Liftable operation room and under-pressure workover rig

The liftable operation room comprises an operation room body, an installation platform, a lifting mechanism, an electric control mechanism, a hydraulic system and a fixed base, the operation room body is fixedly arranged on the installation platform, the bottom of the lifting mechanism is connected...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CAI ZHIQI, ZHANG PING, HAN YONGFENG, YU DONGFANG, ZHOU YULIN, ZHANG CHUNHUI, HE SHUAI, MENG DAWEI, YU XIAOTONG, WU TAO, CAO CHUANFU, GONG LIQIN, LI TAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator CAI ZHIQI
ZHANG PING
HAN YONGFENG
YU DONGFANG
ZHOU YULIN
ZHANG CHUNHUI
HE SHUAI
MENG DAWEI
YU XIAOTONG
WU TAO
CAO CHUANFU
GONG LIQIN
LI TAN
description The liftable operation room comprises an operation room body, an installation platform, a lifting mechanism, an electric control mechanism, a hydraulic system and a fixed base, the operation room body is fixedly arranged on the installation platform, the bottom of the lifting mechanism is connected to the fixed base, and the top of the lifting mechanism is connected to the installation platform; the electric control mechanism is fixedly arranged on the fixed base and comprises a hydraulic pump and a motor; the lifter forms a scissor structure; the electric control mechanism drives the lifting mechanism through the hydraulic system to achieve lifting of the operation room and the installation platform. The lifting operation room is arranged in the middle of the vehicle, when the vehicle is moved, the operation room descends to the lowest point and is fixed, and rising and falling of a derrick are not affected. During workover operation, the height of the table top of the operation room is increased through the
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219156455UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219156455UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219156455UU3</originalsourceid><addsrcrecordid>eNrjZDD3yUwrSUzKSVXIL0gtSizJzM9TKMrPz1VIzEtRKM1LSS3SLShKLS4uLUpVKM8vys4vSy1SKMpM52FgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RoaWhqZmJqamoaHGRCkCAF6HLyc</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Liftable operation room and under-pressure workover rig</title><source>esp@cenet</source><creator>CAI ZHIQI ; ZHANG PING ; HAN YONGFENG ; YU DONGFANG ; ZHOU YULIN ; ZHANG CHUNHUI ; HE SHUAI ; MENG DAWEI ; YU XIAOTONG ; WU TAO ; CAO CHUANFU ; GONG LIQIN ; LI TAN</creator><creatorcontrib>CAI ZHIQI ; ZHANG PING ; HAN YONGFENG ; YU DONGFANG ; ZHOU YULIN ; ZHANG CHUNHUI ; HE SHUAI ; MENG DAWEI ; YU XIAOTONG ; WU TAO ; CAO CHUANFU ; GONG LIQIN ; LI TAN</creatorcontrib><description>The liftable operation room comprises an operation room body, an installation platform, a lifting mechanism, an electric control mechanism, a hydraulic system and a fixed base, the operation room body is fixedly arranged on the installation platform, the bottom of the lifting mechanism is connected to the fixed base, and the top of the lifting mechanism is connected to the installation platform; the electric control mechanism is fixedly arranged on the fixed base and comprises a hydraulic pump and a motor; the lifter forms a scissor structure; the electric control mechanism drives the lifting mechanism through the hydraulic system to achieve lifting of the operation room and the installation platform. The lifting operation room is arranged in the middle of the vehicle, when the vehicle is moved, the operation room descends to the lowest point and is fixed, and rising and falling of a derrick are not affected. During workover operation, the height of the table top of the operation room is increased through the</description><language>chi ; eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; HAULING ; HOISTING ; HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD ; LIFTING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230609&amp;DB=EPODOC&amp;CC=CN&amp;NR=219156455U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230609&amp;DB=EPODOC&amp;CC=CN&amp;NR=219156455U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CAI ZHIQI</creatorcontrib><creatorcontrib>ZHANG PING</creatorcontrib><creatorcontrib>HAN YONGFENG</creatorcontrib><creatorcontrib>YU DONGFANG</creatorcontrib><creatorcontrib>ZHOU YULIN</creatorcontrib><creatorcontrib>ZHANG CHUNHUI</creatorcontrib><creatorcontrib>HE SHUAI</creatorcontrib><creatorcontrib>MENG DAWEI</creatorcontrib><creatorcontrib>YU XIAOTONG</creatorcontrib><creatorcontrib>WU TAO</creatorcontrib><creatorcontrib>CAO CHUANFU</creatorcontrib><creatorcontrib>GONG LIQIN</creatorcontrib><creatorcontrib>LI TAN</creatorcontrib><title>Liftable operation room and under-pressure workover rig</title><description>The liftable operation room comprises an operation room body, an installation platform, a lifting mechanism, an electric control mechanism, a hydraulic system and a fixed base, the operation room body is fixedly arranged on the installation platform, the bottom of the lifting mechanism is connected to the fixed base, and the top of the lifting mechanism is connected to the installation platform; the electric control mechanism is fixedly arranged on the fixed base and comprises a hydraulic pump and a motor; the lifter forms a scissor structure; the electric control mechanism drives the lifting mechanism through the hydraulic system to achieve lifting of the operation room and the installation platform. The lifting operation room is arranged in the middle of the vehicle, when the vehicle is moved, the operation room descends to the lowest point and is fixed, and rising and falling of a derrick are not affected. During workover operation, the height of the table top of the operation room is increased through the</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD</subject><subject>LIFTING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD3yUwrSUzKSVXIL0gtSizJzM9TKMrPz1VIzEtRKM1LSS3SLShKLS4uLUpVKM8vys4vSy1SKMpM52FgTUvMKU7lhdLcDEpuriHOHrqpBfnxqcUFicmpeakl8c5-RoaWhqZmJqamoaHGRCkCAF6HLyc</recordid><startdate>20230609</startdate><enddate>20230609</enddate><creator>CAI ZHIQI</creator><creator>ZHANG PING</creator><creator>HAN YONGFENG</creator><creator>YU DONGFANG</creator><creator>ZHOU YULIN</creator><creator>ZHANG CHUNHUI</creator><creator>HE SHUAI</creator><creator>MENG DAWEI</creator><creator>YU XIAOTONG</creator><creator>WU TAO</creator><creator>CAO CHUANFU</creator><creator>GONG LIQIN</creator><creator>LI TAN</creator><scope>EVB</scope></search><sort><creationdate>20230609</creationdate><title>Liftable operation room and under-pressure workover rig</title><author>CAI ZHIQI ; ZHANG PING ; HAN YONGFENG ; YU DONGFANG ; ZHOU YULIN ; ZHANG CHUNHUI ; HE SHUAI ; MENG DAWEI ; YU XIAOTONG ; WU TAO ; CAO CHUANFU ; GONG LIQIN ; LI TAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219156455UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD</topic><topic>LIFTING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>CAI ZHIQI</creatorcontrib><creatorcontrib>ZHANG PING</creatorcontrib><creatorcontrib>HAN YONGFENG</creatorcontrib><creatorcontrib>YU DONGFANG</creatorcontrib><creatorcontrib>ZHOU YULIN</creatorcontrib><creatorcontrib>ZHANG CHUNHUI</creatorcontrib><creatorcontrib>HE SHUAI</creatorcontrib><creatorcontrib>MENG DAWEI</creatorcontrib><creatorcontrib>YU XIAOTONG</creatorcontrib><creatorcontrib>WU TAO</creatorcontrib><creatorcontrib>CAO CHUANFU</creatorcontrib><creatorcontrib>GONG LIQIN</creatorcontrib><creatorcontrib>LI TAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CAI ZHIQI</au><au>ZHANG PING</au><au>HAN YONGFENG</au><au>YU DONGFANG</au><au>ZHOU YULIN</au><au>ZHANG CHUNHUI</au><au>HE SHUAI</au><au>MENG DAWEI</au><au>YU XIAOTONG</au><au>WU TAO</au><au>CAO CHUANFU</au><au>GONG LIQIN</au><au>LI TAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Liftable operation room and under-pressure workover rig</title><date>2023-06-09</date><risdate>2023</risdate><abstract>The liftable operation room comprises an operation room body, an installation platform, a lifting mechanism, an electric control mechanism, a hydraulic system and a fixed base, the operation room body is fixedly arranged on the installation platform, the bottom of the lifting mechanism is connected to the fixed base, and the top of the lifting mechanism is connected to the installation platform; the electric control mechanism is fixedly arranged on the fixed base and comprises a hydraulic pump and a motor; the lifter forms a scissor structure; the electric control mechanism drives the lifting mechanism through the hydraulic system to achieve lifting of the operation room and the installation platform. The lifting operation room is arranged in the middle of the vehicle, when the vehicle is moved, the operation room descends to the lowest point and is fixed, and rising and falling of a derrick are not affected. During workover operation, the height of the table top of the operation room is increased through the</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN219156455UU
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
HAULING
HOISTING
HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDEDFOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCEDIRECTLY TO THE SURFACE OF A LOAD
LIFTING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
PERFORMING OPERATIONS
TRANSPORTING
title Liftable operation room and under-pressure workover rig
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T17%3A15%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CAI%20ZHIQI&rft.date=2023-06-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219156455UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true