Soot blowing structure used after shutdown of boiler of thermal power plant
The utility model discloses a soot blowing structure after boiler shutdown of a thermal power plant in the technical field of boiler soot blowing systems, which comprises more than two groups of boilers, each group of boilers is provided with a soot blowing steam main pipeline and a soot blower, the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | CAI ZIHANG LIN JING SONG CAIXU LI YAOLIANG LI ZHAOXIANG LIN KAIJUN QU LIMING LIANG ZHICHAO LIN SONGQING ZHENG ZHIPENG GENG GUANGKUO LIU JIAHAO |
description | The utility model discloses a soot blowing structure after boiler shutdown of a thermal power plant in the technical field of boiler soot blowing systems, which comprises more than two groups of boilers, each group of boilers is provided with a soot blowing steam main pipeline and a soot blower, the soot blowing steam main pipeline is connected to the soot blower, and the soot blowing steam main pipeline is connected to the soot blower. A plurality of sets of boilers are arranged on the boiler body, soot blowing steam communication main pipes are arranged among the soot blowing steam main pipes of the boilers in a communicated mode, and a soot blowing steam communication valve is arranged at one end, communicated with the soot blowing steam communication main pipes, of each soot blowing steam main pipe. The influence of stored ash on boiler inspection and maintenance and the corrosion influence of water flushing of the boiler tube are avoided, and the cost of ash water treatment and environmental protection i |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217235632UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217235632UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217235632UU3</originalsourceid><addsrcrecordid>eNqNikEKwjAQAHPxIOofFu8eTFAfUBRB8KI9l7TdtIWYDdkN-b45-ABPMwyzVo8XkUDvqSxhApaUB8kJITOOYJ1gAp6zjFQCkIOeFl9TNZkxfayHSKWG6G2QrVo56xl3P27U_nZ9N_cDRuqQox0woHTNUx8v2pzORret-Wv6AvvINos</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Soot blowing structure used after shutdown of boiler of thermal power plant</title><source>esp@cenet</source><creator>CAI ZIHANG ; LIN JING ; SONG CAIXU ; LI YAOLIANG ; LI ZHAOXIANG ; LIN KAIJUN ; QU LIMING ; LIANG ZHICHAO ; LIN SONGQING ; ZHENG ZHIPENG ; GENG GUANGKUO ; LIU JIAHAO</creator><creatorcontrib>CAI ZIHANG ; LIN JING ; SONG CAIXU ; LI YAOLIANG ; LI ZHAOXIANG ; LIN KAIJUN ; QU LIMING ; LIANG ZHICHAO ; LIN SONGQING ; ZHENG ZHIPENG ; GENG GUANGKUO ; LIU JIAHAO</creatorcontrib><description>The utility model discloses a soot blowing structure after boiler shutdown of a thermal power plant in the technical field of boiler soot blowing systems, which comprises more than two groups of boilers, each group of boilers is provided with a soot blowing steam main pipeline and a soot blower, the soot blowing steam main pipeline is connected to the soot blower, and the soot blowing steam main pipeline is connected to the soot blower. A plurality of sets of boilers are arranged on the boiler body, soot blowing steam communication main pipes are arranged among the soot blowing steam main pipes of the boilers in a communicated mode, and a soot blowing steam communication valve is arranged at one end, communicated with the soot blowing steam communication main pipes, of each soot blowing steam main pipe. The influence of stored ash on boiler inspection and maintenance and the corrosion influence of water flushing of the boiler tube are avoided, and the cost of ash water treatment and environmental protection i</description><language>chi ; eng</language><subject>BLASTING ; COMBUSTION APPARATUS ; COMBUSTION PROCESSES ; FLUES ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTIONRESIDUES ; WEAPONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220819&DB=EPODOC&CC=CN&NR=217235632U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220819&DB=EPODOC&CC=CN&NR=217235632U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>CAI ZIHANG</creatorcontrib><creatorcontrib>LIN JING</creatorcontrib><creatorcontrib>SONG CAIXU</creatorcontrib><creatorcontrib>LI YAOLIANG</creatorcontrib><creatorcontrib>LI ZHAOXIANG</creatorcontrib><creatorcontrib>LIN KAIJUN</creatorcontrib><creatorcontrib>QU LIMING</creatorcontrib><creatorcontrib>LIANG ZHICHAO</creatorcontrib><creatorcontrib>LIN SONGQING</creatorcontrib><creatorcontrib>ZHENG ZHIPENG</creatorcontrib><creatorcontrib>GENG GUANGKUO</creatorcontrib><creatorcontrib>LIU JIAHAO</creatorcontrib><title>Soot blowing structure used after shutdown of boiler of thermal power plant</title><description>The utility model discloses a soot blowing structure after boiler shutdown of a thermal power plant in the technical field of boiler soot blowing systems, which comprises more than two groups of boilers, each group of boilers is provided with a soot blowing steam main pipeline and a soot blower, the soot blowing steam main pipeline is connected to the soot blower, and the soot blowing steam main pipeline is connected to the soot blower. A plurality of sets of boilers are arranged on the boiler body, soot blowing steam communication main pipes are arranged among the soot blowing steam main pipes of the boilers in a communicated mode, and a soot blowing steam communication valve is arranged at one end, communicated with the soot blowing steam communication main pipes, of each soot blowing steam main pipe. The influence of stored ash on boiler inspection and maintenance and the corrosion influence of water flushing of the boiler tube are avoided, and the cost of ash water treatment and environmental protection i</description><subject>BLASTING</subject><subject>COMBUSTION APPARATUS</subject><subject>COMBUSTION PROCESSES</subject><subject>FLUES</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTIONRESIDUES</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNikEKwjAQAHPxIOofFu8eTFAfUBRB8KI9l7TdtIWYDdkN-b45-ABPMwyzVo8XkUDvqSxhApaUB8kJITOOYJ1gAp6zjFQCkIOeFl9TNZkxfayHSKWG6G2QrVo56xl3P27U_nZ9N_cDRuqQox0woHTNUx8v2pzORret-Wv6AvvINos</recordid><startdate>20220819</startdate><enddate>20220819</enddate><creator>CAI ZIHANG</creator><creator>LIN JING</creator><creator>SONG CAIXU</creator><creator>LI YAOLIANG</creator><creator>LI ZHAOXIANG</creator><creator>LIN KAIJUN</creator><creator>QU LIMING</creator><creator>LIANG ZHICHAO</creator><creator>LIN SONGQING</creator><creator>ZHENG ZHIPENG</creator><creator>GENG GUANGKUO</creator><creator>LIU JIAHAO</creator><scope>EVB</scope></search><sort><creationdate>20220819</creationdate><title>Soot blowing structure used after shutdown of boiler of thermal power plant</title><author>CAI ZIHANG ; LIN JING ; SONG CAIXU ; LI YAOLIANG ; LI ZHAOXIANG ; LIN KAIJUN ; QU LIMING ; LIANG ZHICHAO ; LIN SONGQING ; ZHENG ZHIPENG ; GENG GUANGKUO ; LIU JIAHAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217235632UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BLASTING</topic><topic>COMBUSTION APPARATUS</topic><topic>COMBUSTION PROCESSES</topic><topic>FLUES</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTIONRESIDUES</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>CAI ZIHANG</creatorcontrib><creatorcontrib>LIN JING</creatorcontrib><creatorcontrib>SONG CAIXU</creatorcontrib><creatorcontrib>LI YAOLIANG</creatorcontrib><creatorcontrib>LI ZHAOXIANG</creatorcontrib><creatorcontrib>LIN KAIJUN</creatorcontrib><creatorcontrib>QU LIMING</creatorcontrib><creatorcontrib>LIANG ZHICHAO</creatorcontrib><creatorcontrib>LIN SONGQING</creatorcontrib><creatorcontrib>ZHENG ZHIPENG</creatorcontrib><creatorcontrib>GENG GUANGKUO</creatorcontrib><creatorcontrib>LIU JIAHAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>CAI ZIHANG</au><au>LIN JING</au><au>SONG CAIXU</au><au>LI YAOLIANG</au><au>LI ZHAOXIANG</au><au>LIN KAIJUN</au><au>QU LIMING</au><au>LIANG ZHICHAO</au><au>LIN SONGQING</au><au>ZHENG ZHIPENG</au><au>GENG GUANGKUO</au><au>LIU JIAHAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Soot blowing structure used after shutdown of boiler of thermal power plant</title><date>2022-08-19</date><risdate>2022</risdate><abstract>The utility model discloses a soot blowing structure after boiler shutdown of a thermal power plant in the technical field of boiler soot blowing systems, which comprises more than two groups of boilers, each group of boilers is provided with a soot blowing steam main pipeline and a soot blower, the soot blowing steam main pipeline is connected to the soot blower, and the soot blowing steam main pipeline is connected to the soot blower. A plurality of sets of boilers are arranged on the boiler body, soot blowing steam communication main pipes are arranged among the soot blowing steam main pipes of the boilers in a communicated mode, and a soot blowing steam communication valve is arranged at one end, communicated with the soot blowing steam communication main pipes, of each soot blowing steam main pipe. The influence of stored ash on boiler inspection and maintenance and the corrosion influence of water flushing of the boiler tube are avoided, and the cost of ash water treatment and environmental protection i</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217235632UU |
source | esp@cenet |
subjects | BLASTING COMBUSTION APPARATUS COMBUSTION PROCESSES FLUES HEATING LIGHTING MECHANICAL ENGINEERING REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTIONRESIDUES WEAPONS |
title | Soot blowing structure used after shutdown of boiler of thermal power plant |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T21%3A11%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=CAI%20ZIHANG&rft.date=2022-08-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217235632UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |