Correcting device for secant pile construction

The utility model discloses a secant pile construction deviation rectifying device which comprises a pile hole, and a deviation rectifying mechanism is arranged in the pile hole. The deviation rectifying mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder,...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: YU CHAO, WANG SHIJIE, WANG FEI, WANG JIA, MA BINGSHUN, ZHANG JINGCHANG, LYU WENLI, WANG HUAN, CUI JIGUANG, CUI MINGYU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator YU CHAO
WANG SHIJIE
WANG FEI
WANG JIA
MA BINGSHUN
ZHANG JINGCHANG
LYU WENLI
WANG HUAN
CUI JIGUANG
CUI MINGYU
description The utility model discloses a secant pile construction deviation rectifying device which comprises a pile hole, and a deviation rectifying mechanism is arranged in the pile hole. The deviation rectifying mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder, a fixing pipe and an infrared distance measuring sensor. A first pile body and a second pile body are installed on the left side and the right side in the pile hole correspondingly, one ends of a plurality of fixing plates are attached to the right side of the first pile body and the left side of the second pile body at equal intervals, the other ends of the fixing plates are fixedly connected with hydraulic cylinders, and the ends, away from the fixing plates, of the hydraulic cylinders are fixedly connected with fixing pipes. By means of the hydraulic cylinder and the fixing plate on the fixing pipe, the hydraulic cylinder can be used for driving the fixing plate to move, two pile bodies can be moved and rectifi
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217352643UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217352643UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217352643UU3</originalsourceid><addsrcrecordid>eNrjZNBzzi8qSk0uycxLV0hJLctMTlVIyy9SKE5NTswrUSjIzElVSM7PKy4pKgWqyc_jYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhubGpkZmJsahocZEKQIAb2ErpQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Correcting device for secant pile construction</title><source>esp@cenet</source><creator>YU CHAO ; WANG SHIJIE ; WANG FEI ; WANG JIA ; MA BINGSHUN ; ZHANG JINGCHANG ; LYU WENLI ; WANG HUAN ; CUI JIGUANG ; CUI MINGYU</creator><creatorcontrib>YU CHAO ; WANG SHIJIE ; WANG FEI ; WANG JIA ; MA BINGSHUN ; ZHANG JINGCHANG ; LYU WENLI ; WANG HUAN ; CUI JIGUANG ; CUI MINGYU</creatorcontrib><description>The utility model discloses a secant pile construction deviation rectifying device which comprises a pile hole, and a deviation rectifying mechanism is arranged in the pile hole. The deviation rectifying mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder, a fixing pipe and an infrared distance measuring sensor. A first pile body and a second pile body are installed on the left side and the right side in the pile hole correspondingly, one ends of a plurality of fixing plates are attached to the right side of the first pile body and the left side of the second pile body at equal intervals, the other ends of the fixing plates are fixedly connected with hydraulic cylinders, and the ends, away from the fixing plates, of the hydraulic cylinders are fixedly connected with fixing pipes. By means of the hydraulic cylinder and the fixing plate on the fixing pipe, the hydraulic cylinder can be used for driving the fixing plate to move, two pile bodies can be moved and rectifi</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220902&amp;DB=EPODOC&amp;CC=CN&amp;NR=217352643U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220902&amp;DB=EPODOC&amp;CC=CN&amp;NR=217352643U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>YU CHAO</creatorcontrib><creatorcontrib>WANG SHIJIE</creatorcontrib><creatorcontrib>WANG FEI</creatorcontrib><creatorcontrib>WANG JIA</creatorcontrib><creatorcontrib>MA BINGSHUN</creatorcontrib><creatorcontrib>ZHANG JINGCHANG</creatorcontrib><creatorcontrib>LYU WENLI</creatorcontrib><creatorcontrib>WANG HUAN</creatorcontrib><creatorcontrib>CUI JIGUANG</creatorcontrib><creatorcontrib>CUI MINGYU</creatorcontrib><title>Correcting device for secant pile construction</title><description>The utility model discloses a secant pile construction deviation rectifying device which comprises a pile hole, and a deviation rectifying mechanism is arranged in the pile hole. The deviation rectifying mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder, a fixing pipe and an infrared distance measuring sensor. A first pile body and a second pile body are installed on the left side and the right side in the pile hole correspondingly, one ends of a plurality of fixing plates are attached to the right side of the first pile body and the left side of the second pile body at equal intervals, the other ends of the fixing plates are fixedly connected with hydraulic cylinders, and the ends, away from the fixing plates, of the hydraulic cylinders are fixedly connected with fixing pipes. By means of the hydraulic cylinder and the fixing plate on the fixing pipe, the hydraulic cylinder can be used for driving the fixing plate to move, two pile bodies can be moved and rectifi</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNBzzi8qSk0uycxLV0hJLctMTlVIyy9SKE5NTswrUSjIzElVSM7PKy4pKgWqyc_jYWBNS8wpTuWF0twMSm6uIc4euqkF-fGpxQWJyal5qSXxzn5GhubGpkZmJsahocZEKQIAb2ErpQ</recordid><startdate>20220902</startdate><enddate>20220902</enddate><creator>YU CHAO</creator><creator>WANG SHIJIE</creator><creator>WANG FEI</creator><creator>WANG JIA</creator><creator>MA BINGSHUN</creator><creator>ZHANG JINGCHANG</creator><creator>LYU WENLI</creator><creator>WANG HUAN</creator><creator>CUI JIGUANG</creator><creator>CUI MINGYU</creator><scope>EVB</scope></search><sort><creationdate>20220902</creationdate><title>Correcting device for secant pile construction</title><author>YU CHAO ; WANG SHIJIE ; WANG FEI ; WANG JIA ; MA BINGSHUN ; ZHANG JINGCHANG ; LYU WENLI ; WANG HUAN ; CUI JIGUANG ; CUI MINGYU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217352643UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>YU CHAO</creatorcontrib><creatorcontrib>WANG SHIJIE</creatorcontrib><creatorcontrib>WANG FEI</creatorcontrib><creatorcontrib>WANG JIA</creatorcontrib><creatorcontrib>MA BINGSHUN</creatorcontrib><creatorcontrib>ZHANG JINGCHANG</creatorcontrib><creatorcontrib>LYU WENLI</creatorcontrib><creatorcontrib>WANG HUAN</creatorcontrib><creatorcontrib>CUI JIGUANG</creatorcontrib><creatorcontrib>CUI MINGYU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>YU CHAO</au><au>WANG SHIJIE</au><au>WANG FEI</au><au>WANG JIA</au><au>MA BINGSHUN</au><au>ZHANG JINGCHANG</au><au>LYU WENLI</au><au>WANG HUAN</au><au>CUI JIGUANG</au><au>CUI MINGYU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Correcting device for secant pile construction</title><date>2022-09-02</date><risdate>2022</risdate><abstract>The utility model discloses a secant pile construction deviation rectifying device which comprises a pile hole, and a deviation rectifying mechanism is arranged in the pile hole. The deviation rectifying mechanism comprises a first pile body, a second pile body, a fixing plate, a hydraulic cylinder, a fixing pipe and an infrared distance measuring sensor. A first pile body and a second pile body are installed on the left side and the right side in the pile hole correspondingly, one ends of a plurality of fixing plates are attached to the right side of the first pile body and the left side of the second pile body at equal intervals, the other ends of the fixing plates are fixedly connected with hydraulic cylinders, and the ends, away from the fixing plates, of the hydraulic cylinders are fixedly connected with fixing pipes. By means of the hydraulic cylinder and the fixing plate on the fixing pipe, the hydraulic cylinder can be used for driving the fixing plate to move, two pile bodies can be moved and rectifi</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN217352643UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Correcting device for secant pile construction
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T20%3A15%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=YU%20CHAO&rft.date=2022-09-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217352643UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true