Movable trestle for uninterrupted construction of tunnel

The utility model relates to a movable trestle for uninterrupted construction of a tunnel, which comprises a main bridge, a front approach bridge and a rear approach bridge which are respectively matched with the front end and the rear end of the main bridge, a walking unit matched with the movable...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WAN AIZHOU, JIANG GUOLIN, HUANG LONG, LI YUNI, YANG YONGCHAO, ZHENG YONGHUA, TIAN FURUI, ZHANG HONG, TANG HAIJUN, LI JIAN, WU HAO, ZENG XIANCAI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WAN AIZHOU
JIANG GUOLIN
HUANG LONG
LI YUNI
YANG YONGCHAO
ZHENG YONGHUA
TIAN FURUI
ZHANG HONG
TANG HAIJUN
LI JIAN
WU HAO
ZENG XIANCAI
description The utility model relates to a movable trestle for uninterrupted construction of a tunnel, which comprises a main bridge, a front approach bridge and a rear approach bridge which are respectively matched with the front end and the rear end of the main bridge, a walking unit matched with the movable trestle, and a width adjusting unit matched with the walking unit. According to the movable trestle, the width of the movable trestle can be increased or decreased with the center shaft as the reference, and the displacement amount and the displacement frequency are reduced; large engineering vehicles can pass conveniently, and the vehicle driving path does not need to be adjusted frequently; abrasion of parts of the movable trestle is reduced, and the service life of the movable trestle is prolonged; the method is especially suitable for variable cross-section tunnel construction. 本实用新型涉及一种隧道不间断施工用移动栈桥,包括主桥,配合所述主桥的前端和后端分别设有前引桥和后引桥,配合所述移动栈桥设有行走单元,配合所述行走单元的移动栈桥还设有宽幅调节单元。本实用新型可以以中心轴为基准进行移动栈桥的宽幅的增加或减小,减少位移量、位移频次;便于大型工
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219470647UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219470647UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219470647UU3</originalsourceid><addsrcrecordid>eNrjZLDwzS9LTMpJVSgpSi0uAdJp-UUKpXmZeSWpRUWlBSWpKQrJ-XnFJUWlySWZ-XkK-WkKJaV5eak5PAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3tnPyNDSxNzAzMQ8NNSYKEUAzjYwAg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Movable trestle for uninterrupted construction of tunnel</title><source>esp@cenet</source><creator>WAN AIZHOU ; JIANG GUOLIN ; HUANG LONG ; LI YUNI ; YANG YONGCHAO ; ZHENG YONGHUA ; TIAN FURUI ; ZHANG HONG ; TANG HAIJUN ; LI JIAN ; WU HAO ; ZENG XIANCAI</creator><creatorcontrib>WAN AIZHOU ; JIANG GUOLIN ; HUANG LONG ; LI YUNI ; YANG YONGCHAO ; ZHENG YONGHUA ; TIAN FURUI ; ZHANG HONG ; TANG HAIJUN ; LI JIAN ; WU HAO ; ZENG XIANCAI</creatorcontrib><description>The utility model relates to a movable trestle for uninterrupted construction of a tunnel, which comprises a main bridge, a front approach bridge and a rear approach bridge which are respectively matched with the front end and the rear end of the main bridge, a walking unit matched with the movable trestle, and a width adjusting unit matched with the walking unit. According to the movable trestle, the width of the movable trestle can be increased or decreased with the center shaft as the reference, and the displacement amount and the displacement frequency are reduced; large engineering vehicles can pass conveniently, and the vehicle driving path does not need to be adjusted frequently; abrasion of parts of the movable trestle is reduced, and the service life of the movable trestle is prolonged; the method is especially suitable for variable cross-section tunnel construction. 本实用新型涉及一种隧道不间断施工用移动栈桥,包括主桥,配合所述主桥的前端和后端分别设有前引桥和后引桥,配合所述移动栈桥设有行走单元,配合所述行走单元的移动栈桥还设有宽幅调节单元。本实用新型可以以中心轴为基准进行移动栈桥的宽幅的增加或减小,减少位移量、位移频次;便于大型工</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230804&amp;DB=EPODOC&amp;CC=CN&amp;NR=219470647U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230804&amp;DB=EPODOC&amp;CC=CN&amp;NR=219470647U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WAN AIZHOU</creatorcontrib><creatorcontrib>JIANG GUOLIN</creatorcontrib><creatorcontrib>HUANG LONG</creatorcontrib><creatorcontrib>LI YUNI</creatorcontrib><creatorcontrib>YANG YONGCHAO</creatorcontrib><creatorcontrib>ZHENG YONGHUA</creatorcontrib><creatorcontrib>TIAN FURUI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>TANG HAIJUN</creatorcontrib><creatorcontrib>LI JIAN</creatorcontrib><creatorcontrib>WU HAO</creatorcontrib><creatorcontrib>ZENG XIANCAI</creatorcontrib><title>Movable trestle for uninterrupted construction of tunnel</title><description>The utility model relates to a movable trestle for uninterrupted construction of a tunnel, which comprises a main bridge, a front approach bridge and a rear approach bridge which are respectively matched with the front end and the rear end of the main bridge, a walking unit matched with the movable trestle, and a width adjusting unit matched with the walking unit. According to the movable trestle, the width of the movable trestle can be increased or decreased with the center shaft as the reference, and the displacement amount and the displacement frequency are reduced; large engineering vehicles can pass conveniently, and the vehicle driving path does not need to be adjusted frequently; abrasion of parts of the movable trestle is reduced, and the service life of the movable trestle is prolonged; the method is especially suitable for variable cross-section tunnel construction. 本实用新型涉及一种隧道不间断施工用移动栈桥,包括主桥,配合所述主桥的前端和后端分别设有前引桥和后引桥,配合所述移动栈桥设有行走单元,配合所述行走单元的移动栈桥还设有宽幅调节单元。本实用新型可以以中心轴为基准进行移动栈桥的宽幅的增加或减小,减少位移量、位移频次;便于大型工</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDwzS9LTMpJVSgpSi0uAdJp-UUKpXmZeSWpRUWlBSWpKQrJ-XnFJUWlySWZ-XkK-WkKJaV5eak5PAysaYk5xam8UJqbQcnNNcTZQze1ID8-tbggMTk1L7Uk3tnPyNDSxNzAzMQ8NNSYKEUAzjYwAg</recordid><startdate>20230804</startdate><enddate>20230804</enddate><creator>WAN AIZHOU</creator><creator>JIANG GUOLIN</creator><creator>HUANG LONG</creator><creator>LI YUNI</creator><creator>YANG YONGCHAO</creator><creator>ZHENG YONGHUA</creator><creator>TIAN FURUI</creator><creator>ZHANG HONG</creator><creator>TANG HAIJUN</creator><creator>LI JIAN</creator><creator>WU HAO</creator><creator>ZENG XIANCAI</creator><scope>EVB</scope></search><sort><creationdate>20230804</creationdate><title>Movable trestle for uninterrupted construction of tunnel</title><author>WAN AIZHOU ; JIANG GUOLIN ; HUANG LONG ; LI YUNI ; YANG YONGCHAO ; ZHENG YONGHUA ; TIAN FURUI ; ZHANG HONG ; TANG HAIJUN ; LI JIAN ; WU HAO ; ZENG XIANCAI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219470647UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>WAN AIZHOU</creatorcontrib><creatorcontrib>JIANG GUOLIN</creatorcontrib><creatorcontrib>HUANG LONG</creatorcontrib><creatorcontrib>LI YUNI</creatorcontrib><creatorcontrib>YANG YONGCHAO</creatorcontrib><creatorcontrib>ZHENG YONGHUA</creatorcontrib><creatorcontrib>TIAN FURUI</creatorcontrib><creatorcontrib>ZHANG HONG</creatorcontrib><creatorcontrib>TANG HAIJUN</creatorcontrib><creatorcontrib>LI JIAN</creatorcontrib><creatorcontrib>WU HAO</creatorcontrib><creatorcontrib>ZENG XIANCAI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WAN AIZHOU</au><au>JIANG GUOLIN</au><au>HUANG LONG</au><au>LI YUNI</au><au>YANG YONGCHAO</au><au>ZHENG YONGHUA</au><au>TIAN FURUI</au><au>ZHANG HONG</au><au>TANG HAIJUN</au><au>LI JIAN</au><au>WU HAO</au><au>ZENG XIANCAI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Movable trestle for uninterrupted construction of tunnel</title><date>2023-08-04</date><risdate>2023</risdate><abstract>The utility model relates to a movable trestle for uninterrupted construction of a tunnel, which comprises a main bridge, a front approach bridge and a rear approach bridge which are respectively matched with the front end and the rear end of the main bridge, a walking unit matched with the movable trestle, and a width adjusting unit matched with the walking unit. According to the movable trestle, the width of the movable trestle can be increased or decreased with the center shaft as the reference, and the displacement amount and the displacement frequency are reduced; large engineering vehicles can pass conveniently, and the vehicle driving path does not need to be adjusted frequently; abrasion of parts of the movable trestle is reduced, and the service life of the movable trestle is prolonged; the method is especially suitable for variable cross-section tunnel construction. 本实用新型涉及一种隧道不间断施工用移动栈桥,包括主桥,配合所述主桥的前端和后端分别设有前引桥和后引桥,配合所述移动栈桥设有行走单元,配合所述行走单元的移动栈桥还设有宽幅调节单元。本实用新型可以以中心轴为基准进行移动栈桥的宽幅的增加或减小,减少位移量、位移频次;便于大型工</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN219470647UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Movable trestle for uninterrupted construction of tunnel
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T16%3A53%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WAN%20AIZHOU&rft.date=2023-08-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219470647UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true