Pre-sluice maintaining and desilting device for sluice engineering
The utility model discloses a pre-sluice maintenance desilting device for sluice engineering, which belongs to the technical field of water conservancy and comprises a lifting frame, the top end of the lifting frame is connected with a connecting frame, a controller and a timer are respectively asse...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG GUOZHEN YUAN JINGCHAO MA KUN SHI WENTONG |
description | The utility model discloses a pre-sluice maintenance desilting device for sluice engineering, which belongs to the technical field of water conservancy and comprises a lifting frame, the top end of the lifting frame is connected with a connecting frame, a controller and a timer are respectively assembled on the connecting frame, the controller is positioned on one side of the timer, a first driving structure is assembled on the lifting frame, and a second driving structure is assembled on the first driving structure. A first driving structure is assembled on the lifting frame, a second driving structure is assembled on the first driving structure, a sludge hopper is arranged in the lifting frame, two connecting shafts are symmetrically connected to the sludge hopper, the first driving structure enables the two connecting shafts to have a lifting function, and the second driving structure enables the two connecting shafts to have an overturning function; according to the maintenance dredging device, the second |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217781936UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217781936UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217781936UU3</originalsourceid><addsrcrecordid>eNrjZHAKKErVLc4pzUxOVchNzMwrAeLMvHSFxLwUhZTU4sycEhAvJbUMpCAtv0gBqjY1Lz0zLzW1CCjLw8CalphTnMoLpbkZlNxcQ5w9dFML8uNTiwsSk1PzUkvinf2MDM3NLQwtjc1CQ42JUgQAuLMzGg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Pre-sluice maintaining and desilting device for sluice engineering</title><source>esp@cenet</source><creator>WANG GUOZHEN ; YUAN JINGCHAO ; MA KUN ; SHI WENTONG</creator><creatorcontrib>WANG GUOZHEN ; YUAN JINGCHAO ; MA KUN ; SHI WENTONG</creatorcontrib><description>The utility model discloses a pre-sluice maintenance desilting device for sluice engineering, which belongs to the technical field of water conservancy and comprises a lifting frame, the top end of the lifting frame is connected with a connecting frame, a controller and a timer are respectively assembled on the connecting frame, the controller is positioned on one side of the timer, a first driving structure is assembled on the lifting frame, and a second driving structure is assembled on the first driving structure. A first driving structure is assembled on the lifting frame, a second driving structure is assembled on the first driving structure, a sludge hopper is arranged in the lifting frame, two connecting shafts are symmetrically connected to the sludge hopper, the first driving structure enables the two connecting shafts to have a lifting function, and the second driving structure enables the two connecting shafts to have an overturning function; according to the maintenance dredging device, the second</description><language>chi ; eng</language><subject>DREDGING ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221111&DB=EPODOC&CC=CN&NR=217781936U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20221111&DB=EPODOC&CC=CN&NR=217781936U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG GUOZHEN</creatorcontrib><creatorcontrib>YUAN JINGCHAO</creatorcontrib><creatorcontrib>MA KUN</creatorcontrib><creatorcontrib>SHI WENTONG</creatorcontrib><title>Pre-sluice maintaining and desilting device for sluice engineering</title><description>The utility model discloses a pre-sluice maintenance desilting device for sluice engineering, which belongs to the technical field of water conservancy and comprises a lifting frame, the top end of the lifting frame is connected with a connecting frame, a controller and a timer are respectively assembled on the connecting frame, the controller is positioned on one side of the timer, a first driving structure is assembled on the lifting frame, and a second driving structure is assembled on the first driving structure. A first driving structure is assembled on the lifting frame, a second driving structure is assembled on the first driving structure, a sludge hopper is arranged in the lifting frame, two connecting shafts are symmetrically connected to the sludge hopper, the first driving structure enables the two connecting shafts to have a lifting function, and the second driving structure enables the two connecting shafts to have an overturning function; according to the maintenance dredging device, the second</description><subject>DREDGING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAKKErVLc4pzUxOVchNzMwrAeLMvHSFxLwUhZTU4sycEhAvJbUMpCAtv0gBqjY1Lz0zLzW1CCjLw8CalphTnMoLpbkZlNxcQ5w9dFML8uNTiwsSk1PzUkvinf2MDM3NLQwtjc1CQ42JUgQAuLMzGg</recordid><startdate>20221111</startdate><enddate>20221111</enddate><creator>WANG GUOZHEN</creator><creator>YUAN JINGCHAO</creator><creator>MA KUN</creator><creator>SHI WENTONG</creator><scope>EVB</scope></search><sort><creationdate>20221111</creationdate><title>Pre-sluice maintaining and desilting device for sluice engineering</title><author>WANG GUOZHEN ; YUAN JINGCHAO ; MA KUN ; SHI WENTONG</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217781936UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>DREDGING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG GUOZHEN</creatorcontrib><creatorcontrib>YUAN JINGCHAO</creatorcontrib><creatorcontrib>MA KUN</creatorcontrib><creatorcontrib>SHI WENTONG</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG GUOZHEN</au><au>YUAN JINGCHAO</au><au>MA KUN</au><au>SHI WENTONG</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Pre-sluice maintaining and desilting device for sluice engineering</title><date>2022-11-11</date><risdate>2022</risdate><abstract>The utility model discloses a pre-sluice maintenance desilting device for sluice engineering, which belongs to the technical field of water conservancy and comprises a lifting frame, the top end of the lifting frame is connected with a connecting frame, a controller and a timer are respectively assembled on the connecting frame, the controller is positioned on one side of the timer, a first driving structure is assembled on the lifting frame, and a second driving structure is assembled on the first driving structure. A first driving structure is assembled on the lifting frame, a second driving structure is assembled on the first driving structure, a sludge hopper is arranged in the lifting frame, two connecting shafts are symmetrically connected to the sludge hopper, the first driving structure enables the two connecting shafts to have a lifting function, and the second driving structure enables the two connecting shafts to have an overturning function; according to the maintenance dredging device, the second</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217781936UU |
source | esp@cenet |
subjects | DREDGING FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING |
title | Pre-sluice maintaining and desilting device for sluice engineering |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T08%3A46%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20GUOZHEN&rft.date=2022-11-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217781936UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |