Green construction site awning mounting and erecting structure
The utility model discloses a green construction site awning installing and erecting structure, and relates to the field of building construction, the green construction site awning installing and erecting structure comprises a plurality of stand columns, the stand columns are arranged in sequence a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CAI YACHONG XU PENGCHENG WANG LILI LIU HONGZHI XU MAN CHENG ZHENG NING TIANQI YU SHUMIN ZHAI DINGSONG ZHOU CHANGXIAO ZHANG KAIQUAN ZHANG JUNLONG LIU TAO SHEN PEI ZHANG QINGNAN |
description | The utility model discloses a green construction site awning installing and erecting structure, and relates to the field of building construction, the green construction site awning installing and erecting structure comprises a plurality of stand columns, the stand columns are arranged in sequence and define a construction area, the upper ends of the adjacent stand columns are fixedly connected with cross beams, and steel wire ropes are arranged between the top ends of the opposite stand columns; the steel wire ropes are arranged above a construction area defined by the stand columns in a criss-cross mode, a dustproof net is fixedly laid on the lower surfaces of the steel wire ropes, and the side edges of the dustproof net are fixedly connected to the upper ends of the stand columns. The construction method has the effects of good dust prevention and green construction.
本申请公开了一种绿色施工工地罩棚安装搭设结构,涉及建筑施工领域,包括若干立柱,若干所述立柱依次排列设置且围成施工区域,相邻所述立柱上端固定连接有横梁,相对所述立柱顶端之间设置有钢丝绳,若干所述钢丝绳纵横交错于若干立柱所围成施工区域的上方,所述钢丝绳下表面固定铺设有防尘网,所述防尘网 |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217812471UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217812471UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217812471UU3</originalsourceid><addsrcrecordid>eNrjZLBzL0pNzVNIzs8rLikqTS7JzM9TKM4sSVVILM_LzEtXyM0vzSsBMRLzUhRSi1KTwRyI2tKiVB4G1rTEnOJUXijNzaDk5hri7KGbWpAfn1pckJicmpdaEu_sZ2RobmFoZGJuGBpqTJQiABJdMhY</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Green construction site awning mounting and erecting structure</title><source>esp@cenet</source><creator>CAI YACHONG ; XU PENGCHENG ; WANG LILI ; LIU HONGZHI ; XU MAN ; CHENG ZHENG ; NING TIANQI ; YU SHUMIN ; ZHAI DINGSONG ; ZHOU CHANGXIAO ; ZHANG KAIQUAN ; ZHANG JUNLONG ; LIU TAO ; SHEN PEI ; ZHANG QINGNAN</creator><creatorcontrib>CAI YACHONG ; XU PENGCHENG ; WANG LILI ; LIU HONGZHI ; XU MAN ; CHENG ZHENG ; NING TIANQI ; YU SHUMIN ; ZHAI DINGSONG ; ZHOU CHANGXIAO ; ZHANG KAIQUAN ; ZHANG JUNLONG ; LIU TAO ; SHEN PEI ; ZHANG QINGNAN</creatorcontrib><description>The utility model discloses a green construction site awning installing and erecting structure, and relates to the field of building construction, the green construction site awning installing and erecting structure comprises a plurality of stand columns, the stand columns are arranged in sequence and define a construction area, the upper ends of the adjacent stand columns are fixedly connected with cross beams, and steel wire ropes are arranged between the top ends of the opposite stand columns; the steel wire ropes are arranged above a construction area defined by the stand columns in a criss-cross mode, a dustproof net is fixedly laid on the lower surfaces of the steel wire ropes, and the side edges of the dustproof net are fixedly connected to the upper ends of the stand columns. The construction method has the effects of good dust prevention and green construction.
本申请公开了一种绿色施工工地罩棚安装搭设结构,涉及建筑施工领域,包括若干立柱,若干所述立柱依次排列设置且围成施工区域,相邻所述立柱上端固定连接有横梁,相对所述立柱顶端之间设置有钢丝绳,若干所述钢丝绳纵横交错于若干立柱所围成施工区域的上方,所述钢丝绳下表面固定铺设有防尘网,所述防尘网</description><language>chi ; eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES ; CLEANING ; CLEANING IN GENERAL ; FENCING ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; MASTS ; PERFORMING OPERATIONS ; PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL ; PREVENTION OF FOULING IN GENERAL ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SEPARATION ; SHUTTERING ; SWIMMING OR SPLASH BATHS OR POOLS ; TENTS OR CANOPIES, IN GENERAL ; TRANSPORTING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221115&DB=EPODOC&CC=CN&NR=217812471U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221115&DB=EPODOC&CC=CN&NR=217812471U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CAI YACHONG</creatorcontrib><creatorcontrib>XU PENGCHENG</creatorcontrib><creatorcontrib>WANG LILI</creatorcontrib><creatorcontrib>LIU HONGZHI</creatorcontrib><creatorcontrib>XU MAN</creatorcontrib><creatorcontrib>CHENG ZHENG</creatorcontrib><creatorcontrib>NING TIANQI</creatorcontrib><creatorcontrib>YU SHUMIN</creatorcontrib><creatorcontrib>ZHAI DINGSONG</creatorcontrib><creatorcontrib>ZHOU CHANGXIAO</creatorcontrib><creatorcontrib>ZHANG KAIQUAN</creatorcontrib><creatorcontrib>ZHANG JUNLONG</creatorcontrib><creatorcontrib>LIU TAO</creatorcontrib><creatorcontrib>SHEN PEI</creatorcontrib><creatorcontrib>ZHANG QINGNAN</creatorcontrib><title>Green construction site awning mounting and erecting structure</title><description>The utility model discloses a green construction site awning installing and erecting structure, and relates to the field of building construction, the green construction site awning installing and erecting structure comprises a plurality of stand columns, the stand columns are arranged in sequence and define a construction area, the upper ends of the adjacent stand columns are fixedly connected with cross beams, and steel wire ropes are arranged between the top ends of the opposite stand columns; the steel wire ropes are arranged above a construction area defined by the stand columns in a criss-cross mode, a dustproof net is fixedly laid on the lower surfaces of the steel wire ropes, and the side edges of the dustproof net are fixedly connected to the upper ends of the stand columns. The construction method has the effects of good dust prevention and green construction.
本申请公开了一种绿色施工工地罩棚安装搭设结构,涉及建筑施工领域,包括若干立柱,若干所述立柱依次排列设置且围成施工区域,相邻所述立柱上端固定连接有横梁,相对所述立柱顶端之间设置有钢丝绳,若干所述钢丝绳纵横交错于若干立柱所围成施工区域的上方,所述钢丝绳下表面固定铺设有防尘网,所述防尘网</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</subject><subject>CLEANING</subject><subject>CLEANING IN GENERAL</subject><subject>FENCING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>MASTS</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</subject><subject>PREVENTION OF FOULING IN GENERAL</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SEPARATION</subject><subject>SHUTTERING</subject><subject>SWIMMING OR SPLASH BATHS OR POOLS</subject><subject>TENTS OR CANOPIES, IN GENERAL</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLBzL0pNzVNIzs8rLikqTS7JzM9TKM4sSVVILM_LzEtXyM0vzSsBMRLzUhRSi1KTwRyI2tKiVB4G1rTEnOJUXijNzaDk5hri7KGbWpAfn1pckJicmpdaEu_sZ2RobmFoZGJuGBpqTJQiABJdMhY</recordid><startdate>20221115</startdate><enddate>20221115</enddate><creator>CAI YACHONG</creator><creator>XU PENGCHENG</creator><creator>WANG LILI</creator><creator>LIU HONGZHI</creator><creator>XU MAN</creator><creator>CHENG ZHENG</creator><creator>NING TIANQI</creator><creator>YU SHUMIN</creator><creator>ZHAI DINGSONG</creator><creator>ZHOU CHANGXIAO</creator><creator>ZHANG KAIQUAN</creator><creator>ZHANG JUNLONG</creator><creator>LIU TAO</creator><creator>SHEN PEI</creator><creator>ZHANG QINGNAN</creator><scope>EVB</scope></search><sort><creationdate>20221115</creationdate><title>Green construction site awning mounting and erecting structure</title><author>CAI YACHONG ; XU PENGCHENG ; WANG LILI ; LIU HONGZHI ; XU MAN ; CHENG ZHENG ; NING TIANQI ; YU SHUMIN ; ZHAI DINGSONG ; ZHOU CHANGXIAO ; ZHANG KAIQUAN ; ZHANG JUNLONG ; LIU TAO ; SHEN PEI ; ZHANG QINGNAN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217812471UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES</topic><topic>CLEANING</topic><topic>CLEANING IN GENERAL</topic><topic>FENCING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>MASTS</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL</topic><topic>PREVENTION OF FOULING IN GENERAL</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SEPARATION</topic><topic>SHUTTERING</topic><topic>SWIMMING OR SPLASH BATHS OR POOLS</topic><topic>TENTS OR CANOPIES, IN GENERAL</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>CAI YACHONG</creatorcontrib><creatorcontrib>XU PENGCHENG</creatorcontrib><creatorcontrib>WANG LILI</creatorcontrib><creatorcontrib>LIU HONGZHI</creatorcontrib><creatorcontrib>XU MAN</creatorcontrib><creatorcontrib>CHENG ZHENG</creatorcontrib><creatorcontrib>NING TIANQI</creatorcontrib><creatorcontrib>YU SHUMIN</creatorcontrib><creatorcontrib>ZHAI DINGSONG</creatorcontrib><creatorcontrib>ZHOU CHANGXIAO</creatorcontrib><creatorcontrib>ZHANG KAIQUAN</creatorcontrib><creatorcontrib>ZHANG JUNLONG</creatorcontrib><creatorcontrib>LIU TAO</creatorcontrib><creatorcontrib>SHEN PEI</creatorcontrib><creatorcontrib>ZHANG QINGNAN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CAI YACHONG</au><au>XU PENGCHENG</au><au>WANG LILI</au><au>LIU HONGZHI</au><au>XU MAN</au><au>CHENG ZHENG</au><au>NING TIANQI</au><au>YU SHUMIN</au><au>ZHAI DINGSONG</au><au>ZHOU CHANGXIAO</au><au>ZHANG KAIQUAN</au><au>ZHANG JUNLONG</au><au>LIU TAO</au><au>SHEN PEI</au><au>ZHANG QINGNAN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Green construction site awning mounting and erecting structure</title><date>2022-11-15</date><risdate>2022</risdate><abstract>The utility model discloses a green construction site awning installing and erecting structure, and relates to the field of building construction, the green construction site awning installing and erecting structure comprises a plurality of stand columns, the stand columns are arranged in sequence and define a construction area, the upper ends of the adjacent stand columns are fixedly connected with cross beams, and steel wire ropes are arranged between the top ends of the opposite stand columns; the steel wire ropes are arranged above a construction area defined by the stand columns in a criss-cross mode, a dustproof net is fixedly laid on the lower surfaces of the steel wire ropes, and the side edges of the dustproof net are fixedly connected to the upper ends of the stand columns. The construction method has the effects of good dust prevention and green construction.
本申请公开了一种绿色施工工地罩棚安装搭设结构,涉及建筑施工领域,包括若干立柱,若干所述立柱依次排列设置且围成施工区域,相邻所述立柱上端固定连接有横梁,相对所述立柱顶端之间设置有钢丝绳,若干所述钢丝绳纵横交错于若干立柱所围成施工区域的上方,所述钢丝绳下表面固定铺设有防尘网,所述防尘网</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217812471UU |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES CLEANING CLEANING IN GENERAL FENCING FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE MASTS PERFORMING OPERATIONS PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL PREVENTION OF FOULING IN GENERAL REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SEPARATION SHUTTERING SWIMMING OR SPLASH BATHS OR POOLS TENTS OR CANOPIES, IN GENERAL TRANSPORTING |
title | Green construction site awning mounting and erecting structure |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-30T10%3A44%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CAI%20YACHONG&rft.date=2022-11-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217812471UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |