Novel modularized 35-220kV transformer substation assembly type GIS (Gas Insulated Switchgear) foundation

The utility model relates to a novel modularized 35-220kV transformer substation assembly type GIS foundation which comprises a plurality of prefabricated reinforced concrete foundations, and the adjacent reinforced concrete foundations are connected through split bolts. The reinforced concrete foun...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: AO BIN, QIAN LEILEI, DONG KANG, ZHANG ZHIQIANG, WANG YANFANG, CHEN CHAO, BAO SHULONG, LI JING, MAO QINGFENG, CUI XIAOMENG, MA BINGLIN, LI XIAOFEI, WANG XIAOYAN, TONG NENGWU, HAO JIANJIE, ZHU HUAISHENG, HUANG DAZHI, CHENG CHUQING, YANG QING, CHEN LIMING
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator AO BIN
QIAN LEILEI
DONG KANG
ZHANG ZHIQIANG
WANG YANFANG
CHEN CHAO
BAO SHULONG
LI JING
MAO QINGFENG
CUI XIAOMENG
MA BINGLIN
LI XIAOFEI
WANG XIAOYAN
TONG NENGWU
HAO JIANJIE
ZHU HUAISHENG
HUANG DAZHI
CHENG CHUQING
YANG QING
CHEN LIMING
description The utility model relates to a novel modularized 35-220kV transformer substation assembly type GIS foundation which comprises a plurality of prefabricated reinforced concrete foundations, and the adjacent reinforced concrete foundations are connected through split bolts. The reinforced concrete foundation comprises a prefabricated reinforced concrete cavity with an opening in the upper end and a steel bar truss floor support plate installed above the prefabricated reinforced concrete cavity through studs. According to the utility model, the lower foundation framework adopts an enveloping design, so that the stress requirement of the GIS equipment foundation can be met, and cast-in-place of mass concrete is avoided; after a manufacturer determines the size and the position of the embedded part, the upper part is cast-in-place by adopting a steel frame truss floor support plate without formwork erection, so that the engineering quantity of on-site steel bars and formworks can be obviously reduced, and meanwhile
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217352583UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217352583UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217352583UU3</originalsourceid><addsrcrecordid>eNqNjLEOgjAUAFkcjPoPL046kGgbojtRZGFBXM0DHtpYWtJXNPj1EuMHON1yd9NAZfZJGlpb9xqdelMNMgqF2Dwu4B0abqxryQH3JXv0yhpAZmpLPYAfOoIkzWGVIENqeFz4cZC_lK_uN0K3hsb2pv5282DSoGZa_DgLlsfDOT6F1NkrcYcVGfLXOBPbnYxEtJdFIf-SPikVQHs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Novel modularized 35-220kV transformer substation assembly type GIS (Gas Insulated Switchgear) foundation</title><source>esp@cenet</source><creator>AO BIN ; QIAN LEILEI ; DONG KANG ; ZHANG ZHIQIANG ; WANG YANFANG ; CHEN CHAO ; BAO SHULONG ; LI JING ; MAO QINGFENG ; CUI XIAOMENG ; MA BINGLIN ; LI XIAOFEI ; WANG XIAOYAN ; TONG NENGWU ; HAO JIANJIE ; ZHU HUAISHENG ; HUANG DAZHI ; CHENG CHUQING ; YANG QING ; CHEN LIMING</creator><creatorcontrib>AO BIN ; QIAN LEILEI ; DONG KANG ; ZHANG ZHIQIANG ; WANG YANFANG ; CHEN CHAO ; BAO SHULONG ; LI JING ; MAO QINGFENG ; CUI XIAOMENG ; MA BINGLIN ; LI XIAOFEI ; WANG XIAOYAN ; TONG NENGWU ; HAO JIANJIE ; ZHU HUAISHENG ; HUANG DAZHI ; CHENG CHUQING ; YANG QING ; CHEN LIMING</creatorcontrib><description>The utility model relates to a novel modularized 35-220kV transformer substation assembly type GIS foundation which comprises a plurality of prefabricated reinforced concrete foundations, and the adjacent reinforced concrete foundations are connected through split bolts. The reinforced concrete foundation comprises a prefabricated reinforced concrete cavity with an opening in the upper end and a steel bar truss floor support plate installed above the prefabricated reinforced concrete cavity through studs. According to the utility model, the lower foundation framework adopts an enveloping design, so that the stress requirement of the GIS equipment foundation can be met, and cast-in-place of mass concrete is avoided; after a manufacturer determines the size and the position of the embedded part, the upper part is cast-in-place by adopting a steel frame truss floor support plate without formwork erection, so that the engineering quantity of on-site steel bars and formworks can be obviously reduced, and meanwhile</description><language>chi ; eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220902&amp;DB=EPODOC&amp;CC=CN&amp;NR=217352583U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220902&amp;DB=EPODOC&amp;CC=CN&amp;NR=217352583U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>AO BIN</creatorcontrib><creatorcontrib>QIAN LEILEI</creatorcontrib><creatorcontrib>DONG KANG</creatorcontrib><creatorcontrib>ZHANG ZHIQIANG</creatorcontrib><creatorcontrib>WANG YANFANG</creatorcontrib><creatorcontrib>CHEN CHAO</creatorcontrib><creatorcontrib>BAO SHULONG</creatorcontrib><creatorcontrib>LI JING</creatorcontrib><creatorcontrib>MAO QINGFENG</creatorcontrib><creatorcontrib>CUI XIAOMENG</creatorcontrib><creatorcontrib>MA BINGLIN</creatorcontrib><creatorcontrib>LI XIAOFEI</creatorcontrib><creatorcontrib>WANG XIAOYAN</creatorcontrib><creatorcontrib>TONG NENGWU</creatorcontrib><creatorcontrib>HAO JIANJIE</creatorcontrib><creatorcontrib>ZHU HUAISHENG</creatorcontrib><creatorcontrib>HUANG DAZHI</creatorcontrib><creatorcontrib>CHENG CHUQING</creatorcontrib><creatorcontrib>YANG QING</creatorcontrib><creatorcontrib>CHEN LIMING</creatorcontrib><title>Novel modularized 35-220kV transformer substation assembly type GIS (Gas Insulated Switchgear) foundation</title><description>The utility model relates to a novel modularized 35-220kV transformer substation assembly type GIS foundation which comprises a plurality of prefabricated reinforced concrete foundations, and the adjacent reinforced concrete foundations are connected through split bolts. The reinforced concrete foundation comprises a prefabricated reinforced concrete cavity with an opening in the upper end and a steel bar truss floor support plate installed above the prefabricated reinforced concrete cavity through studs. According to the utility model, the lower foundation framework adopts an enveloping design, so that the stress requirement of the GIS equipment foundation can be met, and cast-in-place of mass concrete is avoided; after a manufacturer determines the size and the position of the embedded part, the upper part is cast-in-place by adopting a steel frame truss floor support plate without formwork erection, so that the engineering quantity of on-site steel bars and formworks can be obviously reduced, and meanwhile</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLEOgjAUAFkcjPoPL046kGgbojtRZGFBXM0DHtpYWtJXNPj1EuMHON1yd9NAZfZJGlpb9xqdelMNMgqF2Dwu4B0abqxryQH3JXv0yhpAZmpLPYAfOoIkzWGVIENqeFz4cZC_lK_uN0K3hsb2pv5282DSoGZa_DgLlsfDOT6F1NkrcYcVGfLXOBPbnYxEtJdFIf-SPikVQHs</recordid><startdate>20220902</startdate><enddate>20220902</enddate><creator>AO BIN</creator><creator>QIAN LEILEI</creator><creator>DONG KANG</creator><creator>ZHANG ZHIQIANG</creator><creator>WANG YANFANG</creator><creator>CHEN CHAO</creator><creator>BAO SHULONG</creator><creator>LI JING</creator><creator>MAO QINGFENG</creator><creator>CUI XIAOMENG</creator><creator>MA BINGLIN</creator><creator>LI XIAOFEI</creator><creator>WANG XIAOYAN</creator><creator>TONG NENGWU</creator><creator>HAO JIANJIE</creator><creator>ZHU HUAISHENG</creator><creator>HUANG DAZHI</creator><creator>CHENG CHUQING</creator><creator>YANG QING</creator><creator>CHEN LIMING</creator><scope>EVB</scope></search><sort><creationdate>20220902</creationdate><title>Novel modularized 35-220kV transformer substation assembly type GIS (Gas Insulated Switchgear) foundation</title><author>AO BIN ; QIAN LEILEI ; DONG KANG ; ZHANG ZHIQIANG ; WANG YANFANG ; CHEN CHAO ; BAO SHULONG ; LI JING ; MAO QINGFENG ; CUI XIAOMENG ; MA BINGLIN ; LI XIAOFEI ; WANG XIAOYAN ; TONG NENGWU ; HAO JIANJIE ; ZHU HUAISHENG ; HUANG DAZHI ; CHENG CHUQING ; YANG QING ; CHEN LIMING</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217352583UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>AO BIN</creatorcontrib><creatorcontrib>QIAN LEILEI</creatorcontrib><creatorcontrib>DONG KANG</creatorcontrib><creatorcontrib>ZHANG ZHIQIANG</creatorcontrib><creatorcontrib>WANG YANFANG</creatorcontrib><creatorcontrib>CHEN CHAO</creatorcontrib><creatorcontrib>BAO SHULONG</creatorcontrib><creatorcontrib>LI JING</creatorcontrib><creatorcontrib>MAO QINGFENG</creatorcontrib><creatorcontrib>CUI XIAOMENG</creatorcontrib><creatorcontrib>MA BINGLIN</creatorcontrib><creatorcontrib>LI XIAOFEI</creatorcontrib><creatorcontrib>WANG XIAOYAN</creatorcontrib><creatorcontrib>TONG NENGWU</creatorcontrib><creatorcontrib>HAO JIANJIE</creatorcontrib><creatorcontrib>ZHU HUAISHENG</creatorcontrib><creatorcontrib>HUANG DAZHI</creatorcontrib><creatorcontrib>CHENG CHUQING</creatorcontrib><creatorcontrib>YANG QING</creatorcontrib><creatorcontrib>CHEN LIMING</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>AO BIN</au><au>QIAN LEILEI</au><au>DONG KANG</au><au>ZHANG ZHIQIANG</au><au>WANG YANFANG</au><au>CHEN CHAO</au><au>BAO SHULONG</au><au>LI JING</au><au>MAO QINGFENG</au><au>CUI XIAOMENG</au><au>MA BINGLIN</au><au>LI XIAOFEI</au><au>WANG XIAOYAN</au><au>TONG NENGWU</au><au>HAO JIANJIE</au><au>ZHU HUAISHENG</au><au>HUANG DAZHI</au><au>CHENG CHUQING</au><au>YANG QING</au><au>CHEN LIMING</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Novel modularized 35-220kV transformer substation assembly type GIS (Gas Insulated Switchgear) foundation</title><date>2022-09-02</date><risdate>2022</risdate><abstract>The utility model relates to a novel modularized 35-220kV transformer substation assembly type GIS foundation which comprises a plurality of prefabricated reinforced concrete foundations, and the adjacent reinforced concrete foundations are connected through split bolts. The reinforced concrete foundation comprises a prefabricated reinforced concrete cavity with an opening in the upper end and a steel bar truss floor support plate installed above the prefabricated reinforced concrete cavity through studs. According to the utility model, the lower foundation framework adopts an enveloping design, so that the stress requirement of the GIS equipment foundation can be met, and cast-in-place of mass concrete is avoided; after a manufacturer determines the size and the position of the embedded part, the upper part is cast-in-place by adopting a steel frame truss floor support plate without formwork erection, so that the engineering quantity of on-site steel bars and formworks can be obviously reduced, and meanwhile</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN217352583UU
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title Novel modularized 35-220kV transformer substation assembly type GIS (Gas Insulated Switchgear) foundation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T13%3A47%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=AO%20BIN&rft.date=2022-09-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217352583UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true