Transition steel ring for ultra-large block type steel sleeve
The utility model relates to the technical field of tunnel construction, in particular to a transition steel ring for an ultra-large partitioned steel sleeve, which comprises steel ring scattered blocks, the steel ring scattered blocks are connected end to end to form a circular ring, the steel ring...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHAO BINGJING SUN CHANG'AN CHEN YONGJUN ZHANG LIMING |
description | The utility model relates to the technical field of tunnel construction, in particular to a transition steel ring for an ultra-large partitioned steel sleeve, which comprises steel ring scattered blocks, the steel ring scattered blocks are connected end to end to form a circular ring, the steel ring scattered blocks are connected with the steel sleeves, butt joint rings are arranged at the edges of the steel sleeves, and the steel ring scattered blocks are mounted on the butt joint rings at the two connected steel sleeves. When the steel sleeve is installed, a plurality of steel ring scattered blocks are installed at the connecting position of the steel sleeve, due to the fact that a fixing mechanism with good sealing performance is arranged, the middle of a movable plate can be moved only by rotating a twisting column, a positioning column is inserted into a positioning hole, stable installation can be achieved, operation is easy, and when the movable plate moves, an air storage bag is squeezed, and the safe |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219316965UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219316965UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219316965UU3</originalsourceid><addsrcrecordid>eNrjZLANKUrMK84syczPUyguSU3NUSjKzEtXSMsvUijNKSlK1M1JLEpPVUjKyU_OViipLEiFqirOSU0tS-VhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGlsaGZpZmpqGhxkQpAgCRBzEZ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Transition steel ring for ultra-large block type steel sleeve</title><source>esp@cenet</source><creator>ZHAO BINGJING ; SUN CHANG'AN ; CHEN YONGJUN ; ZHANG LIMING</creator><creatorcontrib>ZHAO BINGJING ; SUN CHANG'AN ; CHEN YONGJUN ; ZHANG LIMING</creatorcontrib><description>The utility model relates to the technical field of tunnel construction, in particular to a transition steel ring for an ultra-large partitioned steel sleeve, which comprises steel ring scattered blocks, the steel ring scattered blocks are connected end to end to form a circular ring, the steel ring scattered blocks are connected with the steel sleeves, butt joint rings are arranged at the edges of the steel sleeves, and the steel ring scattered blocks are mounted on the butt joint rings at the two connected steel sleeves. When the steel sleeve is installed, a plurality of steel ring scattered blocks are installed at the connecting position of the steel sleeve, due to the fact that a fixing mechanism with good sealing performance is arranged, the middle of a movable plate can be moved only by rotating a twisting column, a positioning column is inserted into a positioning hole, stable installation can be achieved, operation is easy, and when the movable plate moves, an air storage bag is squeezed, and the safe</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230707&DB=EPODOC&CC=CN&NR=219316965U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230707&DB=EPODOC&CC=CN&NR=219316965U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAO BINGJING</creatorcontrib><creatorcontrib>SUN CHANG'AN</creatorcontrib><creatorcontrib>CHEN YONGJUN</creatorcontrib><creatorcontrib>ZHANG LIMING</creatorcontrib><title>Transition steel ring for ultra-large block type steel sleeve</title><description>The utility model relates to the technical field of tunnel construction, in particular to a transition steel ring for an ultra-large partitioned steel sleeve, which comprises steel ring scattered blocks, the steel ring scattered blocks are connected end to end to form a circular ring, the steel ring scattered blocks are connected with the steel sleeves, butt joint rings are arranged at the edges of the steel sleeves, and the steel ring scattered blocks are mounted on the butt joint rings at the two connected steel sleeves. When the steel sleeve is installed, a plurality of steel ring scattered blocks are installed at the connecting position of the steel sleeve, due to the fact that a fixing mechanism with good sealing performance is arranged, the middle of a movable plate can be moved only by rotating a twisting column, a positioning column is inserted into a positioning hole, stable installation can be achieved, operation is easy, and when the movable plate moves, an air storage bag is squeezed, and the safe</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLANKUrMK84syczPUyguSU3NUSjKzEtXSMsvUijNKSlK1M1JLEpPVUjKyU_OViipLEiFqirOSU0tS-VhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGlsaGZpZmpqGhxkQpAgCRBzEZ</recordid><startdate>20230707</startdate><enddate>20230707</enddate><creator>ZHAO BINGJING</creator><creator>SUN CHANG'AN</creator><creator>CHEN YONGJUN</creator><creator>ZHANG LIMING</creator><scope>EVB</scope></search><sort><creationdate>20230707</creationdate><title>Transition steel ring for ultra-large block type steel sleeve</title><author>ZHAO BINGJING ; SUN CHANG'AN ; CHEN YONGJUN ; ZHANG LIMING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219316965UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAO BINGJING</creatorcontrib><creatorcontrib>SUN CHANG'AN</creatorcontrib><creatorcontrib>CHEN YONGJUN</creatorcontrib><creatorcontrib>ZHANG LIMING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAO BINGJING</au><au>SUN CHANG'AN</au><au>CHEN YONGJUN</au><au>ZHANG LIMING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Transition steel ring for ultra-large block type steel sleeve</title><date>2023-07-07</date><risdate>2023</risdate><abstract>The utility model relates to the technical field of tunnel construction, in particular to a transition steel ring for an ultra-large partitioned steel sleeve, which comprises steel ring scattered blocks, the steel ring scattered blocks are connected end to end to form a circular ring, the steel ring scattered blocks are connected with the steel sleeves, butt joint rings are arranged at the edges of the steel sleeves, and the steel ring scattered blocks are mounted on the butt joint rings at the two connected steel sleeves. When the steel sleeve is installed, a plurality of steel ring scattered blocks are installed at the connecting position of the steel sleeve, due to the fact that a fixing mechanism with good sealing performance is arranged, the middle of a movable plate can be moved only by rotating a twisting column, a positioning column is inserted into a positioning hole, stable installation can be achieved, operation is easy, and when the movable plate moves, an air storage bag is squeezed, and the safe</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN219316965UU |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Transition steel ring for ultra-large block type steel sleeve |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T11%3A09%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAO%20BINGJING&rft.date=2023-07-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219316965UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |