Temporary pier for bridge building construction

The utility model discloses a temporary pier for bridge building construction, which relates to the technical field of bridge building and comprises a base and a sleeve rod provided with a top plate, support rods are symmetrically and fixedly mounted on the upper surface of the base, the support rod...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: BU QINGJIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator BU QINGJIANG
description The utility model discloses a temporary pier for bridge building construction, which relates to the technical field of bridge building and comprises a base and a sleeve rod provided with a top plate, support rods are symmetrically and fixedly mounted on the upper surface of the base, the support rods and the sleeve rod are mounted in a sliding manner, and a piston is fixedly mounted at one end, far away from the base, of each support rod. A sealing gasket is fixedly mounted on the lower surface of the top plate, a mounting plate is fixedly mounted in the middle of the outer wall of the sleeve rod, an air compressor is fixedly mounted on the upper surface of the mounting plate, output pipes are symmetrically and fixedly mounted on the outer wall of the air compressor, and air pipes are symmetrically and fixedly mounted on the outer wall, close to the output pipes, of the sleeve rod. According to the device, the air compressor is arranged, sliding between the sleeve rod and the supporting rod is convenient, goo
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN218932882UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN218932882UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN218932882UU3</originalsourceid><addsrcrecordid>eNrjZNAPSc0tyC9KLKpUKMhMLVJIyy9SSCrKTElPVUgqzcxJycxLV0jOzysuKSpNLsnMz-NhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGFpbGRhYWRqGhxkQpAgC2OyxA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Temporary pier for bridge building construction</title><source>esp@cenet</source><creator>BU QINGJIANG</creator><creatorcontrib>BU QINGJIANG</creatorcontrib><description>The utility model discloses a temporary pier for bridge building construction, which relates to the technical field of bridge building and comprises a base and a sleeve rod provided with a top plate, support rods are symmetrically and fixedly mounted on the upper surface of the base, the support rods and the sleeve rod are mounted in a sliding manner, and a piston is fixedly mounted at one end, far away from the base, of each support rod. A sealing gasket is fixedly mounted on the lower surface of the top plate, a mounting plate is fixedly mounted in the middle of the outer wall of the sleeve rod, an air compressor is fixedly mounted on the upper surface of the mounting plate, output pipes are symmetrically and fixedly mounted on the outer wall of the air compressor, and air pipes are symmetrically and fixedly mounted on the outer wall, close to the output pipes, of the sleeve rod. According to the device, the air compressor is arranged, sliding between the sleeve rod and the supporting rod is convenient, goo</description><language>chi ; eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230428&amp;DB=EPODOC&amp;CC=CN&amp;NR=218932882U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20230428&amp;DB=EPODOC&amp;CC=CN&amp;NR=218932882U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BU QINGJIANG</creatorcontrib><title>Temporary pier for bridge building construction</title><description>The utility model discloses a temporary pier for bridge building construction, which relates to the technical field of bridge building and comprises a base and a sleeve rod provided with a top plate, support rods are symmetrically and fixedly mounted on the upper surface of the base, the support rods and the sleeve rod are mounted in a sliding manner, and a piston is fixedly mounted at one end, far away from the base, of each support rod. A sealing gasket is fixedly mounted on the lower surface of the top plate, a mounting plate is fixedly mounted in the middle of the outer wall of the sleeve rod, an air compressor is fixedly mounted on the upper surface of the mounting plate, output pipes are symmetrically and fixedly mounted on the outer wall of the air compressor, and air pipes are symmetrically and fixedly mounted on the outer wall, close to the output pipes, of the sleeve rod. According to the device, the air compressor is arranged, sliding between the sleeve rod and the supporting rod is convenient, goo</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAPSc0tyC9KLKpUKMhMLVJIyy9SSCrKTElPVUgqzcxJycxLV0jOzysuKSpNLsnMz-NhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfHOfkaGFpbGRhYWRqGhxkQpAgC2OyxA</recordid><startdate>20230428</startdate><enddate>20230428</enddate><creator>BU QINGJIANG</creator><scope>EVB</scope></search><sort><creationdate>20230428</creationdate><title>Temporary pier for bridge building construction</title><author>BU QINGJIANG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN218932882UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>BU QINGJIANG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BU QINGJIANG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Temporary pier for bridge building construction</title><date>2023-04-28</date><risdate>2023</risdate><abstract>The utility model discloses a temporary pier for bridge building construction, which relates to the technical field of bridge building and comprises a base and a sleeve rod provided with a top plate, support rods are symmetrically and fixedly mounted on the upper surface of the base, the support rods and the sleeve rod are mounted in a sliding manner, and a piston is fixedly mounted at one end, far away from the base, of each support rod. A sealing gasket is fixedly mounted on the lower surface of the top plate, a mounting plate is fixedly mounted in the middle of the outer wall of the sleeve rod, an air compressor is fixedly mounted on the upper surface of the mounting plate, output pipes are symmetrically and fixedly mounted on the outer wall of the air compressor, and air pipes are symmetrically and fixedly mounted on the outer wall, close to the output pipes, of the sleeve rod. According to the device, the air compressor is arranged, sliding between the sleeve rod and the supporting rod is convenient, goo</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN218932882UU
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title Temporary pier for bridge building construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T10%3A47%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BU%20QINGJIANG&rft.date=2023-04-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN218932882UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true