Construction formwork of steel reinforced concrete composite structure
The utility model discloses a steel reinforced concrete composite structure construction formwork, which belongs to the field of formworks and comprises a first formwork, a second formwork, a third formwork and a fourth formwork, the second formwork is arranged on one side of the first formwork, the...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHAI HUAJUN WU DAIFU YANG DAIBIN LONG YUKAI GENG DONGHONG ZHU WANGWEN |
description | The utility model discloses a steel reinforced concrete composite structure construction formwork, which belongs to the field of formworks and comprises a first formwork, a second formwork, a third formwork and a fourth formwork, the second formwork is arranged on one side of the first formwork, the fourth formwork is arranged on one side of the second formwork, and the third formwork is arranged on one side of the fourth formwork. And profile steel positioning devices are arranged on the inner side surfaces of the first template, the second template, the third template and the fourth template. According to the steel reinforced concrete composite structure construction formwork, the section steel body can be fixed in the section steel assembly opening, the section steel embedded in concrete can be supported together during formwork supporting in the mode that the formwork is used for fixing the section steel in advance, the embedding procedure of the section steel is simplified, and the construction efficienc |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217897262UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217897262UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217897262UU3</originalsourceid><addsrcrecordid>eNrjZHBzzs8rLikqTS7JzM9TSMsvyi3PL8pWyE9TKC5JTc1RKErNzAOKJqemKCTn5yUXpZakAhm5BfnFmUAWRGdpUSoPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYl39jMyNLewNDcyMwoNNSZKEQAtmDWl</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction formwork of steel reinforced concrete composite structure</title><source>esp@cenet</source><creator>ZHAI HUAJUN ; WU DAIFU ; YANG DAIBIN ; LONG YUKAI ; GENG DONGHONG ; ZHU WANGWEN</creator><creatorcontrib>ZHAI HUAJUN ; WU DAIFU ; YANG DAIBIN ; LONG YUKAI ; GENG DONGHONG ; ZHU WANGWEN</creatorcontrib><description>The utility model discloses a steel reinforced concrete composite structure construction formwork, which belongs to the field of formworks and comprises a first formwork, a second formwork, a third formwork and a fourth formwork, the second formwork is arranged on one side of the first formwork, the fourth formwork is arranged on one side of the second formwork, and the third formwork is arranged on one side of the fourth formwork. And profile steel positioning devices are arranged on the inner side surfaces of the first template, the second template, the third template and the fourth template. According to the steel reinforced concrete composite structure construction formwork, the section steel body can be fixed in the section steel assembly opening, the section steel embedded in concrete can be supported together during formwork supporting in the mode that the formwork is used for fixing the section steel in advance, the embedding procedure of the section steel is simplified, and the construction efficienc</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221125&DB=EPODOC&CC=CN&NR=217897262U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221125&DB=EPODOC&CC=CN&NR=217897262U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHAI HUAJUN</creatorcontrib><creatorcontrib>WU DAIFU</creatorcontrib><creatorcontrib>YANG DAIBIN</creatorcontrib><creatorcontrib>LONG YUKAI</creatorcontrib><creatorcontrib>GENG DONGHONG</creatorcontrib><creatorcontrib>ZHU WANGWEN</creatorcontrib><title>Construction formwork of steel reinforced concrete composite structure</title><description>The utility model discloses a steel reinforced concrete composite structure construction formwork, which belongs to the field of formworks and comprises a first formwork, a second formwork, a third formwork and a fourth formwork, the second formwork is arranged on one side of the first formwork, the fourth formwork is arranged on one side of the second formwork, and the third formwork is arranged on one side of the fourth formwork. And profile steel positioning devices are arranged on the inner side surfaces of the first template, the second template, the third template and the fourth template. According to the steel reinforced concrete composite structure construction formwork, the section steel body can be fixed in the section steel assembly opening, the section steel embedded in concrete can be supported together during formwork supporting in the mode that the formwork is used for fixing the section steel in advance, the embedding procedure of the section steel is simplified, and the construction efficienc</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHBzzs8rLikqTS7JzM9TSMsvyi3PL8pWyE9TKC5JTc1RKErNzAOKJqemKCTn5yUXpZakAhm5BfnFmUAWRGdpUSoPA2taYk5xKi-U5mZQcnMNcfbQTS3Ij08tLkhMTs1LLYl39jMyNLewNDcyMwoNNSZKEQAtmDWl</recordid><startdate>20221125</startdate><enddate>20221125</enddate><creator>ZHAI HUAJUN</creator><creator>WU DAIFU</creator><creator>YANG DAIBIN</creator><creator>LONG YUKAI</creator><creator>GENG DONGHONG</creator><creator>ZHU WANGWEN</creator><scope>EVB</scope></search><sort><creationdate>20221125</creationdate><title>Construction formwork of steel reinforced concrete composite structure</title><author>ZHAI HUAJUN ; WU DAIFU ; YANG DAIBIN ; LONG YUKAI ; GENG DONGHONG ; ZHU WANGWEN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217897262UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHAI HUAJUN</creatorcontrib><creatorcontrib>WU DAIFU</creatorcontrib><creatorcontrib>YANG DAIBIN</creatorcontrib><creatorcontrib>LONG YUKAI</creatorcontrib><creatorcontrib>GENG DONGHONG</creatorcontrib><creatorcontrib>ZHU WANGWEN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHAI HUAJUN</au><au>WU DAIFU</au><au>YANG DAIBIN</au><au>LONG YUKAI</au><au>GENG DONGHONG</au><au>ZHU WANGWEN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction formwork of steel reinforced concrete composite structure</title><date>2022-11-25</date><risdate>2022</risdate><abstract>The utility model discloses a steel reinforced concrete composite structure construction formwork, which belongs to the field of formworks and comprises a first formwork, a second formwork, a third formwork and a fourth formwork, the second formwork is arranged on one side of the first formwork, the fourth formwork is arranged on one side of the second formwork, and the third formwork is arranged on one side of the fourth formwork. And profile steel positioning devices are arranged on the inner side surfaces of the first template, the second template, the third template and the fourth template. According to the steel reinforced concrete composite structure construction formwork, the section steel body can be fixed in the section steel assembly opening, the section steel embedded in concrete can be supported together during formwork supporting in the mode that the formwork is used for fixing the section steel in advance, the embedding procedure of the section steel is simplified, and the construction efficienc</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217897262UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Construction formwork of steel reinforced concrete composite structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T03%3A09%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHAI%20HUAJUN&rft.date=2022-11-25&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217897262UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |