Enclosure structure in cement mixing pile construction process
The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and ever...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHANG TAO LIN SHUHONG LU YANG SHI YUXUAN CHEN JUN JIN SHAN HU XINGSEN |
description | The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219138591UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219138591UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219138591UU3</originalsourceid><addsrcrecordid>eNrjZLBzzUvOyS8uLUpVKC4pKk0uAbEy8xSSU3NT80oUcjMrMvPSFQoyc1IVkvPzIEoy8_MUCoryk1OLi3kYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GhpaGxhamlYWioMVGKACARMjs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Enclosure structure in cement mixing pile construction process</title><source>esp@cenet</source><creator>ZHANG TAO ; LIN SHUHONG ; LU YANG ; SHI YUXUAN ; CHEN JUN ; JIN SHAN ; HU XINGSEN</creator><creatorcontrib>ZHANG TAO ; LIN SHUHONG ; LU YANG ; SHI YUXUAN ; CHEN JUN ; JIN SHAN ; HU XINGSEN</creatorcontrib><description>The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the</description><language>chi ; eng</language><subject>ARTIFICIAL STONE ; BUILDING ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EMBANKMENTS ; EXCAVATIONS ; FENCING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; LIME, MAGNESIA ; MASTS ; METALLURGY ; PERFORMING OPERATIONS ; PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL ; REFRACTORIES ; SEPARATION ; SLAG ; SOIL SHIFTING ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; TRANSPORTING ; TREATMENT OF NATURAL STONE ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230606&DB=EPODOC&CC=CN&NR=219138591U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25568,76551</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230606&DB=EPODOC&CC=CN&NR=219138591U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG TAO</creatorcontrib><creatorcontrib>LIN SHUHONG</creatorcontrib><creatorcontrib>LU YANG</creatorcontrib><creatorcontrib>SHI YUXUAN</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><creatorcontrib>JIN SHAN</creatorcontrib><creatorcontrib>HU XINGSEN</creatorcontrib><title>Enclosure structure in cement mixing pile construction process</title><description>The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the</description><subject>ARTIFICIAL STONE</subject><subject>BUILDING</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LIME, MAGNESIA</subject><subject>MASTS</subject><subject>METALLURGY</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</subject><subject>REFRACTORIES</subject><subject>SEPARATION</subject><subject>SLAG</subject><subject>SOIL SHIFTING</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>TRANSPORTING</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBzzUvOyS8uLUpVKC4pKk0uAbEy8xSSU3NT80oUcjMrMvPSFQoyc1IVkvPzIEoy8_MUCoryk1OLi3kYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GhpaGxhamlYWioMVGKACARMjs</recordid><startdate>20230606</startdate><enddate>20230606</enddate><creator>ZHANG TAO</creator><creator>LIN SHUHONG</creator><creator>LU YANG</creator><creator>SHI YUXUAN</creator><creator>CHEN JUN</creator><creator>JIN SHAN</creator><creator>HU XINGSEN</creator><scope>EVB</scope></search><sort><creationdate>20230606</creationdate><title>Enclosure structure in cement mixing pile construction process</title><author>ZHANG TAO ; LIN SHUHONG ; LU YANG ; SHI YUXUAN ; CHEN JUN ; JIN SHAN ; HU XINGSEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219138591UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ARTIFICIAL STONE</topic><topic>BUILDING</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LIME, MAGNESIA</topic><topic>MASTS</topic><topic>METALLURGY</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</topic><topic>REFRACTORIES</topic><topic>SEPARATION</topic><topic>SLAG</topic><topic>SOIL SHIFTING</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>TRANSPORTING</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG TAO</creatorcontrib><creatorcontrib>LIN SHUHONG</creatorcontrib><creatorcontrib>LU YANG</creatorcontrib><creatorcontrib>SHI YUXUAN</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><creatorcontrib>JIN SHAN</creatorcontrib><creatorcontrib>HU XINGSEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG TAO</au><au>LIN SHUHONG</au><au>LU YANG</au><au>SHI YUXUAN</au><au>CHEN JUN</au><au>JIN SHAN</au><au>HU XINGSEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Enclosure structure in cement mixing pile construction process</title><date>2023-06-06</date><risdate>2023</risdate><abstract>The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN219138591UU |
source | esp@cenet |
subjects | ARTIFICIAL STONE BUILDING BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES CEMENTS CERAMICS CHEMISTRY COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS CONCRETE EMBANKMENTS EXCAVATIONS FENCING FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING LIME, MAGNESIA MASTS METALLURGY PERFORMING OPERATIONS PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL REFRACTORIES SEPARATION SLAG SOIL SHIFTING SWIMMING OR SPLASH BATHS OR POOLS TENTS OR CANOPIES, IN GENERAL TRANSPORTING TREATMENT OF NATURAL STONE UNDERGROUND OR UNDERWATER STRUCTURES |
title | Enclosure structure in cement mixing pile construction process |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-17T05%3A45%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20TAO&rft.date=2023-06-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219138591UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |