Under-pressure plugging structure for high-water-pressure confined water precipitation well
The utility model provides a high-water-pressure confined water dewatering well under-pressure plugging structure which comprises a dewatering well casing, the dewatering well casing is arranged in a stratum, and a cushion layer and a bottom plate are sequentially arranged above the stratum from bot...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHEN WEI YANG YUEFENG LI FENG ZHONG GUIRONG LU SHOULIN LIN FENG LI ZHIWEI HUANG ZHIQIANG HOU YIHUI YU WEI LUO ZHENHAI LIN ZHIQIANG CHEN PEISONG |
description | The utility model provides a high-water-pressure confined water dewatering well under-pressure plugging structure which comprises a dewatering well casing, the dewatering well casing is arranged in a stratum, and a cushion layer and a bottom plate are sequentially arranged above the stratum from bottom to top. A first drainage pipe is arranged in the dewatering well casing, and the upper end of the first drainage pipe is connected with a second drainage pipe; the second drainage pipe extends out of the upper end of the dewatering well inlet pipe and is connected with a water suction pump, and a valve is further arranged at the upper end of the first drainage pipe. The dewatering well casing is sequentially provided with a sandy gravel layer, a quick-setting cement layer and a concrete layer from bottom to top, and the upper end of the first drainage pipe is embedded in the concrete layer; and when the quick-setting cement layer is laid, the valve is closed, the second drainage pipe is detached, and then the c |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219794010UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219794010UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219794010UU3</originalsourceid><addsrcrecordid>eNrjZIgOzUtJLdItKEotLi4tSlUoyClNT8_MS1coLikqTS4BCaXlFylkZKZn6JYnliArTc7PS8vMS01RAIsrAMWTMwsySxJLMvPzFMpTc3J4GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RoaW5pYmBoUFoqDFRigCSpD1_</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Under-pressure plugging structure for high-water-pressure confined water precipitation well</title><source>esp@cenet</source><creator>CHEN WEI ; YANG YUEFENG ; LI FENG ; ZHONG GUIRONG ; LU SHOULIN ; LIN FENG ; LI ZHIWEI ; HUANG ZHIQIANG ; HOU YIHUI ; YU WEI ; LUO ZHENHAI ; LIN ZHIQIANG ; CHEN PEISONG</creator><creatorcontrib>CHEN WEI ; YANG YUEFENG ; LI FENG ; ZHONG GUIRONG ; LU SHOULIN ; LIN FENG ; LI ZHIWEI ; HUANG ZHIQIANG ; HOU YIHUI ; YU WEI ; LUO ZHENHAI ; LIN ZHIQIANG ; CHEN PEISONG</creatorcontrib><description>The utility model provides a high-water-pressure confined water dewatering well under-pressure plugging structure which comprises a dewatering well casing, the dewatering well casing is arranged in a stratum, and a cushion layer and a bottom plate are sequentially arranged above the stratum from bottom to top. A first drainage pipe is arranged in the dewatering well casing, and the upper end of the first drainage pipe is connected with a second drainage pipe; the second drainage pipe extends out of the upper end of the dewatering well inlet pipe and is connected with a water suction pump, and a valve is further arranged at the upper end of the first drainage pipe. The dewatering well casing is sequentially provided with a sandy gravel layer, a quick-setting cement layer and a concrete layer from bottom to top, and the upper end of the first drainage pipe is embedded in the concrete layer; and when the quick-setting cement layer is laid, the valve is closed, the second drainage pipe is detached, and then the c</description><language>chi ; eng</language><subject>CESSPOOLS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SEWERAGE ; SEWERS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WATER SUPPLY</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231003&DB=EPODOC&CC=CN&NR=219794010U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231003&DB=EPODOC&CC=CN&NR=219794010U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN WEI</creatorcontrib><creatorcontrib>YANG YUEFENG</creatorcontrib><creatorcontrib>LI FENG</creatorcontrib><creatorcontrib>ZHONG GUIRONG</creatorcontrib><creatorcontrib>LU SHOULIN</creatorcontrib><creatorcontrib>LIN FENG</creatorcontrib><creatorcontrib>LI ZHIWEI</creatorcontrib><creatorcontrib>HUANG ZHIQIANG</creatorcontrib><creatorcontrib>HOU YIHUI</creatorcontrib><creatorcontrib>YU WEI</creatorcontrib><creatorcontrib>LUO ZHENHAI</creatorcontrib><creatorcontrib>LIN ZHIQIANG</creatorcontrib><creatorcontrib>CHEN PEISONG</creatorcontrib><title>Under-pressure plugging structure for high-water-pressure confined water precipitation well</title><description>The utility model provides a high-water-pressure confined water dewatering well under-pressure plugging structure which comprises a dewatering well casing, the dewatering well casing is arranged in a stratum, and a cushion layer and a bottom plate are sequentially arranged above the stratum from bottom to top. A first drainage pipe is arranged in the dewatering well casing, and the upper end of the first drainage pipe is connected with a second drainage pipe; the second drainage pipe extends out of the upper end of the dewatering well inlet pipe and is connected with a water suction pump, and a valve is further arranged at the upper end of the first drainage pipe. The dewatering well casing is sequentially provided with a sandy gravel layer, a quick-setting cement layer and a concrete layer from bottom to top, and the upper end of the first drainage pipe is embedded in the concrete layer; and when the quick-setting cement layer is laid, the valve is closed, the second drainage pipe is detached, and then the c</description><subject>CESSPOOLS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SEWERAGE</subject><subject>SEWERS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WATER SUPPLY</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZIgOzUtJLdItKEotLi4tSlUoyClNT8_MS1coLikqTS4BCaXlFylkZKZn6JYnliArTc7PS8vMS01RAIsrAMWTMwsySxJLMvPzFMpTc3J4GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RoaW5pYmBoUFoqDFRigCSpD1_</recordid><startdate>20231003</startdate><enddate>20231003</enddate><creator>CHEN WEI</creator><creator>YANG YUEFENG</creator><creator>LI FENG</creator><creator>ZHONG GUIRONG</creator><creator>LU SHOULIN</creator><creator>LIN FENG</creator><creator>LI ZHIWEI</creator><creator>HUANG ZHIQIANG</creator><creator>HOU YIHUI</creator><creator>YU WEI</creator><creator>LUO ZHENHAI</creator><creator>LIN ZHIQIANG</creator><creator>CHEN PEISONG</creator><scope>EVB</scope></search><sort><creationdate>20231003</creationdate><title>Under-pressure plugging structure for high-water-pressure confined water precipitation well</title><author>CHEN WEI ; YANG YUEFENG ; LI FENG ; ZHONG GUIRONG ; LU SHOULIN ; LIN FENG ; LI ZHIWEI ; HUANG ZHIQIANG ; HOU YIHUI ; YU WEI ; LUO ZHENHAI ; LIN ZHIQIANG ; CHEN PEISONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219794010UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CESSPOOLS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SEWERAGE</topic><topic>SEWERS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WATER SUPPLY</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN WEI</creatorcontrib><creatorcontrib>YANG YUEFENG</creatorcontrib><creatorcontrib>LI FENG</creatorcontrib><creatorcontrib>ZHONG GUIRONG</creatorcontrib><creatorcontrib>LU SHOULIN</creatorcontrib><creatorcontrib>LIN FENG</creatorcontrib><creatorcontrib>LI ZHIWEI</creatorcontrib><creatorcontrib>HUANG ZHIQIANG</creatorcontrib><creatorcontrib>HOU YIHUI</creatorcontrib><creatorcontrib>YU WEI</creatorcontrib><creatorcontrib>LUO ZHENHAI</creatorcontrib><creatorcontrib>LIN ZHIQIANG</creatorcontrib><creatorcontrib>CHEN PEISONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN WEI</au><au>YANG YUEFENG</au><au>LI FENG</au><au>ZHONG GUIRONG</au><au>LU SHOULIN</au><au>LIN FENG</au><au>LI ZHIWEI</au><au>HUANG ZHIQIANG</au><au>HOU YIHUI</au><au>YU WEI</au><au>LUO ZHENHAI</au><au>LIN ZHIQIANG</au><au>CHEN PEISONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Under-pressure plugging structure for high-water-pressure confined water precipitation well</title><date>2023-10-03</date><risdate>2023</risdate><abstract>The utility model provides a high-water-pressure confined water dewatering well under-pressure plugging structure which comprises a dewatering well casing, the dewatering well casing is arranged in a stratum, and a cushion layer and a bottom plate are sequentially arranged above the stratum from bottom to top. A first drainage pipe is arranged in the dewatering well casing, and the upper end of the first drainage pipe is connected with a second drainage pipe; the second drainage pipe extends out of the upper end of the dewatering well inlet pipe and is connected with a water suction pump, and a valve is further arranged at the upper end of the first drainage pipe. The dewatering well casing is sequentially provided with a sandy gravel layer, a quick-setting cement layer and a concrete layer from bottom to top, and the upper end of the first drainage pipe is embedded in the concrete layer; and when the quick-setting cement layer is laid, the valve is closed, the second drainage pipe is detached, and then the c</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN219794010UU |
source | esp@cenet |
subjects | CESSPOOLS EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SEWERAGE SEWERS SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES WATER SUPPLY |
title | Under-pressure plugging structure for high-water-pressure confined water precipitation well |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T12%3A58%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20WEI&rft.date=2023-10-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219794010UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |