Underground powerhouse top arch anchor cable mounting trolley
The utility model discloses an underground powerhouse top arch anchor cable installation trolley which comprises a supporting unit, a first pulley is arranged on the upper portion of the supporting unit, and a second pulley is arranged on the lower portion of the supporting unit. The winch is locate...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHOU YANPING TIAN WENJIANG LU QUANSHENG ZHANG ZHENWEI ZHAO YONGGANG JIANG HUANJUN QUAN YABO ZHOU XIAOFENG HU JIPING HU YUSHAN |
description | The utility model discloses an underground powerhouse top arch anchor cable installation trolley which comprises a supporting unit, a first pulley is arranged on the upper portion of the supporting unit, and a second pulley is arranged on the lower portion of the supporting unit. The winch is located on the front side of the supporting unit, the winch is provided with a steel wire rope, and the free end of the steel wire rope sequentially bypasses the second pulley and the first pulley and then extends to the rear side of the supporting unit, so that a part of the steel wire rope is arranged on the rear side of the supporting unit in a free state. The underground powerhouse top arch anchor cable installation trolley is simple and reasonable in structure, convenient to install and use and flexible to move, and after one hole is installed, the trolley can be quickly moved to the next hole for construction; the floor area is small and does not influence other construction; and the construction period is shortene |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN218667550UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN218667550UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN218667550UU3</originalsourceid><addsrcrecordid>eNrjZLANzUtJLUovyi_NS1EoyC9PLcrILy1OVSjJL1BILErOUEjMS87IL1JITkzKSVXIBSorycxLVygpys_JSa3kYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhhZmZuampgahocZEKQIA0swxpQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Underground powerhouse top arch anchor cable mounting trolley</title><source>esp@cenet</source><creator>ZHOU YANPING ; TIAN WENJIANG ; LU QUANSHENG ; ZHANG ZHENWEI ; ZHAO YONGGANG ; JIANG HUANJUN ; QUAN YABO ; ZHOU XIAOFENG ; HU JIPING ; HU YUSHAN</creator><creatorcontrib>ZHOU YANPING ; TIAN WENJIANG ; LU QUANSHENG ; ZHANG ZHENWEI ; ZHAO YONGGANG ; JIANG HUANJUN ; QUAN YABO ; ZHOU XIAOFENG ; HU JIPING ; HU YUSHAN</creatorcontrib><description>The utility model discloses an underground powerhouse top arch anchor cable installation trolley which comprises a supporting unit, a first pulley is arranged on the upper portion of the supporting unit, and a second pulley is arranged on the lower portion of the supporting unit. The winch is located on the front side of the supporting unit, the winch is provided with a steel wire rope, and the free end of the steel wire rope sequentially bypasses the second pulley and the first pulley and then extends to the rear side of the supporting unit, so that a part of the steel wire rope is arranged on the rear side of the supporting unit in a free state. The underground powerhouse top arch anchor cable installation trolley is simple and reasonable in structure, convenient to install and use and flexible to move, and after one hole is installed, the trolley can be quickly moved to the next hole for construction; the floor area is small and does not influence other construction; and the construction period is shortene</description><language>chi ; eng</language><subject>CAPSTANS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HAULING ; HOISTING ; HOISTS ; HYDRAULIC ENGINEERING ; LIFTING ; PERFORMING OPERATIONS ; SOIL SHIFTING ; TACKLES, e.g. PULLEY BLOCKS ; TRANSPORTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WINCHES</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230321&DB=EPODOC&CC=CN&NR=218667550U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230321&DB=EPODOC&CC=CN&NR=218667550U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHOU YANPING</creatorcontrib><creatorcontrib>TIAN WENJIANG</creatorcontrib><creatorcontrib>LU QUANSHENG</creatorcontrib><creatorcontrib>ZHANG ZHENWEI</creatorcontrib><creatorcontrib>ZHAO YONGGANG</creatorcontrib><creatorcontrib>JIANG HUANJUN</creatorcontrib><creatorcontrib>QUAN YABO</creatorcontrib><creatorcontrib>ZHOU XIAOFENG</creatorcontrib><creatorcontrib>HU JIPING</creatorcontrib><creatorcontrib>HU YUSHAN</creatorcontrib><title>Underground powerhouse top arch anchor cable mounting trolley</title><description>The utility model discloses an underground powerhouse top arch anchor cable installation trolley which comprises a supporting unit, a first pulley is arranged on the upper portion of the supporting unit, and a second pulley is arranged on the lower portion of the supporting unit. The winch is located on the front side of the supporting unit, the winch is provided with a steel wire rope, and the free end of the steel wire rope sequentially bypasses the second pulley and the first pulley and then extends to the rear side of the supporting unit, so that a part of the steel wire rope is arranged on the rear side of the supporting unit in a free state. The underground powerhouse top arch anchor cable installation trolley is simple and reasonable in structure, convenient to install and use and flexible to move, and after one hole is installed, the trolley can be quickly moved to the next hole for construction; the floor area is small and does not influence other construction; and the construction period is shortene</description><subject>CAPSTANS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>HOISTS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>LIFTING</subject><subject>PERFORMING OPERATIONS</subject><subject>SOIL SHIFTING</subject><subject>TACKLES, e.g. PULLEY BLOCKS</subject><subject>TRANSPORTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WINCHES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLANzUtJLUovyi_NS1EoyC9PLcrILy1OVSjJL1BILErOUEjMS87IL1JITkzKSVXIBSorycxLVygpys_JSa3kYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhhZmZuampgahocZEKQIA0swxpQ</recordid><startdate>20230321</startdate><enddate>20230321</enddate><creator>ZHOU YANPING</creator><creator>TIAN WENJIANG</creator><creator>LU QUANSHENG</creator><creator>ZHANG ZHENWEI</creator><creator>ZHAO YONGGANG</creator><creator>JIANG HUANJUN</creator><creator>QUAN YABO</creator><creator>ZHOU XIAOFENG</creator><creator>HU JIPING</creator><creator>HU YUSHAN</creator><scope>EVB</scope></search><sort><creationdate>20230321</creationdate><title>Underground powerhouse top arch anchor cable mounting trolley</title><author>ZHOU YANPING ; TIAN WENJIANG ; LU QUANSHENG ; ZHANG ZHENWEI ; ZHAO YONGGANG ; JIANG HUANJUN ; QUAN YABO ; ZHOU XIAOFENG ; HU JIPING ; HU YUSHAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN218667550UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2023</creationdate><topic>CAPSTANS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>HOISTS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>LIFTING</topic><topic>PERFORMING OPERATIONS</topic><topic>SOIL SHIFTING</topic><topic>TACKLES, e.g. PULLEY BLOCKS</topic><topic>TRANSPORTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WINCHES</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHOU YANPING</creatorcontrib><creatorcontrib>TIAN WENJIANG</creatorcontrib><creatorcontrib>LU QUANSHENG</creatorcontrib><creatorcontrib>ZHANG ZHENWEI</creatorcontrib><creatorcontrib>ZHAO YONGGANG</creatorcontrib><creatorcontrib>JIANG HUANJUN</creatorcontrib><creatorcontrib>QUAN YABO</creatorcontrib><creatorcontrib>ZHOU XIAOFENG</creatorcontrib><creatorcontrib>HU JIPING</creatorcontrib><creatorcontrib>HU YUSHAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHOU YANPING</au><au>TIAN WENJIANG</au><au>LU QUANSHENG</au><au>ZHANG ZHENWEI</au><au>ZHAO YONGGANG</au><au>JIANG HUANJUN</au><au>QUAN YABO</au><au>ZHOU XIAOFENG</au><au>HU JIPING</au><au>HU YUSHAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Underground powerhouse top arch anchor cable mounting trolley</title><date>2023-03-21</date><risdate>2023</risdate><abstract>The utility model discloses an underground powerhouse top arch anchor cable installation trolley which comprises a supporting unit, a first pulley is arranged on the upper portion of the supporting unit, and a second pulley is arranged on the lower portion of the supporting unit. The winch is located on the front side of the supporting unit, the winch is provided with a steel wire rope, and the free end of the steel wire rope sequentially bypasses the second pulley and the first pulley and then extends to the rear side of the supporting unit, so that a part of the steel wire rope is arranged on the rear side of the supporting unit in a free state. The underground powerhouse top arch anchor cable installation trolley is simple and reasonable in structure, convenient to install and use and flexible to move, and after one hole is installed, the trolley can be quickly moved to the next hole for construction; the floor area is small and does not influence other construction; and the construction period is shortene</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN218667550UU |
source | esp@cenet |
subjects | CAPSTANS EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HAULING HOISTING HOISTS HYDRAULIC ENGINEERING LIFTING PERFORMING OPERATIONS SOIL SHIFTING TACKLES, e.g. PULLEY BLOCKS TRANSPORTING UNDERGROUND OR UNDERWATER STRUCTURES WINCHES |
title | Underground powerhouse top arch anchor cable mounting trolley |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T23%3A37%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHOU%20YANPING&rft.date=2023-03-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN218667550UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |