Two-stage pit transmission shaft front spline shaft capable of improving part strength and reducing weight
The front spline shaft mainly comprises a first-stage pit, a second-stage pit and the like, the first-stage pit and the second-stage pit are machined in the front end of a shaft body, the second-stage pit is located at the bottom of the first-stage pit, a spigot is formed in the outer side of the fr...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZHENG JIAYOU XU HUAFU |
description | The front spline shaft mainly comprises a first-stage pit, a second-stage pit and the like, the first-stage pit and the second-stage pit are machined in the front end of a shaft body, the second-stage pit is located at the bottom of the first-stage pit, a spigot is formed in the outer side of the front end of the shaft body, and the spigot is located at the bottom of the second-stage pit. A bearing guard and a spline are arranged outside the middle of the shaft body, a fillet is arranged at the transition position of the bearing guard and the front end of the shaft body, and a threaded guard is arranged at the tail of the shaft body. According to the front spline shaft, the pit structure is optimized, a two-stage pit design method is adopted, the wall thickness of the bearing retainer is increased, the strength of the front spline shaft is improved, a heat affected zone is effectively prevented from penetrating through the whole wall thickness during quenching, adverse effects on the fatigue performance of pa |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217301324UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217301324UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217301324UU3</originalsourceid><addsrcrecordid>eNqNikEKwkAMAHvxIOofgveCbQUfUBRPntqzxDa7jbTZZRPt91XoAzwNzMw6ezZzyNXQE0Q2sISiE6tyENABnYFLQQw0jiy0qA4jPkaC4ICnmMKbxUPE9N0skXgbAKWHRP2r-6WZ2A-2zVYOR6Xdwk22v5yb-ppTDHfSiB0J2b2-lcWpOhRVeWzb6q_pA2FBQk8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Two-stage pit transmission shaft front spline shaft capable of improving part strength and reducing weight</title><source>esp@cenet</source><creator>ZHENG JIAYOU ; XU HUAFU</creator><creatorcontrib>ZHENG JIAYOU ; XU HUAFU</creatorcontrib><description>The front spline shaft mainly comprises a first-stage pit, a second-stage pit and the like, the first-stage pit and the second-stage pit are machined in the front end of a shaft body, the second-stage pit is located at the bottom of the first-stage pit, a spigot is formed in the outer side of the front end of the shaft body, and the spigot is located at the bottom of the second-stage pit. A bearing guard and a spline are arranged outside the middle of the shaft body, a fillet is arranged at the transition position of the bearing guard and the front end of the shaft body, and a threaded guard is arranged at the tail of the shaft body. According to the front spline shaft, the pit structure is optimized, a two-stage pit design method is adopted, the wall thickness of the bearing retainer is increased, the strength of the front spline shaft is improved, a heat affected zone is effectively prevented from penetrating through the whole wall thickness during quenching, adverse effects on the fatigue performance of pa</description><language>chi ; eng</language><subject>BLASTING ; BRAKES ; CLUTCHES ; COUPLINGS FOR TRANSMITTING ROTATION ; ENGINEERING ELEMENTS AND UNITS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; THERMAL INSULATION IN GENERAL ; WEAPONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220826&DB=EPODOC&CC=CN&NR=217301324U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25544,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220826&DB=EPODOC&CC=CN&NR=217301324U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZHENG JIAYOU</creatorcontrib><creatorcontrib>XU HUAFU</creatorcontrib><title>Two-stage pit transmission shaft front spline shaft capable of improving part strength and reducing weight</title><description>The front spline shaft mainly comprises a first-stage pit, a second-stage pit and the like, the first-stage pit and the second-stage pit are machined in the front end of a shaft body, the second-stage pit is located at the bottom of the first-stage pit, a spigot is formed in the outer side of the front end of the shaft body, and the spigot is located at the bottom of the second-stage pit. A bearing guard and a spline are arranged outside the middle of the shaft body, a fillet is arranged at the transition position of the bearing guard and the front end of the shaft body, and a threaded guard is arranged at the tail of the shaft body. According to the front spline shaft, the pit structure is optimized, a two-stage pit design method is adopted, the wall thickness of the bearing retainer is increased, the strength of the front spline shaft is improved, a heat affected zone is effectively prevented from penetrating through the whole wall thickness during quenching, adverse effects on the fatigue performance of pa</description><subject>BLASTING</subject><subject>BRAKES</subject><subject>CLUTCHES</subject><subject>COUPLINGS FOR TRANSMITTING ROTATION</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNikEKwkAMAHvxIOofgveCbQUfUBRPntqzxDa7jbTZZRPt91XoAzwNzMw6ezZzyNXQE0Q2sISiE6tyENABnYFLQQw0jiy0qA4jPkaC4ICnmMKbxUPE9N0skXgbAKWHRP2r-6WZ2A-2zVYOR6Xdwk22v5yb-ppTDHfSiB0J2b2-lcWpOhRVeWzb6q_pA2FBQk8</recordid><startdate>20220826</startdate><enddate>20220826</enddate><creator>ZHENG JIAYOU</creator><creator>XU HUAFU</creator><scope>EVB</scope></search><sort><creationdate>20220826</creationdate><title>Two-stage pit transmission shaft front spline shaft capable of improving part strength and reducing weight</title><author>ZHENG JIAYOU ; XU HUAFU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217301324UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BLASTING</topic><topic>BRAKES</topic><topic>CLUTCHES</topic><topic>COUPLINGS FOR TRANSMITTING ROTATION</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZHENG JIAYOU</creatorcontrib><creatorcontrib>XU HUAFU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZHENG JIAYOU</au><au>XU HUAFU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Two-stage pit transmission shaft front spline shaft capable of improving part strength and reducing weight</title><date>2022-08-26</date><risdate>2022</risdate><abstract>The front spline shaft mainly comprises a first-stage pit, a second-stage pit and the like, the first-stage pit and the second-stage pit are machined in the front end of a shaft body, the second-stage pit is located at the bottom of the first-stage pit, a spigot is formed in the outer side of the front end of the shaft body, and the spigot is located at the bottom of the second-stage pit. A bearing guard and a spline are arranged outside the middle of the shaft body, a fillet is arranged at the transition position of the bearing guard and the front end of the shaft body, and a threaded guard is arranged at the tail of the shaft body. According to the front spline shaft, the pit structure is optimized, a two-stage pit design method is adopted, the wall thickness of the bearing retainer is increased, the strength of the front spline shaft is improved, a heat affected zone is effectively prevented from penetrating through the whole wall thickness during quenching, adverse effects on the fatigue performance of pa</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217301324UU |
source | esp@cenet |
subjects | BLASTING BRAKES CLUTCHES COUPLINGS FOR TRANSMITTING ROTATION ENGINEERING ELEMENTS AND UNITS GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS HEATING LIGHTING MECHANICAL ENGINEERING THERMAL INSULATION IN GENERAL WEAPONS |
title | Two-stage pit transmission shaft front spline shaft capable of improving part strength and reducing weight |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T06%3A00%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZHENG%20JIAYOU&rft.date=2022-08-26&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217301324UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |