Installation device of pre-stressed anchor rod and operation arm of anchor rod trolley
The utility model discloses an installation device of a pre-stressed anchor rod and an operation arm of an anchor rod trolley, the installation device of the pre-stressed anchor rod comprises a rod body with external threads and a fastening nut sleeved on the rod body in a penetrating mode, and the...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WU HANGTONG GUO CHENQIANG ZHOU BIN ZHAO JINGLI |
description | The utility model discloses an installation device of a pre-stressed anchor rod and an operation arm of an anchor rod trolley, the installation device of the pre-stressed anchor rod comprises a rod body with external threads and a fastening nut sleeved on the rod body in a penetrating mode, and the installation device of the pre-stressed anchor rod comprises a nut locking assembly and a rod body tensioning assembly. The nut locking assembly comprises a locking element and a first power mechanism, wherein the locking element is used for being connected with the fastening nut and provided with a rotating axis, the first power mechanism drives the locking element to rotate so as to lock the fastening nut, and the locking element is provided with a connecting part connected with the fastening nut in a sleeving mode. The rod body tensioning assembly comprises a tensioning element and a second power mechanism, the tensioning element penetrates into the locking element along the rotating axis and is used for being c |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN218991646UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN218991646UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN218991646UU3</originalsourceid><addsrcrecordid>eNrjZAjzzCsuSczJSSzJzM9TSEkty0xOVchPUygoStUtLilKLS5OTVFIzEvOyC9SKMoHMVMU8gtSiyDqE4tyQYqR5EuK8nNyUit5GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RoYWlpaGZiVloqDFRigCV_jpp</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Installation device of pre-stressed anchor rod and operation arm of anchor rod trolley</title><source>esp@cenet</source><creator>WU HANGTONG ; GUO CHENQIANG ; ZHOU BIN ; ZHAO JINGLI</creator><creatorcontrib>WU HANGTONG ; GUO CHENQIANG ; ZHOU BIN ; ZHAO JINGLI</creatorcontrib><description>The utility model discloses an installation device of a pre-stressed anchor rod and an operation arm of an anchor rod trolley, the installation device of the pre-stressed anchor rod comprises a rod body with external threads and a fastening nut sleeved on the rod body in a penetrating mode, and the installation device of the pre-stressed anchor rod comprises a nut locking assembly and a rod body tensioning assembly. The nut locking assembly comprises a locking element and a first power mechanism, wherein the locking element is used for being connected with the fastening nut and provided with a rotating axis, the first power mechanism drives the locking element to rotate so as to lock the fastening nut, and the locking element is provided with a connecting part connected with the fastening nut in a sleeving mode. The rod body tensioning assembly comprises a tensioning element and a second power mechanism, the tensioning element penetrates into the locking element along the rotating axis and is used for being c</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230509&DB=EPODOC&CC=CN&NR=218991646U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,309,782,887,25571,76555</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230509&DB=EPODOC&CC=CN&NR=218991646U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU HANGTONG</creatorcontrib><creatorcontrib>GUO CHENQIANG</creatorcontrib><creatorcontrib>ZHOU BIN</creatorcontrib><creatorcontrib>ZHAO JINGLI</creatorcontrib><title>Installation device of pre-stressed anchor rod and operation arm of anchor rod trolley</title><description>The utility model discloses an installation device of a pre-stressed anchor rod and an operation arm of an anchor rod trolley, the installation device of the pre-stressed anchor rod comprises a rod body with external threads and a fastening nut sleeved on the rod body in a penetrating mode, and the installation device of the pre-stressed anchor rod comprises a nut locking assembly and a rod body tensioning assembly. The nut locking assembly comprises a locking element and a first power mechanism, wherein the locking element is used for being connected with the fastening nut and provided with a rotating axis, the first power mechanism drives the locking element to rotate so as to lock the fastening nut, and the locking element is provided with a connecting part connected with the fastening nut in a sleeving mode. The rod body tensioning assembly comprises a tensioning element and a second power mechanism, the tensioning element penetrates into the locking element along the rotating axis and is used for being c</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAjzzCsuSczJSSzJzM9TSEkty0xOVchPUygoStUtLilKLS5OTVFIzEvOyC9SKMoHMVMU8gtSiyDqE4tyQYqR5EuK8nNyUit5GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RoYWlpaGZiVloqDFRigCV_jpp</recordid><startdate>20230509</startdate><enddate>20230509</enddate><creator>WU HANGTONG</creator><creator>GUO CHENQIANG</creator><creator>ZHOU BIN</creator><creator>ZHAO JINGLI</creator><scope>EVB</scope></search><sort><creationdate>20230509</creationdate><title>Installation device of pre-stressed anchor rod and operation arm of anchor rod trolley</title><author>WU HANGTONG ; GUO CHENQIANG ; ZHOU BIN ; ZHAO JINGLI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN218991646UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>WU HANGTONG</creatorcontrib><creatorcontrib>GUO CHENQIANG</creatorcontrib><creatorcontrib>ZHOU BIN</creatorcontrib><creatorcontrib>ZHAO JINGLI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU HANGTONG</au><au>GUO CHENQIANG</au><au>ZHOU BIN</au><au>ZHAO JINGLI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Installation device of pre-stressed anchor rod and operation arm of anchor rod trolley</title><date>2023-05-09</date><risdate>2023</risdate><abstract>The utility model discloses an installation device of a pre-stressed anchor rod and an operation arm of an anchor rod trolley, the installation device of the pre-stressed anchor rod comprises a rod body with external threads and a fastening nut sleeved on the rod body in a penetrating mode, and the installation device of the pre-stressed anchor rod comprises a nut locking assembly and a rod body tensioning assembly. The nut locking assembly comprises a locking element and a first power mechanism, wherein the locking element is used for being connected with the fastening nut and provided with a rotating axis, the first power mechanism drives the locking element to rotate so as to lock the fastening nut, and the locking element is provided with a connecting part connected with the fastening nut in a sleeving mode. The rod body tensioning assembly comprises a tensioning element and a second power mechanism, the tensioning element penetrates into the locking element along the rotating axis and is used for being c</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN218991646UU |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | Installation device of pre-stressed anchor rod and operation arm of anchor rod trolley |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-04T19%3A05%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20HANGTONG&rft.date=2023-05-09&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN218991646UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |