Constructional column horn mouth pouring tool
The utility model relates to a pouring tool for a horn mouth of a constructional column. When a constructional column is poured, construction is affected due to obstruction of an output port of a filling pump when a horn mouth is sealed. The utility model provides a constructional column horn mouth...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | LI QIANJUN WANG DEZHI ZHANG SHUAIYA ZHANG QINGSHAN ZHANG WENBO |
description | The utility model relates to a pouring tool for a horn mouth of a constructional column. When a constructional column is poured, construction is affected due to obstruction of an output port of a filling pump when a horn mouth is sealed. The utility model provides a constructional column horn mouth pouring tool which comprises a horn mouth, a pouring funnel is arranged above the horn mouth, and the pouring funnel comprises a funnel opening and a pouring pipeline arranged at the lower end of the funnel opening and communicated with the funnel opening. The funnel opening is connected with a first hinge rod set, the pouring pipeline is connected with a second hinge rod set, the other end of the first hinge rod set and the other end of the second hinge rod set are both fixed to the portion, at the lower end of the horn mouth, of the side wall, and the other end of the second hinge rod set is located above the other end of the first hinge rod set. When concrete is poured, the output port of the filling pump can be |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN218758821UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN218758821UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN218758821UU3</originalsourceid><addsrcrecordid>eNrjZNB1zs8rLikqTS7JzM9LzFFIzs8pzc1TyMgvylPIzS8tyVAoyC8tysxLVyjJz8_hYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhhbmphYWRoahocZEKQIAa1UrqA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Constructional column horn mouth pouring tool</title><source>esp@cenet</source><creator>LI QIANJUN ; WANG DEZHI ; ZHANG SHUAIYA ; ZHANG QINGSHAN ; ZHANG WENBO</creator><creatorcontrib>LI QIANJUN ; WANG DEZHI ; ZHANG SHUAIYA ; ZHANG QINGSHAN ; ZHANG WENBO</creatorcontrib><description>The utility model relates to a pouring tool for a horn mouth of a constructional column. When a constructional column is poured, construction is affected due to obstruction of an output port of a filling pump when a horn mouth is sealed. The utility model provides a constructional column horn mouth pouring tool which comprises a horn mouth, a pouring funnel is arranged above the horn mouth, and the pouring funnel comprises a funnel opening and a pouring pipeline arranged at the lower end of the funnel opening and communicated with the funnel opening. The funnel opening is connected with a first hinge rod set, the pouring pipeline is connected with a second hinge rod set, the other end of the first hinge rod set and the other end of the second hinge rod set are both fixed to the portion, at the lower end of the horn mouth, of the side wall, and the other end of the second hinge rod set is located above the other end of the first hinge rod set. When concrete is poured, the output port of the filling pump can be</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230328&DB=EPODOC&CC=CN&NR=218758821U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230328&DB=EPODOC&CC=CN&NR=218758821U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI QIANJUN</creatorcontrib><creatorcontrib>WANG DEZHI</creatorcontrib><creatorcontrib>ZHANG SHUAIYA</creatorcontrib><creatorcontrib>ZHANG QINGSHAN</creatorcontrib><creatorcontrib>ZHANG WENBO</creatorcontrib><title>Constructional column horn mouth pouring tool</title><description>The utility model relates to a pouring tool for a horn mouth of a constructional column. When a constructional column is poured, construction is affected due to obstruction of an output port of a filling pump when a horn mouth is sealed. The utility model provides a constructional column horn mouth pouring tool which comprises a horn mouth, a pouring funnel is arranged above the horn mouth, and the pouring funnel comprises a funnel opening and a pouring pipeline arranged at the lower end of the funnel opening and communicated with the funnel opening. The funnel opening is connected with a first hinge rod set, the pouring pipeline is connected with a second hinge rod set, the other end of the first hinge rod set and the other end of the second hinge rod set are both fixed to the portion, at the lower end of the horn mouth, of the side wall, and the other end of the second hinge rod set is located above the other end of the first hinge rod set. When concrete is poured, the output port of the filling pump can be</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNB1zs8rLikqTS7JzM9LzFFIzs8pzc1TyMgvylPIzS8tyVAoyC8tysxLVyjJz8_hYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhhbmphYWRoahocZEKQIAa1UrqA</recordid><startdate>20230328</startdate><enddate>20230328</enddate><creator>LI QIANJUN</creator><creator>WANG DEZHI</creator><creator>ZHANG SHUAIYA</creator><creator>ZHANG QINGSHAN</creator><creator>ZHANG WENBO</creator><scope>EVB</scope></search><sort><creationdate>20230328</creationdate><title>Constructional column horn mouth pouring tool</title><author>LI QIANJUN ; WANG DEZHI ; ZHANG SHUAIYA ; ZHANG QINGSHAN ; ZHANG WENBO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN218758821UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>LI QIANJUN</creatorcontrib><creatorcontrib>WANG DEZHI</creatorcontrib><creatorcontrib>ZHANG SHUAIYA</creatorcontrib><creatorcontrib>ZHANG QINGSHAN</creatorcontrib><creatorcontrib>ZHANG WENBO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI QIANJUN</au><au>WANG DEZHI</au><au>ZHANG SHUAIYA</au><au>ZHANG QINGSHAN</au><au>ZHANG WENBO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Constructional column horn mouth pouring tool</title><date>2023-03-28</date><risdate>2023</risdate><abstract>The utility model relates to a pouring tool for a horn mouth of a constructional column. When a constructional column is poured, construction is affected due to obstruction of an output port of a filling pump when a horn mouth is sealed. The utility model provides a constructional column horn mouth pouring tool which comprises a horn mouth, a pouring funnel is arranged above the horn mouth, and the pouring funnel comprises a funnel opening and a pouring pipeline arranged at the lower end of the funnel opening and communicated with the funnel opening. The funnel opening is connected with a first hinge rod set, the pouring pipeline is connected with a second hinge rod set, the other end of the first hinge rod set and the other end of the second hinge rod set are both fixed to the portion, at the lower end of the horn mouth, of the side wall, and the other end of the second hinge rod set is located above the other end of the first hinge rod set. When concrete is poured, the output port of the filling pump can be</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN218758821UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Constructional column horn mouth pouring tool |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-05T10%3A01%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20QIANJUN&rft.date=2023-03-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN218758821UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |