Hole hanging tool for post-pouring hole of floor slab
The utility model discloses a hole hanging tool for a post-pouring hole of a floor slab, which comprises a plugging part arranged at the post-pouring hole of the floor slab and used for plugging the post-pouring hole, and the plugging part is further provided with a first connecting hole used for be...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CHEN WEI TANG YUYAO |
description | The utility model discloses a hole hanging tool for a post-pouring hole of a floor slab, which comprises a plugging part arranged at the post-pouring hole of the floor slab and used for plugging the post-pouring hole, and the plugging part is further provided with a first connecting hole used for being connected with the floor slab; the fixing part is arranged on the plugging part, a second connecting hole is formed in the fixing part, and the second connecting hole corresponds to the first connecting hole; the harness cord suspender sequentially penetrates through a through hole preset in the floor slab, the first connecting hole and the second connecting hole, and the two ends of the harness cord suspender are fixed through nuts so as to limit the relative positions of the floor slab, the plugging part and the fixing part. The hole hanging tool can prevent deviation during concrete pouring, is easy and convenient to use, low in manufacturing cost and suitable for mass production and manufacturing, and can e |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217975380UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217975380UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217975380UU3</originalsourceid><addsrcrecordid>eNrjZDD1yM9JVchIzEvPzEtXKMnPz1FIyy9SKMgvLtEtyC8tAolmgJTkpymk5eQDpYpzEpN4GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RobmluamxhUFoqDFRigCZdS2l</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Hole hanging tool for post-pouring hole of floor slab</title><source>esp@cenet</source><creator>CHEN WEI ; TANG YUYAO</creator><creatorcontrib>CHEN WEI ; TANG YUYAO</creatorcontrib><description>The utility model discloses a hole hanging tool for a post-pouring hole of a floor slab, which comprises a plugging part arranged at the post-pouring hole of the floor slab and used for plugging the post-pouring hole, and the plugging part is further provided with a first connecting hole used for being connected with the floor slab; the fixing part is arranged on the plugging part, a second connecting hole is formed in the fixing part, and the second connecting hole corresponds to the first connecting hole; the harness cord suspender sequentially penetrates through a through hole preset in the floor slab, the first connecting hole and the second connecting hole, and the two ends of the harness cord suspender are fixed through nuts so as to limit the relative positions of the floor slab, the plugging part and the fixing part. The hole hanging tool can prevent deviation during concrete pouring, is easy and convenient to use, low in manufacturing cost and suitable for mass production and manufacturing, and can e</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221206&DB=EPODOC&CC=CN&NR=217975380U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221206&DB=EPODOC&CC=CN&NR=217975380U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CHEN WEI</creatorcontrib><creatorcontrib>TANG YUYAO</creatorcontrib><title>Hole hanging tool for post-pouring hole of floor slab</title><description>The utility model discloses a hole hanging tool for a post-pouring hole of a floor slab, which comprises a plugging part arranged at the post-pouring hole of the floor slab and used for plugging the post-pouring hole, and the plugging part is further provided with a first connecting hole used for being connected with the floor slab; the fixing part is arranged on the plugging part, a second connecting hole is formed in the fixing part, and the second connecting hole corresponds to the first connecting hole; the harness cord suspender sequentially penetrates through a through hole preset in the floor slab, the first connecting hole and the second connecting hole, and the two ends of the harness cord suspender are fixed through nuts so as to limit the relative positions of the floor slab, the plugging part and the fixing part. The hole hanging tool can prevent deviation during concrete pouring, is easy and convenient to use, low in manufacturing cost and suitable for mass production and manufacturing, and can e</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD1yM9JVchIzEvPzEtXKMnPz1FIyy9SKMgvLtEtyC8tAolmgJTkpymk5eQDpYpzEpN4GFjTEnOKU3mhNDeDkptriLOHbmpBfnxqcUFicmpeakm8s5-RobmluamxhUFoqDFRigCZdS2l</recordid><startdate>20221206</startdate><enddate>20221206</enddate><creator>CHEN WEI</creator><creator>TANG YUYAO</creator><scope>EVB</scope></search><sort><creationdate>20221206</creationdate><title>Hole hanging tool for post-pouring hole of floor slab</title><author>CHEN WEI ; TANG YUYAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217975380UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>CHEN WEI</creatorcontrib><creatorcontrib>TANG YUYAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CHEN WEI</au><au>TANG YUYAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Hole hanging tool for post-pouring hole of floor slab</title><date>2022-12-06</date><risdate>2022</risdate><abstract>The utility model discloses a hole hanging tool for a post-pouring hole of a floor slab, which comprises a plugging part arranged at the post-pouring hole of the floor slab and used for plugging the post-pouring hole, and the plugging part is further provided with a first connecting hole used for being connected with the floor slab; the fixing part is arranged on the plugging part, a second connecting hole is formed in the fixing part, and the second connecting hole corresponds to the first connecting hole; the harness cord suspender sequentially penetrates through a through hole preset in the floor slab, the first connecting hole and the second connecting hole, and the two ends of the harness cord suspender are fixed through nuts so as to limit the relative positions of the floor slab, the plugging part and the fixing part. The hole hanging tool can prevent deviation during concrete pouring, is easy and convenient to use, low in manufacturing cost and suitable for mass production and manufacturing, and can e</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217975380UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Hole hanging tool for post-pouring hole of floor slab |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T17%3A16%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CHEN%20WEI&rft.date=2022-12-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217975380UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |