Construction hanging basket overweight early warning equipment

The utility model provides construction hanging basket overweight early warning equipment, which is characterized in that a hanging basket load capacity control elastic piece is vertically arranged, and upper and lower connecting pieces are respectively arranged at the upper and lower ends of the ha...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DUAN XINWEI, LIU HAOQIAN, ZHANG JIAN, YAO WANG, FANG YU, CHEN RUI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator DUAN XINWEI
LIU HAOQIAN
ZHANG JIAN
YAO WANG
FANG YU
CHEN RUI
description The utility model provides construction hanging basket overweight early warning equipment, which is characterized in that a hanging basket load capacity control elastic piece is vertically arranged, and upper and lower connecting pieces are respectively arranged at the upper and lower ends of the hanging basket load capacity control elastic piece; the upper conducting rod and the lower conducting rod are vertically arranged at intervals and located on the right side of the hanging basket load capacity control elastic piece, the normally-closed contact switch is located between the upper conducting rod and the lower conducting rod and connected with the upper conducting rod and the lower conducting rod respectively, and the upper conducting rod and the lower conducting rod are connected with the power source. The upper connecting rod is connected with the upper end of the hanging basket load capacity control elastic piece and the upper end of the upper conducting rod, and the lower connecting rod is connected
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219993064UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219993064UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219993064UU3</originalsourceid><addsrcrecordid>eNrjZLBzzs8rLikqTS7JzM9TyEjMS8_MS1dISizOTi1RyC9LLSpPzUzPKFFITSzKqVQoTyzKA8mnFpZmFuSm5pXwMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz8jQ0tLS2MDM5PQUGOiFAEAMd0yXw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction hanging basket overweight early warning equipment</title><source>esp@cenet</source><creator>DUAN XINWEI ; LIU HAOQIAN ; ZHANG JIAN ; YAO WANG ; FANG YU ; CHEN RUI</creator><creatorcontrib>DUAN XINWEI ; LIU HAOQIAN ; ZHANG JIAN ; YAO WANG ; FANG YU ; CHEN RUI</creatorcontrib><description>The utility model provides construction hanging basket overweight early warning equipment, which is characterized in that a hanging basket load capacity control elastic piece is vertically arranged, and upper and lower connecting pieces are respectively arranged at the upper and lower ends of the hanging basket load capacity control elastic piece; the upper conducting rod and the lower conducting rod are vertically arranged at intervals and located on the right side of the hanging basket load capacity control elastic piece, the normally-closed contact switch is located between the upper conducting rod and the lower conducting rod and connected with the upper conducting rod and the lower conducting rod respectively, and the upper conducting rod and the lower conducting rod are connected with the power source. The upper connecting rod is connected with the upper end of the hanging basket load capacity control elastic piece and the upper end of the upper conducting rod, and the lower connecting rod is connected</description><language>chi ; eng</language><subject>ALARM SYSTEMS ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; ORDER TELEGRAPHS ; PHYSICS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SIGNALLING ; SIGNALLING OR CALLING SYSTEMS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=219993064U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231110&amp;DB=EPODOC&amp;CC=CN&amp;NR=219993064U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>DUAN XINWEI</creatorcontrib><creatorcontrib>LIU HAOQIAN</creatorcontrib><creatorcontrib>ZHANG JIAN</creatorcontrib><creatorcontrib>YAO WANG</creatorcontrib><creatorcontrib>FANG YU</creatorcontrib><creatorcontrib>CHEN RUI</creatorcontrib><title>Construction hanging basket overweight early warning equipment</title><description>The utility model provides construction hanging basket overweight early warning equipment, which is characterized in that a hanging basket load capacity control elastic piece is vertically arranged, and upper and lower connecting pieces are respectively arranged at the upper and lower ends of the hanging basket load capacity control elastic piece; the upper conducting rod and the lower conducting rod are vertically arranged at intervals and located on the right side of the hanging basket load capacity control elastic piece, the normally-closed contact switch is located between the upper conducting rod and the lower conducting rod and connected with the upper conducting rod and the lower conducting rod respectively, and the upper conducting rod and the lower conducting rod are connected with the power source. The upper connecting rod is connected with the upper end of the hanging basket load capacity control elastic piece and the upper end of the upper conducting rod, and the lower connecting rod is connected</description><subject>ALARM SYSTEMS</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>ORDER TELEGRAPHS</subject><subject>PHYSICS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SIGNALLING</subject><subject>SIGNALLING OR CALLING SYSTEMS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBzzs8rLikqTS7JzM9TyEjMS8_MS1dISizOTi1RyC9LLSpPzUzPKFFITSzKqVQoTyzKA8mnFpZmFuSm5pXwMLCmJeYUp_JCaW4GJTfXEGcP3dSC_PjU4oLE5NS81JJ4Zz8jQ0tLS2MDM5PQUGOiFAEAMd0yXw</recordid><startdate>20231110</startdate><enddate>20231110</enddate><creator>DUAN XINWEI</creator><creator>LIU HAOQIAN</creator><creator>ZHANG JIAN</creator><creator>YAO WANG</creator><creator>FANG YU</creator><creator>CHEN RUI</creator><scope>EVB</scope></search><sort><creationdate>20231110</creationdate><title>Construction hanging basket overweight early warning equipment</title><author>DUAN XINWEI ; LIU HAOQIAN ; ZHANG JIAN ; YAO WANG ; FANG YU ; CHEN RUI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219993064UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ALARM SYSTEMS</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>ORDER TELEGRAPHS</topic><topic>PHYSICS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SIGNALLING</topic><topic>SIGNALLING OR CALLING SYSTEMS</topic><toplevel>online_resources</toplevel><creatorcontrib>DUAN XINWEI</creatorcontrib><creatorcontrib>LIU HAOQIAN</creatorcontrib><creatorcontrib>ZHANG JIAN</creatorcontrib><creatorcontrib>YAO WANG</creatorcontrib><creatorcontrib>FANG YU</creatorcontrib><creatorcontrib>CHEN RUI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>DUAN XINWEI</au><au>LIU HAOQIAN</au><au>ZHANG JIAN</au><au>YAO WANG</au><au>FANG YU</au><au>CHEN RUI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction hanging basket overweight early warning equipment</title><date>2023-11-10</date><risdate>2023</risdate><abstract>The utility model provides construction hanging basket overweight early warning equipment, which is characterized in that a hanging basket load capacity control elastic piece is vertically arranged, and upper and lower connecting pieces are respectively arranged at the upper and lower ends of the hanging basket load capacity control elastic piece; the upper conducting rod and the lower conducting rod are vertically arranged at intervals and located on the right side of the hanging basket load capacity control elastic piece, the normally-closed contact switch is located between the upper conducting rod and the lower conducting rod and connected with the upper conducting rod and the lower conducting rod respectively, and the upper conducting rod and the lower conducting rod are connected with the power source. The upper connecting rod is connected with the upper end of the hanging basket load capacity control elastic piece and the upper end of the upper conducting rod, and the lower connecting rod is connected</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN219993064UU
source esp@cenet
subjects ALARM SYSTEMS
BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
FIXED CONSTRUCTIONS
FORMS
HANDLING BUILDING MATERIALS ON THE SITE
ORDER TELEGRAPHS
PHYSICS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SHUTTERING
SIGNALLING
SIGNALLING OR CALLING SYSTEMS
title Construction hanging basket overweight early warning equipment
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T13%3A18%3A02IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=DUAN%20XINWEI&rft.date=2023-11-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219993064UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true