Material transportation system in construction process of semi-underground powerhouse of hybrid pumped storage power station
The utility model relates to a material transportation system in the construction process of a semi-underground powerhouse of a hybrid pumped storage power station. The method is suitable for the technical field of construction of semi-underground power plants in water conservancy and hydropower eng...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WU ZHI HU XIAOYU LI CONG'AN ZHAO LINWEI ZHANG HUA ZENG JIANPING |
description | The utility model relates to a material transportation system in the construction process of a semi-underground powerhouse of a hybrid pumped storage power station. The method is suitable for the technical field of construction of semi-underground power plants in water conservancy and hydropower engineering. According to the technical scheme, the material transportation system used in the construction process of the semi-underground powerhouse of the mixed pumped storage power station is used for transporting slag materials outwards in the earthwork excavation process of the semi-underground powerhouse and transporting concrete into the semi-underground powerhouse when concrete pouring is conducted on the semi-underground powerhouse. The semi-underground powerhouse is arranged at the bottom of a gully, and the semi-underground powerhouse is characterized in that slag discharging and discharging platforms in the trend direction of the gully are excavated on the two sides of the bottom of the gully where the se |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN218668593UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN218668593UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN218668593UU3</originalsourceid><addsrcrecordid>eNqNjbEOgkAQRGksjPoPG3sKJRKsicZGK6nJCQtcAreX3b0YEj9eRD_AajJvXjLL6HU1imxND8rGiSdWo5YcyCiKA1gHFTlRDtWMPVOFIkANCA42Dq5GbpmmBE9P5I6C4GfuxgfbCYbBYw2ixKbFrzO1-WQdLRrTC25-uYq259M9v8ToqUTxpkKHWua3_S5L0-xwTIoi-Ut6A8UISqg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Material transportation system in construction process of semi-underground powerhouse of hybrid pumped storage power station</title><source>esp@cenet</source><creator>WU ZHI ; HU XIAOYU ; LI CONG'AN ; ZHAO LINWEI ; ZHANG HUA ; ZENG JIANPING</creator><creatorcontrib>WU ZHI ; HU XIAOYU ; LI CONG'AN ; ZHAO LINWEI ; ZHANG HUA ; ZENG JIANPING</creatorcontrib><description>The utility model relates to a material transportation system in the construction process of a semi-underground powerhouse of a hybrid pumped storage power station. The method is suitable for the technical field of construction of semi-underground power plants in water conservancy and hydropower engineering. According to the technical scheme, the material transportation system used in the construction process of the semi-underground powerhouse of the mixed pumped storage power station is used for transporting slag materials outwards in the earthwork excavation process of the semi-underground powerhouse and transporting concrete into the semi-underground powerhouse when concrete pouring is conducted on the semi-underground powerhouse. The semi-underground powerhouse is arranged at the bottom of a gully, and the semi-underground powerhouse is characterized in that slag discharging and discharging platforms in the trend direction of the gully are excavated on the two sides of the bottom of the gully where the se</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FORMS ; FOUNDATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HYDRAULIC ENGINEERING ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230321&DB=EPODOC&CC=CN&NR=218668593U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230321&DB=EPODOC&CC=CN&NR=218668593U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU ZHI</creatorcontrib><creatorcontrib>HU XIAOYU</creatorcontrib><creatorcontrib>LI CONG'AN</creatorcontrib><creatorcontrib>ZHAO LINWEI</creatorcontrib><creatorcontrib>ZHANG HUA</creatorcontrib><creatorcontrib>ZENG JIANPING</creatorcontrib><title>Material transportation system in construction process of semi-underground powerhouse of hybrid pumped storage power station</title><description>The utility model relates to a material transportation system in the construction process of a semi-underground powerhouse of a hybrid pumped storage power station. The method is suitable for the technical field of construction of semi-underground power plants in water conservancy and hydropower engineering. According to the technical scheme, the material transportation system used in the construction process of the semi-underground powerhouse of the mixed pumped storage power station is used for transporting slag materials outwards in the earthwork excavation process of the semi-underground powerhouse and transporting concrete into the semi-underground powerhouse when concrete pouring is conducted on the semi-underground powerhouse. The semi-underground powerhouse is arranged at the bottom of a gully, and the semi-underground powerhouse is characterized in that slag discharging and discharging platforms in the trend direction of the gully are excavated on the two sides of the bottom of the gully where the se</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>FOUNDATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HYDRAULIC ENGINEERING</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjbEOgkAQRGksjPoPG3sKJRKsicZGK6nJCQtcAreX3b0YEj9eRD_AajJvXjLL6HU1imxND8rGiSdWo5YcyCiKA1gHFTlRDtWMPVOFIkANCA42Dq5GbpmmBE9P5I6C4GfuxgfbCYbBYw2ixKbFrzO1-WQdLRrTC25-uYq259M9v8ToqUTxpkKHWua3_S5L0-xwTIoi-Ut6A8UISqg</recordid><startdate>20230321</startdate><enddate>20230321</enddate><creator>WU ZHI</creator><creator>HU XIAOYU</creator><creator>LI CONG'AN</creator><creator>ZHAO LINWEI</creator><creator>ZHANG HUA</creator><creator>ZENG JIANPING</creator><scope>EVB</scope></search><sort><creationdate>20230321</creationdate><title>Material transportation system in construction process of semi-underground powerhouse of hybrid pumped storage power station</title><author>WU ZHI ; HU XIAOYU ; LI CONG'AN ; ZHAO LINWEI ; ZHANG HUA ; ZENG JIANPING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN218668593UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>FOUNDATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HYDRAULIC ENGINEERING</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>WU ZHI</creatorcontrib><creatorcontrib>HU XIAOYU</creatorcontrib><creatorcontrib>LI CONG'AN</creatorcontrib><creatorcontrib>ZHAO LINWEI</creatorcontrib><creatorcontrib>ZHANG HUA</creatorcontrib><creatorcontrib>ZENG JIANPING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU ZHI</au><au>HU XIAOYU</au><au>LI CONG'AN</au><au>ZHAO LINWEI</au><au>ZHANG HUA</au><au>ZENG JIANPING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Material transportation system in construction process of semi-underground powerhouse of hybrid pumped storage power station</title><date>2023-03-21</date><risdate>2023</risdate><abstract>The utility model relates to a material transportation system in the construction process of a semi-underground powerhouse of a hybrid pumped storage power station. The method is suitable for the technical field of construction of semi-underground power plants in water conservancy and hydropower engineering. According to the technical scheme, the material transportation system used in the construction process of the semi-underground powerhouse of the mixed pumped storage power station is used for transporting slag materials outwards in the earthwork excavation process of the semi-underground powerhouse and transporting concrete into the semi-underground powerhouse when concrete pouring is conducted on the semi-underground powerhouse. The semi-underground powerhouse is arranged at the bottom of a gully, and the semi-underground powerhouse is characterized in that slag discharging and discharging platforms in the trend direction of the gully are excavated on the two sides of the bottom of the gully where the se</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN218668593UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FORMS FOUNDATIONS HANDLING BUILDING MATERIALS ON THE SITE HYDRAULIC ENGINEERING REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | Material transportation system in construction process of semi-underground powerhouse of hybrid pumped storage power station |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T21%3A29%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20ZHI&rft.date=2023-03-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN218668593UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |