Material transportation structure based on deep foundation pit with high middle and low periphery
The utility model discloses a material transportation structure based on a deep foundation pit with a high middle and a low periphery, which comprises a trestle assembly, the trestle assembly comprises a first ramp, a straight road and a second ramp, and the first ramp, the straight road and the sec...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG WENTING WANG SEN GUO YAXING GONG FUQIANG WANG YISEN SUN CHENGBO LUO HAOBO ZHANG CHAOSHUO |
description | The utility model discloses a material transportation structure based on a deep foundation pit with a high middle and a low periphery, which comprises a trestle assembly, the trestle assembly comprises a first ramp, a straight road and a second ramp, and the first ramp, the straight road and the second ramp are connected into a whole; the straight road is arranged at the deep position of the periphery of a foundation pit, one end of the first ramp is in lap joint with a natural terrace at the top of the foundation pit, and one end of the second ramp is in lap joint with the high position in the middle of the foundation pit. The structure further comprises an earth riding track which is arranged in the deep position of the periphery of the foundation pit, and the earth riding track corresponds to a natural terrace on the top of the foundation pit. According to the material transportation structure based on the deep foundation pit with the high middle and the low periphery, the structure is reasonable, the tres |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219385980UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219385980UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219385980UU3</originalsourceid><addsrcrecordid>eNqNjLEKwjAQQLs4iPoPh7ugFqGdi-Kik53L2Vybg5gcyYXi31vQD3B68Hi8ZYE3VIqMDjSiTxKionLwkDTmXnMkeGIiA7MyRAJDyN58E2GFidWC5dHCi41xBOgNuDCBzFexFN_rYjGgS7T5cVVsL-dHc92RhI6SYE-etGvux0NdVqe62rdt-Vf0Ae9rPyQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Material transportation structure based on deep foundation pit with high middle and low periphery</title><source>esp@cenet</source><creator>WANG WENTING ; WANG SEN ; GUO YAXING ; GONG FUQIANG ; WANG YISEN ; SUN CHENGBO ; LUO HAOBO ; ZHANG CHAOSHUO</creator><creatorcontrib>WANG WENTING ; WANG SEN ; GUO YAXING ; GONG FUQIANG ; WANG YISEN ; SUN CHENGBO ; LUO HAOBO ; ZHANG CHAOSHUO</creatorcontrib><description>The utility model discloses a material transportation structure based on a deep foundation pit with a high middle and a low periphery, which comprises a trestle assembly, the trestle assembly comprises a first ramp, a straight road and a second ramp, and the first ramp, the straight road and the second ramp are connected into a whole; the straight road is arranged at the deep position of the periphery of a foundation pit, one end of the first ramp is in lap joint with a natural terrace at the top of the foundation pit, and one end of the second ramp is in lap joint with the high position in the middle of the foundation pit. The structure further comprises an earth riding track which is arranged in the deep position of the periphery of the foundation pit, and the earth riding track corresponds to a natural terrace on the top of the foundation pit. According to the material transportation structure based on the deep foundation pit with the high middle and the low periphery, the structure is reasonable, the tres</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; OR VIADUCTS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230721&DB=EPODOC&CC=CN&NR=219385980U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230721&DB=EPODOC&CC=CN&NR=219385980U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG WENTING</creatorcontrib><creatorcontrib>WANG SEN</creatorcontrib><creatorcontrib>GUO YAXING</creatorcontrib><creatorcontrib>GONG FUQIANG</creatorcontrib><creatorcontrib>WANG YISEN</creatorcontrib><creatorcontrib>SUN CHENGBO</creatorcontrib><creatorcontrib>LUO HAOBO</creatorcontrib><creatorcontrib>ZHANG CHAOSHUO</creatorcontrib><title>Material transportation structure based on deep foundation pit with high middle and low periphery</title><description>The utility model discloses a material transportation structure based on a deep foundation pit with a high middle and a low periphery, which comprises a trestle assembly, the trestle assembly comprises a first ramp, a straight road and a second ramp, and the first ramp, the straight road and the second ramp are connected into a whole; the straight road is arranged at the deep position of the periphery of a foundation pit, one end of the first ramp is in lap joint with a natural terrace at the top of the foundation pit, and one end of the second ramp is in lap joint with the high position in the middle of the foundation pit. The structure further comprises an earth riding track which is arranged in the deep position of the periphery of the foundation pit, and the earth riding track corresponds to a natural terrace on the top of the foundation pit. According to the material transportation structure based on the deep foundation pit with the high middle and the low periphery, the structure is reasonable, the tres</description><subject>ASSEMBLY OF BRIDGES</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>OR VIADUCTS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEKwjAQQLs4iPoPh7ugFqGdi-Kik53L2Vybg5gcyYXi31vQD3B68Hi8ZYE3VIqMDjSiTxKionLwkDTmXnMkeGIiA7MyRAJDyN58E2GFidWC5dHCi41xBOgNuDCBzFexFN_rYjGgS7T5cVVsL-dHc92RhI6SYE-etGvux0NdVqe62rdt-Vf0Ae9rPyQ</recordid><startdate>20230721</startdate><enddate>20230721</enddate><creator>WANG WENTING</creator><creator>WANG SEN</creator><creator>GUO YAXING</creator><creator>GONG FUQIANG</creator><creator>WANG YISEN</creator><creator>SUN CHENGBO</creator><creator>LUO HAOBO</creator><creator>ZHANG CHAOSHUO</creator><scope>EVB</scope></search><sort><creationdate>20230721</creationdate><title>Material transportation structure based on deep foundation pit with high middle and low periphery</title><author>WANG WENTING ; WANG SEN ; GUO YAXING ; GONG FUQIANG ; WANG YISEN ; SUN CHENGBO ; LUO HAOBO ; ZHANG CHAOSHUO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219385980UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>OR VIADUCTS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG WENTING</creatorcontrib><creatorcontrib>WANG SEN</creatorcontrib><creatorcontrib>GUO YAXING</creatorcontrib><creatorcontrib>GONG FUQIANG</creatorcontrib><creatorcontrib>WANG YISEN</creatorcontrib><creatorcontrib>SUN CHENGBO</creatorcontrib><creatorcontrib>LUO HAOBO</creatorcontrib><creatorcontrib>ZHANG CHAOSHUO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG WENTING</au><au>WANG SEN</au><au>GUO YAXING</au><au>GONG FUQIANG</au><au>WANG YISEN</au><au>SUN CHENGBO</au><au>LUO HAOBO</au><au>ZHANG CHAOSHUO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Material transportation structure based on deep foundation pit with high middle and low periphery</title><date>2023-07-21</date><risdate>2023</risdate><abstract>The utility model discloses a material transportation structure based on a deep foundation pit with a high middle and a low periphery, which comprises a trestle assembly, the trestle assembly comprises a first ramp, a straight road and a second ramp, and the first ramp, the straight road and the second ramp are connected into a whole; the straight road is arranged at the deep position of the periphery of a foundation pit, one end of the first ramp is in lap joint with a natural terrace at the top of the foundation pit, and one end of the second ramp is in lap joint with the high position in the middle of the foundation pit. The structure further comprises an earth riding track which is arranged in the deep position of the periphery of the foundation pit, and the earth riding track corresponds to a natural terrace on the top of the foundation pit. According to the material transportation structure based on the deep foundation pit with the high middle and the low periphery, the structure is reasonable, the tres</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN219385980UU |
source | esp@cenet |
subjects | ASSEMBLY OF BRIDGES BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE CONSTRUCTION OF BRIDGES CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FORMS FOUNDATIONS HANDLING BUILDING MATERIALS ON THE SITE HYDRAULIC ENGINEERING OR VIADUCTS REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Material transportation structure based on deep foundation pit with high middle and low periphery |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-04T08%3A54%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20WENTING&rft.date=2023-07-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219385980UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |