Soil sampling cutting ring structure based on engineering project supervision
The utility model belongs to the technical field of soil sampling cutting rings, and discloses a soil sampling cutting ring structure based on engineering project supervision, which comprises a soil sampling cylinder, a through hole is formed in an inner cavity on one side of the top end of the soil...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | NI JIE WEN YANG ZHAO BIN LI SHENGXI ZHAO WEIYUAN YAO HONG SHU YONGCAI YANG XIAOFEI SUN SIJIN GONG YUN JI YIMIN SHANG YI WU SHANCHUN JIN JOO RUAN BAO |
description | The utility model belongs to the technical field of soil sampling cutting rings, and discloses a soil sampling cutting ring structure based on engineering project supervision, which comprises a soil sampling cylinder, a through hole is formed in an inner cavity on one side of the top end of the soil sampling cylinder, an upper cavity is arranged on the outer side of the top of the through hole, and the bottom of the upper cavity is fixedly connected with the top of the soil sampling cylinder; a reset button is fixedly installed on the inner wall of the bottom end of the upper cavity and located at the top of the through hole, a buzzer is arranged above the reset button and fixedly installed on the inner wall of the top end of the upper cavity, and a first connecting cavity is fixedly installed at the joint of the buzzer and the reset button and located on the inner side of the upper cavity. By arranging the soil sampling barrel, effective soil sampling work can be achieved when engineering project supervision |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217845666UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217845666UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217845666UU3</originalsourceid><addsrcrecordid>eNqNijsOwjAQBd1QIOAOK3oKfoE-AtFAA6kjY14iI7O2vGvOj4I4AM1MMTM252v0gcS-UvDckyuqg_MA0Vyclgy6W8GDIhO49wx8c8rxCackJSG_vfjIUzPqbBDMfp6Y-fFwq08LpNhCknVgaFtfVsvdfrOtqqpp1n9NH7HNN_g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Soil sampling cutting ring structure based on engineering project supervision</title><source>esp@cenet</source><creator>NI JIE ; WEN YANG ; ZHAO BIN ; LI SHENGXI ; ZHAO WEIYUAN ; YAO HONG ; SHU YONGCAI ; YANG XIAOFEI ; SUN SIJIN ; GONG YUN ; JI YIMIN ; SHANG YI ; WU SHANCHUN ; JIN JOO ; RUAN BAO</creator><creatorcontrib>NI JIE ; WEN YANG ; ZHAO BIN ; LI SHENGXI ; ZHAO WEIYUAN ; YAO HONG ; SHU YONGCAI ; YANG XIAOFEI ; SUN SIJIN ; GONG YUN ; JI YIMIN ; SHANG YI ; WU SHANCHUN ; JIN JOO ; RUAN BAO</creatorcontrib><description>The utility model belongs to the technical field of soil sampling cutting rings, and discloses a soil sampling cutting ring structure based on engineering project supervision, which comprises a soil sampling cylinder, a through hole is formed in an inner cavity on one side of the top end of the soil sampling cylinder, an upper cavity is arranged on the outer side of the top of the through hole, and the bottom of the upper cavity is fixedly connected with the top of the soil sampling cylinder; a reset button is fixedly installed on the inner wall of the bottom end of the upper cavity and located at the top of the through hole, a buzzer is arranged above the reset button and fixedly installed on the inner wall of the top end of the upper cavity, and a first connecting cavity is fixedly installed at the joint of the buzzer and the reset button and located on the inner side of the upper cavity. By arranging the soil sampling barrel, effective soil sampling work can be achieved when engineering project supervision</description><language>chi ; eng</language><subject>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES ; MEASURING ; PHYSICS ; TESTING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221118&DB=EPODOC&CC=CN&NR=217845666U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221118&DB=EPODOC&CC=CN&NR=217845666U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NI JIE</creatorcontrib><creatorcontrib>WEN YANG</creatorcontrib><creatorcontrib>ZHAO BIN</creatorcontrib><creatorcontrib>LI SHENGXI</creatorcontrib><creatorcontrib>ZHAO WEIYUAN</creatorcontrib><creatorcontrib>YAO HONG</creatorcontrib><creatorcontrib>SHU YONGCAI</creatorcontrib><creatorcontrib>YANG XIAOFEI</creatorcontrib><creatorcontrib>SUN SIJIN</creatorcontrib><creatorcontrib>GONG YUN</creatorcontrib><creatorcontrib>JI YIMIN</creatorcontrib><creatorcontrib>SHANG YI</creatorcontrib><creatorcontrib>WU SHANCHUN</creatorcontrib><creatorcontrib>JIN JOO</creatorcontrib><creatorcontrib>RUAN BAO</creatorcontrib><title>Soil sampling cutting ring structure based on engineering project supervision</title><description>The utility model belongs to the technical field of soil sampling cutting rings, and discloses a soil sampling cutting ring structure based on engineering project supervision, which comprises a soil sampling cylinder, a through hole is formed in an inner cavity on one side of the top end of the soil sampling cylinder, an upper cavity is arranged on the outer side of the top of the through hole, and the bottom of the upper cavity is fixedly connected with the top of the soil sampling cylinder; a reset button is fixedly installed on the inner wall of the bottom end of the upper cavity and located at the top of the through hole, a buzzer is arranged above the reset button and fixedly installed on the inner wall of the top end of the upper cavity, and a first connecting cavity is fixedly installed at the joint of the buzzer and the reset button and located on the inner side of the upper cavity. By arranging the soil sampling barrel, effective soil sampling work can be achieved when engineering project supervision</description><subject>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES</subject><subject>MEASURING</subject><subject>PHYSICS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijsOwjAQBd1QIOAOK3oKfoE-AtFAA6kjY14iI7O2vGvOj4I4AM1MMTM252v0gcS-UvDckyuqg_MA0Vyclgy6W8GDIhO49wx8c8rxCackJSG_vfjIUzPqbBDMfp6Y-fFwq08LpNhCknVgaFtfVsvdfrOtqqpp1n9NH7HNN_g</recordid><startdate>20221118</startdate><enddate>20221118</enddate><creator>NI JIE</creator><creator>WEN YANG</creator><creator>ZHAO BIN</creator><creator>LI SHENGXI</creator><creator>ZHAO WEIYUAN</creator><creator>YAO HONG</creator><creator>SHU YONGCAI</creator><creator>YANG XIAOFEI</creator><creator>SUN SIJIN</creator><creator>GONG YUN</creator><creator>JI YIMIN</creator><creator>SHANG YI</creator><creator>WU SHANCHUN</creator><creator>JIN JOO</creator><creator>RUAN BAO</creator><scope>EVB</scope></search><sort><creationdate>20221118</creationdate><title>Soil sampling cutting ring structure based on engineering project supervision</title><author>NI JIE ; WEN YANG ; ZHAO BIN ; LI SHENGXI ; ZHAO WEIYUAN ; YAO HONG ; SHU YONGCAI ; YANG XIAOFEI ; SUN SIJIN ; GONG YUN ; JI YIMIN ; SHANG YI ; WU SHANCHUN ; JIN JOO ; RUAN BAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217845666UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES</topic><topic>MEASURING</topic><topic>PHYSICS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>NI JIE</creatorcontrib><creatorcontrib>WEN YANG</creatorcontrib><creatorcontrib>ZHAO BIN</creatorcontrib><creatorcontrib>LI SHENGXI</creatorcontrib><creatorcontrib>ZHAO WEIYUAN</creatorcontrib><creatorcontrib>YAO HONG</creatorcontrib><creatorcontrib>SHU YONGCAI</creatorcontrib><creatorcontrib>YANG XIAOFEI</creatorcontrib><creatorcontrib>SUN SIJIN</creatorcontrib><creatorcontrib>GONG YUN</creatorcontrib><creatorcontrib>JI YIMIN</creatorcontrib><creatorcontrib>SHANG YI</creatorcontrib><creatorcontrib>WU SHANCHUN</creatorcontrib><creatorcontrib>JIN JOO</creatorcontrib><creatorcontrib>RUAN BAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NI JIE</au><au>WEN YANG</au><au>ZHAO BIN</au><au>LI SHENGXI</au><au>ZHAO WEIYUAN</au><au>YAO HONG</au><au>SHU YONGCAI</au><au>YANG XIAOFEI</au><au>SUN SIJIN</au><au>GONG YUN</au><au>JI YIMIN</au><au>SHANG YI</au><au>WU SHANCHUN</au><au>JIN JOO</au><au>RUAN BAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Soil sampling cutting ring structure based on engineering project supervision</title><date>2022-11-18</date><risdate>2022</risdate><abstract>The utility model belongs to the technical field of soil sampling cutting rings, and discloses a soil sampling cutting ring structure based on engineering project supervision, which comprises a soil sampling cylinder, a through hole is formed in an inner cavity on one side of the top end of the soil sampling cylinder, an upper cavity is arranged on the outer side of the top of the through hole, and the bottom of the upper cavity is fixedly connected with the top of the soil sampling cylinder; a reset button is fixedly installed on the inner wall of the bottom end of the upper cavity and located at the top of the through hole, a buzzer is arranged above the reset button and fixedly installed on the inner wall of the top end of the upper cavity, and a first connecting cavity is fixedly installed at the joint of the buzzer and the reset button and located on the inner side of the upper cavity. By arranging the soil sampling barrel, effective soil sampling work can be achieved when engineering project supervision</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217845666UU |
source | esp@cenet |
subjects | INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES MEASURING PHYSICS TESTING |
title | Soil sampling cutting ring structure based on engineering project supervision |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-30T08%3A32%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NI%20JIE&rft.date=2022-11-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217845666UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |