Temporary guardrail mechanism for municipal building construction
The temporary guardrail mechanism for municipal building construction comprises a plurality of stand columns, a first protruding block and a second protruding block are arranged on the two side walls of each stand column respectively, a first inserting groove is formed in the side wall of each first...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LUO ZHUHE WANG RENZHONG GAO KAIRONG LI XIULI |
description | The temporary guardrail mechanism for municipal building construction comprises a plurality of stand columns, a first protruding block and a second protruding block are arranged on the two side walls of each stand column respectively, a first inserting groove is formed in the side wall of each first protruding block, and a second inserting groove is formed in the side wall of each second protruding block. A first fixing beam and a second fixing beam are arranged between the two stand columns, first plugs are arranged at the two ends of the first fixing beam and inserted into the first inserting grooves, and second plugs are arranged at the two ends of the second fixing beam and inserted into the second inserting grooves. A plurality of second storage grooves are formed in the bottom of the first fixing beam, protective rods are rotatably connected to the inner walls of the second storage grooves, the protective rods are arranged in a telescopic mode, a plurality of evenly-formed third inserting grooves are fo |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN219138445UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN219138445UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN219138445UU3</originalsourceid><addsrcrecordid>eNrjZHAMSc0tyC9KLKpUSC9NLEopSszMUchNTc5IzMsszlVIyy9SyC3Ny0zOLEjMUUgqzcxJycxLV0jOzysuKSpNLsnMz-NhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGlobGFiYmpqGhxkQpAgDfDjN7</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Temporary guardrail mechanism for municipal building construction</title><source>esp@cenet</source><creator>LUO ZHUHE ; WANG RENZHONG ; GAO KAIRONG ; LI XIULI</creator><creatorcontrib>LUO ZHUHE ; WANG RENZHONG ; GAO KAIRONG ; LI XIULI</creatorcontrib><description>The temporary guardrail mechanism for municipal building construction comprises a plurality of stand columns, a first protruding block and a second protruding block are arranged on the two side walls of each stand column respectively, a first inserting groove is formed in the side wall of each first protruding block, and a second inserting groove is formed in the side wall of each second protruding block. A first fixing beam and a second fixing beam are arranged between the two stand columns, first plugs are arranged at the two ends of the first fixing beam and inserted into the first inserting grooves, and second plugs are arranged at the two ends of the second fixing beam and inserted into the second inserting grooves. A plurality of second storage grooves are formed in the bottom of the first fixing beam, protective rods are rotatably connected to the inner walls of the second storage grooves, the protective rods are arranged in a telescopic mode, a plurality of evenly-formed third inserting grooves are fo</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230606&DB=EPODOC&CC=CN&NR=219138445U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230606&DB=EPODOC&CC=CN&NR=219138445U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LUO ZHUHE</creatorcontrib><creatorcontrib>WANG RENZHONG</creatorcontrib><creatorcontrib>GAO KAIRONG</creatorcontrib><creatorcontrib>LI XIULI</creatorcontrib><title>Temporary guardrail mechanism for municipal building construction</title><description>The temporary guardrail mechanism for municipal building construction comprises a plurality of stand columns, a first protruding block and a second protruding block are arranged on the two side walls of each stand column respectively, a first inserting groove is formed in the side wall of each first protruding block, and a second inserting groove is formed in the side wall of each second protruding block. A first fixing beam and a second fixing beam are arranged between the two stand columns, first plugs are arranged at the two ends of the first fixing beam and inserted into the first inserting grooves, and second plugs are arranged at the two ends of the second fixing beam and inserted into the second inserting grooves. A plurality of second storage grooves are formed in the bottom of the first fixing beam, protective rods are rotatably connected to the inner walls of the second storage grooves, the protective rods are arranged in a telescopic mode, a plurality of evenly-formed third inserting grooves are fo</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAMSc0tyC9KLKpUSC9NLEopSszMUchNTc5IzMsszlVIyy9SyC3Ny0zOLEjMUUgqzcxJycxLV0jOzysuKSpNLsnMz-NhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGlobGFiYmpqGhxkQpAgDfDjN7</recordid><startdate>20230606</startdate><enddate>20230606</enddate><creator>LUO ZHUHE</creator><creator>WANG RENZHONG</creator><creator>GAO KAIRONG</creator><creator>LI XIULI</creator><scope>EVB</scope></search><sort><creationdate>20230606</creationdate><title>Temporary guardrail mechanism for municipal building construction</title><author>LUO ZHUHE ; WANG RENZHONG ; GAO KAIRONG ; LI XIULI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN219138445UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>LUO ZHUHE</creatorcontrib><creatorcontrib>WANG RENZHONG</creatorcontrib><creatorcontrib>GAO KAIRONG</creatorcontrib><creatorcontrib>LI XIULI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LUO ZHUHE</au><au>WANG RENZHONG</au><au>GAO KAIRONG</au><au>LI XIULI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Temporary guardrail mechanism for municipal building construction</title><date>2023-06-06</date><risdate>2023</risdate><abstract>The temporary guardrail mechanism for municipal building construction comprises a plurality of stand columns, a first protruding block and a second protruding block are arranged on the two side walls of each stand column respectively, a first inserting groove is formed in the side wall of each first protruding block, and a second inserting groove is formed in the side wall of each second protruding block. A first fixing beam and a second fixing beam are arranged between the two stand columns, first plugs are arranged at the two ends of the first fixing beam and inserted into the first inserting grooves, and second plugs are arranged at the two ends of the second fixing beam and inserted into the second inserting grooves. A plurality of second storage grooves are formed in the bottom of the first fixing beam, protective rods are rotatably connected to the inner walls of the second storage grooves, the protective rods are arranged in a telescopic mode, a plurality of evenly-formed third inserting grooves are fo</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN219138445UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Temporary guardrail mechanism for municipal building construction |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T17%3A17%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LUO%20ZHUHE&rft.date=2023-06-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN219138445UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |