Enclosure structure in cement mixing pile construction process

The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and ever...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG TAO, LIN SHUHONG, LU YANG, SHI YUXUAN, CHEN JUN, JIN SHAN, HU XINGSEN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ZHANG TAO
LIN SHUHONG
LU YANG
SHI YUXUAN
CHEN JUN
JIN SHAN
HU XINGSEN
description The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219138591UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219138591UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219138591UU3</originalsourceid><addsrcrecordid>eNrjZLBzzUvOyS8uLUpVKC4pKk0uAbEy8xSSU3NT80oUcjMrMvPSFQoyc1IVkvPzIEoy8_MUCoryk1OLi3kYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GhpaGxhamlYWioMVGKACARMjs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Enclosure structure in cement mixing pile construction process</title><source>esp@cenet</source><creator>ZHANG TAO ; LIN SHUHONG ; LU YANG ; SHI YUXUAN ; CHEN JUN ; JIN SHAN ; HU XINGSEN</creator><creatorcontrib>ZHANG TAO ; LIN SHUHONG ; LU YANG ; SHI YUXUAN ; CHEN JUN ; JIN SHAN ; HU XINGSEN</creatorcontrib><description>The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the</description><language>chi ; eng</language><subject>ARTIFICIAL STONE ; BUILDING ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CEMENTS ; CERAMICS ; CHEMISTRY ; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS ; CONCRETE ; EMBANKMENTS ; EXCAVATIONS ; FENCING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; LIME, MAGNESIA ; MASTS ; METALLURGY ; PERFORMING OPERATIONS ; PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL ; REFRACTORIES ; SEPARATION ; SLAG ; SOIL SHIFTING ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; TRANSPORTING ; TREATMENT OF NATURAL STONE ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230606&amp;DB=EPODOC&amp;CC=CN&amp;NR=219138591U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,781,886,25568,76551</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230606&amp;DB=EPODOC&amp;CC=CN&amp;NR=219138591U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHANG TAO</creatorcontrib><creatorcontrib>LIN SHUHONG</creatorcontrib><creatorcontrib>LU YANG</creatorcontrib><creatorcontrib>SHI YUXUAN</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><creatorcontrib>JIN SHAN</creatorcontrib><creatorcontrib>HU XINGSEN</creatorcontrib><title>Enclosure structure in cement mixing pile construction process</title><description>The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the</description><subject>ARTIFICIAL STONE</subject><subject>BUILDING</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CEMENTS</subject><subject>CERAMICS</subject><subject>CHEMISTRY</subject><subject>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</subject><subject>CONCRETE</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LIME, MAGNESIA</subject><subject>MASTS</subject><subject>METALLURGY</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</subject><subject>REFRACTORIES</subject><subject>SEPARATION</subject><subject>SLAG</subject><subject>SOIL SHIFTING</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>TRANSPORTING</subject><subject>TREATMENT OF NATURAL STONE</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBzzUvOyS8uLUpVKC4pKk0uAbEy8xSSU3NT80oUcjMrMvPSFQoyc1IVkvPzIEoy8_MUCoryk1OLi3kYWNMSc4pTeaE0N4OSm2uIs4duakF-fGpxQWJyal5qSbyzn5GhpaGxhamlYWioMVGKACARMjs</recordid><startdate>20230606</startdate><enddate>20230606</enddate><creator>ZHANG TAO</creator><creator>LIN SHUHONG</creator><creator>LU YANG</creator><creator>SHI YUXUAN</creator><creator>CHEN JUN</creator><creator>JIN SHAN</creator><creator>HU XINGSEN</creator><scope>EVB</scope></search><sort><creationdate>20230606</creationdate><title>Enclosure structure in cement mixing pile construction process</title><author>ZHANG TAO ; LIN SHUHONG ; LU YANG ; SHI YUXUAN ; CHEN JUN ; JIN SHAN ; HU XINGSEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219138591UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ARTIFICIAL STONE</topic><topic>BUILDING</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CEMENTS</topic><topic>CERAMICS</topic><topic>CHEMISTRY</topic><topic>COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS</topic><topic>CONCRETE</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LIME, MAGNESIA</topic><topic>MASTS</topic><topic>METALLURGY</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</topic><topic>REFRACTORIES</topic><topic>SEPARATION</topic><topic>SLAG</topic><topic>SOIL SHIFTING</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>TRANSPORTING</topic><topic>TREATMENT OF NATURAL STONE</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHANG TAO</creatorcontrib><creatorcontrib>LIN SHUHONG</creatorcontrib><creatorcontrib>LU YANG</creatorcontrib><creatorcontrib>SHI YUXUAN</creatorcontrib><creatorcontrib>CHEN JUN</creatorcontrib><creatorcontrib>JIN SHAN</creatorcontrib><creatorcontrib>HU XINGSEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHANG TAO</au><au>LIN SHUHONG</au><au>LU YANG</au><au>SHI YUXUAN</au><au>CHEN JUN</au><au>JIN SHAN</au><au>HU XINGSEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Enclosure structure in cement mixing pile construction process</title><date>2023-06-06</date><risdate>2023</risdate><abstract>The utility model discloses an enclosure structure in a cement mixing pile construction process, which is characterized in that the enclosure structure is provided with a plurality of vertical supporting structures which are arranged around a cement mixing pile along the vertical direction, and every two adjacent vertical supporting structures are connected through a horizontal supporting rod. According to the device, a connecting frame and a horizontal connecting rod are pulled to rotate and stretch with a fixing rod as the axis, a supporting leg mechanism is pulled to support a vertical supporting structure, a rocker and a turbine rod are screwed to drive a moving block and supporting legs fixedly installed below the moving block to move downwards, a spraying mechanism sprays water, and a connecting pipe is connected with a water tank. When work is stopped or construction cannot be carried out at night, the spray head sprays mist liquid to cement, in this way, the cement is prevented from volatilizing, the</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN219138591UU
source esp@cenet
subjects ARTIFICIAL STONE
BUILDING
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
CEMENTS
CERAMICS
CHEMISTRY
COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDINGMATERIALS
CONCRETE
EMBANKMENTS
EXCAVATIONS
FENCING
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
LIME, MAGNESIA
MASTS
METALLURGY
PERFORMING OPERATIONS
PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
REFRACTORIES
SEPARATION
SLAG
SOIL SHIFTING
SWIMMING OR SPLASH BATHS OR POOLS
TENTS OR CANOPIES, IN GENERAL
TRANSPORTING
TREATMENT OF NATURAL STONE
UNDERGROUND OR UNDERWATER STRUCTURES
title Enclosure structure in cement mixing pile construction process
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-17T05%3A45%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHANG%20TAO&rft.date=2023-06-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219138591UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true