Permeable sand dam
The utility model relates to an open type sand blocking embankment which comprises a plurality of precast piles arranged at intervals, a sand blocking part is connected between every two adjacent precast piles, and the sand blocking parts are used for blocking sand. The sand blocking part comprises...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!