Bridge with simple structure and continuous bridge floor

The utility model provides a bridge with a simple structure and a continuous bridge floor. The bridge comprises a pier, a first precast beam, a second precast beam, an integration layer, an asphalt concrete layer and an ultra-high performance concrete layer. The first precast beam and the second pre...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HAN ZHENYONG, HE YAOBEI, CAO HAIQING, ZENG YINYONG, WANG XIUYAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HAN ZHENYONG
HE YAOBEI
CAO HAIQING
ZENG YINYONG
WANG XIUYAN
description The utility model provides a bridge with a simple structure and a continuous bridge floor. The bridge comprises a pier, a first precast beam, a second precast beam, an integration layer, an asphalt concrete layer and an ultra-high performance concrete layer. The first precast beam and the second precast beam are arranged on the pier. The joint of the first precast beam and the second precast beam is located in the corresponding area of the working face of the pier. The integration layer and the ultra-high performance concrete layer are arranged on the same layer. And the covering layer is located on the side, away from the pier, of the integration layer and covers the first precast beam and the second precast beam. The ultra-high performance concrete layer at least covers the area above the pier top of the pier. Concrete in the area above the pier top is replaced by ultra-high performance concrete (UHPC), and the crack resistance of the continuous layer of the bridge deck is improved by utilizing the ultra-hi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219793690UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219793690UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219793690UU3</originalsourceid><addsrcrecordid>eNrjZLBwKspMSU9VKM8syVAozswtyElVKC4pKk0uKS1KVUjMS1FIzs8rycwrzS8tVkiCqE3Lyc8v4mFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RoaW5pbGZpYGoaHGRCkCAJHzL4w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Bridge with simple structure and continuous bridge floor</title><source>esp@cenet</source><creator>HAN ZHENYONG ; HE YAOBEI ; CAO HAIQING ; ZENG YINYONG ; WANG XIUYAN</creator><creatorcontrib>HAN ZHENYONG ; HE YAOBEI ; CAO HAIQING ; ZENG YINYONG ; WANG XIUYAN</creatorcontrib><description>The utility model provides a bridge with a simple structure and a continuous bridge floor. The bridge comprises a pier, a first precast beam, a second precast beam, an integration layer, an asphalt concrete layer and an ultra-high performance concrete layer. The first precast beam and the second precast beam are arranged on the pier. The joint of the first precast beam and the second precast beam is located in the corresponding area of the working face of the pier. The integration layer and the ultra-high performance concrete layer are arranged on the same layer. And the covering layer is located on the side, away from the pier, of the integration layer and covers the first precast beam and the second precast beam. The ultra-high performance concrete layer at least covers the area above the pier top of the pier. Concrete in the area above the pier top is replaced by ultra-high performance concrete (UHPC), and the crack resistance of the continuous layer of the bridge deck is improved by utilizing the ultra-hi</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231003&amp;DB=EPODOC&amp;CC=CN&amp;NR=219793690U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231003&amp;DB=EPODOC&amp;CC=CN&amp;NR=219793690U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HAN ZHENYONG</creatorcontrib><creatorcontrib>HE YAOBEI</creatorcontrib><creatorcontrib>CAO HAIQING</creatorcontrib><creatorcontrib>ZENG YINYONG</creatorcontrib><creatorcontrib>WANG XIUYAN</creatorcontrib><title>Bridge with simple structure and continuous bridge floor</title><description>The utility model provides a bridge with a simple structure and a continuous bridge floor. The bridge comprises a pier, a first precast beam, a second precast beam, an integration layer, an asphalt concrete layer and an ultra-high performance concrete layer. The first precast beam and the second precast beam are arranged on the pier. The joint of the first precast beam and the second precast beam is located in the corresponding area of the working face of the pier. The integration layer and the ultra-high performance concrete layer are arranged on the same layer. And the covering layer is located on the side, away from the pier, of the integration layer and covers the first precast beam and the second precast beam. The ultra-high performance concrete layer at least covers the area above the pier top of the pier. Concrete in the area above the pier top is replaced by ultra-high performance concrete (UHPC), and the crack resistance of the continuous layer of the bridge deck is improved by utilizing the ultra-hi</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBwKspMSU9VKM8syVAozswtyElVKC4pKk0uKS1KVUjMS1FIzs8rycwrzS8tVkiCqE3Lyc8v4mFgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RoaW5pbGZpYGoaHGRCkCAJHzL4w</recordid><startdate>20231003</startdate><enddate>20231003</enddate><creator>HAN ZHENYONG</creator><creator>HE YAOBEI</creator><creator>CAO HAIQING</creator><creator>ZENG YINYONG</creator><creator>WANG XIUYAN</creator><scope>EVB</scope></search><sort><creationdate>20231003</creationdate><title>Bridge with simple structure and continuous bridge floor</title><author>HAN ZHENYONG ; HE YAOBEI ; CAO HAIQING ; ZENG YINYONG ; WANG XIUYAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219793690UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>HAN ZHENYONG</creatorcontrib><creatorcontrib>HE YAOBEI</creatorcontrib><creatorcontrib>CAO HAIQING</creatorcontrib><creatorcontrib>ZENG YINYONG</creatorcontrib><creatorcontrib>WANG XIUYAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HAN ZHENYONG</au><au>HE YAOBEI</au><au>CAO HAIQING</au><au>ZENG YINYONG</au><au>WANG XIUYAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Bridge with simple structure and continuous bridge floor</title><date>2023-10-03</date><risdate>2023</risdate><abstract>The utility model provides a bridge with a simple structure and a continuous bridge floor. The bridge comprises a pier, a first precast beam, a second precast beam, an integration layer, an asphalt concrete layer and an ultra-high performance concrete layer. The first precast beam and the second precast beam are arranged on the pier. The joint of the first precast beam and the second precast beam is located in the corresponding area of the working face of the pier. The integration layer and the ultra-high performance concrete layer are arranged on the same layer. And the covering layer is located on the side, away from the pier, of the integration layer and covers the first precast beam and the second precast beam. The ultra-high performance concrete layer at least covers the area above the pier top of the pier. Concrete in the area above the pier top is replaced by ultra-high performance concrete (UHPC), and the crack resistance of the continuous layer of the bridge deck is improved by utilizing the ultra-hi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN219793690UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Bridge with simple structure and continuous bridge floor
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T13%3A13%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HAN%20ZHENYONG&rft.date=2023-10-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219793690UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true