Tunnel reflector rapid installation device

According to the tunnel reflector rapid installation device, one end of an expansion bolt extends into a preformed hole, the other end of the expansion bolt is provided with an extension steel pipe, an I-shaped steel piece is fixed to the extension steel pipe, a fixed steel piece is arranged on the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WU GANGWEI, YAN XIAOJUN, WU YUNHUAI, YE FEI, LIU CHANG, ZHU AIMIN, SHEN WEI, LI SIHAN, JIANG YIN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator WU GANGWEI
YAN XIAOJUN
WU YUNHUAI
YE FEI
LIU CHANG
ZHU AIMIN
SHEN WEI
LI SIHAN
JIANG YIN
description According to the tunnel reflector rapid installation device, one end of an expansion bolt extends into a preformed hole, the other end of the expansion bolt is provided with an extension steel pipe, an I-shaped steel piece is fixed to the extension steel pipe, a fixed steel piece is arranged on the I-shaped steel piece, and a reflector is fixed to the fixed steel piece; according to the utility model, the expansion bolt extends into the preformed hole for fixation, the installation is simple, the disassembly is easy, the I-shaped steel sheet is fixed through the hoop, the fixed steel sheet and the reflector are arranged on the I-shaped steel sheet, the direction and the position of the reflector can be flexibly adjusted according to the site, and if a measuring point is damaged, the measuring point can be replaced timely and quickly, so that the construction progress is ensured. 一种隧道反光片快速安装装置,膨胀螺栓的一端伸入预留孔、另一端设置有延长钢管,延长钢管上固定有工字钢片,工字钢片上设置有固定钢片,固定钢片上固定有反光片;本实用新型采用膨胀螺栓伸入预留孔的方式进行固定,安装简单、容易拆卸,通过卡箍固定工字钢片,将固定钢片和反光片设置
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN218151068UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN218151068UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN218151068UU3</originalsourceid><addsrcrecordid>eNrjZNAKKc3LS81RKEpNy0lNLskvUihKLMhMUcjMKy5JzMlJLMnMz1NISS3LTE7lYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhhaGpoYGZhahocZEKQIAr9oqMw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Tunnel reflector rapid installation device</title><source>esp@cenet</source><creator>WU GANGWEI ; YAN XIAOJUN ; WU YUNHUAI ; YE FEI ; LIU CHANG ; ZHU AIMIN ; SHEN WEI ; LI SIHAN ; JIANG YIN</creator><creatorcontrib>WU GANGWEI ; YAN XIAOJUN ; WU YUNHUAI ; YE FEI ; LIU CHANG ; ZHU AIMIN ; SHEN WEI ; LI SIHAN ; JIANG YIN</creatorcontrib><description>According to the tunnel reflector rapid installation device, one end of an expansion bolt extends into a preformed hole, the other end of the expansion bolt is provided with an extension steel pipe, an I-shaped steel piece is fixed to the extension steel pipe, a fixed steel piece is arranged on the I-shaped steel piece, and a reflector is fixed to the fixed steel piece; according to the utility model, the expansion bolt extends into the preformed hole for fixation, the installation is simple, the disassembly is easy, the I-shaped steel sheet is fixed through the hoop, the fixed steel sheet and the reflector are arranged on the I-shaped steel sheet, the direction and the position of the reflector can be flexibly adjusted according to the site, and if a measuring point is damaged, the measuring point can be replaced timely and quickly, so that the construction progress is ensured. 一种隧道反光片快速安装装置,膨胀螺栓的一端伸入预留孔、另一端设置有延长钢管,延长钢管上固定有工字钢片,工字钢片上设置有固定钢片,固定钢片上固定有反光片;本实用新型采用膨胀螺栓伸入预留孔的方式进行固定,安装简单、容易拆卸,通过卡箍固定工字钢片,将固定钢片和反光片设置</description><language>chi ; eng</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GYROSCOPIC INSTRUMENTS ; MEASURING ; MEASURING DISTANCES, LEVELS OR BEARINGS ; MINING ; NAVIGATION ; PHOTOGRAMMETRY OR VIDEOGRAMMETRY ; PHYSICS ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS ; SURVEYING ; TESTING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221227&amp;DB=EPODOC&amp;CC=CN&amp;NR=218151068U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221227&amp;DB=EPODOC&amp;CC=CN&amp;NR=218151068U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WU GANGWEI</creatorcontrib><creatorcontrib>YAN XIAOJUN</creatorcontrib><creatorcontrib>WU YUNHUAI</creatorcontrib><creatorcontrib>YE FEI</creatorcontrib><creatorcontrib>LIU CHANG</creatorcontrib><creatorcontrib>ZHU AIMIN</creatorcontrib><creatorcontrib>SHEN WEI</creatorcontrib><creatorcontrib>LI SIHAN</creatorcontrib><creatorcontrib>JIANG YIN</creatorcontrib><title>Tunnel reflector rapid installation device</title><description>According to the tunnel reflector rapid installation device, one end of an expansion bolt extends into a preformed hole, the other end of the expansion bolt is provided with an extension steel pipe, an I-shaped steel piece is fixed to the extension steel pipe, a fixed steel piece is arranged on the I-shaped steel piece, and a reflector is fixed to the fixed steel piece; according to the utility model, the expansion bolt extends into the preformed hole for fixation, the installation is simple, the disassembly is easy, the I-shaped steel sheet is fixed through the hoop, the fixed steel sheet and the reflector are arranged on the I-shaped steel sheet, the direction and the position of the reflector can be flexibly adjusted according to the site, and if a measuring point is damaged, the measuring point can be replaced timely and quickly, so that the construction progress is ensured. 一种隧道反光片快速安装装置,膨胀螺栓的一端伸入预留孔、另一端设置有延长钢管,延长钢管上固定有工字钢片,工字钢片上设置有固定钢片,固定钢片上固定有反光片;本实用新型采用膨胀螺栓伸入预留孔的方式进行固定,安装简单、容易拆卸,通过卡箍固定工字钢片,将固定钢片和反光片设置</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GYROSCOPIC INSTRUMENTS</subject><subject>MEASURING</subject><subject>MEASURING DISTANCES, LEVELS OR BEARINGS</subject><subject>MINING</subject><subject>NAVIGATION</subject><subject>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</subject><subject>PHYSICS</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><subject>SURVEYING</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAKKc3LS81RKEpNy0lNLskvUihKLMhMUcjMKy5JzMlJLMnMz1NISS3LTE7lYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhhaGpoYGZhahocZEKQIAr9oqMw</recordid><startdate>20221227</startdate><enddate>20221227</enddate><creator>WU GANGWEI</creator><creator>YAN XIAOJUN</creator><creator>WU YUNHUAI</creator><creator>YE FEI</creator><creator>LIU CHANG</creator><creator>ZHU AIMIN</creator><creator>SHEN WEI</creator><creator>LI SIHAN</creator><creator>JIANG YIN</creator><scope>EVB</scope></search><sort><creationdate>20221227</creationdate><title>Tunnel reflector rapid installation device</title><author>WU GANGWEI ; YAN XIAOJUN ; WU YUNHUAI ; YE FEI ; LIU CHANG ; ZHU AIMIN ; SHEN WEI ; LI SIHAN ; JIANG YIN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN218151068UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GYROSCOPIC INSTRUMENTS</topic><topic>MEASURING</topic><topic>MEASURING DISTANCES, LEVELS OR BEARINGS</topic><topic>MINING</topic><topic>NAVIGATION</topic><topic>PHOTOGRAMMETRY OR VIDEOGRAMMETRY</topic><topic>PHYSICS</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><topic>SURVEYING</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>WU GANGWEI</creatorcontrib><creatorcontrib>YAN XIAOJUN</creatorcontrib><creatorcontrib>WU YUNHUAI</creatorcontrib><creatorcontrib>YE FEI</creatorcontrib><creatorcontrib>LIU CHANG</creatorcontrib><creatorcontrib>ZHU AIMIN</creatorcontrib><creatorcontrib>SHEN WEI</creatorcontrib><creatorcontrib>LI SIHAN</creatorcontrib><creatorcontrib>JIANG YIN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WU GANGWEI</au><au>YAN XIAOJUN</au><au>WU YUNHUAI</au><au>YE FEI</au><au>LIU CHANG</au><au>ZHU AIMIN</au><au>SHEN WEI</au><au>LI SIHAN</au><au>JIANG YIN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Tunnel reflector rapid installation device</title><date>2022-12-27</date><risdate>2022</risdate><abstract>According to the tunnel reflector rapid installation device, one end of an expansion bolt extends into a preformed hole, the other end of the expansion bolt is provided with an extension steel pipe, an I-shaped steel piece is fixed to the extension steel pipe, a fixed steel piece is arranged on the I-shaped steel piece, and a reflector is fixed to the fixed steel piece; according to the utility model, the expansion bolt extends into the preformed hole for fixation, the installation is simple, the disassembly is easy, the I-shaped steel sheet is fixed through the hoop, the fixed steel sheet and the reflector are arranged on the I-shaped steel sheet, the direction and the position of the reflector can be flexibly adjusted according to the site, and if a measuring point is damaged, the measuring point can be replaced timely and quickly, so that the construction progress is ensured. 一种隧道反光片快速安装装置,膨胀螺栓的一端伸入预留孔、另一端设置有延长钢管,延长钢管上固定有工字钢片,工字钢片上设置有固定钢片,固定钢片上固定有反光片;本实用新型采用膨胀螺栓伸入预留孔的方式进行固定,安装简单、容易拆卸,通过卡箍固定工字钢片,将固定钢片和反光片设置</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN218151068UU
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
GYROSCOPIC INSTRUMENTS
MEASURING
MEASURING DISTANCES, LEVELS OR BEARINGS
MINING
NAVIGATION
PHOTOGRAMMETRY OR VIDEOGRAMMETRY
PHYSICS
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
SURVEYING
TESTING
title Tunnel reflector rapid installation device
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T02%3A05%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WU%20GANGWEI&rft.date=2022-12-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN218151068UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true