creatorcontrib>ZHU WENJIE</creatorcontrib><creatorcontrib>CUI YUYUAN</creatorcontrib><creatorcontrib>ZUO RANWU</creatorcontrib><creatorcontrib>WANG YONG</creatorcontrib><creatorcontrib>GUO CHUNQIANG</creatorcontrib><creatorcontrib>QIN LIQIANG</creatorcontrib><creatorcontrib>PENG YISHENG</creatorcontrib><creatorcontrib>LU TONGWEI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI YULIANG</au><au>LIU LEI</au><au>LAI SHOUZE</au><au>GAO PENGFEI</au><au>ZHU WENJIE</au><au>CUI YUYUAN</au><au>ZUO RANWU</au><au>WANG YONG</au><au>GUO CHUNQIANG</au><au>QIN LIQIANG</au><au>PENG YISHENG</au><au>LU TONGWEI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Deep-hole large-diameter pile foundation reinforcement cage mounting and lowering positioning device</title><date>2024-04-19</date><risdate>2024</risdate><abstract>A deep-hole large-diameter pile foundation reinforcement cage installing, lowering and positioning device comprises a supporting mechanism and a hoisting mechanism, and the hoisting mechanism is arranged on one side of the supporting mechanism; the two ends of the assembly frames are fixedly connected with the extension arms, one group of extension arms are arranged at the tops of one ends of the assembly frames, the other group of extension arms are arranged at the bottoms of the other ends of the assembly frames, a plurality of adjusting holes are formed in the extension arms, the assembly frames are connected end to end through the extension arms to form a closed loop, and the extension arms are fixedly connected by inserting first sleeves into the adjusting holes; the relative position of the sliding frame and the assembling frame is adjusted, so that the position of the supporting arm relative to the reinforcement cage is adjusted, the supporting arm is pushed to slide on the sliding frame, the supportin</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN220813849UU
source esp@cenet
subjects BUILDING
BUILDING MATERIALS
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
STRUCTURAL ELEMENTS
UNDERGROUND OR UNDERWATER STRUCTURES
title Deep-hole large-diameter pile foundation reinforcement cage mounting and lowering positioning device
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T00%3A45%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20YULIANG&rft.date=2024-04-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN220813849UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true