Highway construction isolation warning pile

According to the highway construction isolation warning pile, the installation mode that a base and a pile body are combined is adopted, an embedded installation hole is formed in the base, the base is installed in the center of the base, the pile body is made of a flexible hollow material, and thro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LI CHAO, WANG ZHEJIAN, XU ZHOUYI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LI CHAO
WANG ZHEJIAN
XU ZHOUYI
description According to the highway construction isolation warning pile, the installation mode that a base and a pile body are combined is adopted, an embedded installation hole is formed in the base, the base is installed in the center of the base, the pile body is made of a flexible hollow material, and through detachable connection of the base and the pile body, installation and maintenance of the isolation warning pile can be conveniently achieved; according to the technical scheme, the number of mounting holes can be reduced, disturbance to the formed ground can be reduced, the pile body can be reused, loss is reduced, the reflecting material is mounted on the base, the warning effect can still be achieved after the pile body is damaged, safety of passing vehicles and pedestrians is guaranteed, the side edge of the base is designed to be round corners, and the service life of the base is prolonged. The danger caused by passing of vehicle tires or pedestrians can be avoided, the mutual warning piles can be used in a
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217231578UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217231578UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217231578UU3</originalsourceid><addsrcrecordid>eNrjZND2yEzPKE-sVEjOzysuKSpNLsnMz1PILM7PSQSzyhOL8jLz0hUKMnNSeRhY0xJzilN5oTQ3g5Kba4izh25qQX58anFBYnJqXmpJvLOfkaG5kbGhqblFaKgxUYoAAekq3A</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Highway construction isolation warning pile</title><source>esp@cenet</source><creator>LI CHAO ; WANG ZHEJIAN ; XU ZHOUYI</creator><creatorcontrib>LI CHAO ; WANG ZHEJIAN ; XU ZHOUYI</creatorcontrib><description>According to the highway construction isolation warning pile, the installation mode that a base and a pile body are combined is adopted, an embedded installation hole is formed in the base, the base is installed in the center of the base, the pile body is made of a flexible hollow material, and through detachable connection of the base and the pile body, installation and maintenance of the isolation warning pile can be conveniently achieved; according to the technical scheme, the number of mounting holes can be reduced, disturbance to the formed ground can be reduced, the pile body can be reused, loss is reduced, the reflecting material is mounted on the base, the warning effect can still be achieved after the pile body is damaged, safety of passing vehicles and pedestrians is guaranteed, the side edge of the base is designed to be round corners, and the service life of the base is prolonged. The danger caused by passing of vehicle tires or pedestrians can be avoided, the mutual warning piles can be used in a</description><language>chi ; eng</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220819&amp;DB=EPODOC&amp;CC=CN&amp;NR=217231578U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20220819&amp;DB=EPODOC&amp;CC=CN&amp;NR=217231578U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>WANG ZHEJIAN</creatorcontrib><creatorcontrib>XU ZHOUYI</creatorcontrib><title>Highway construction isolation warning pile</title><description>According to the highway construction isolation warning pile, the installation mode that a base and a pile body are combined is adopted, an embedded installation hole is formed in the base, the base is installed in the center of the base, the pile body is made of a flexible hollow material, and through detachable connection of the base and the pile body, installation and maintenance of the isolation warning pile can be conveniently achieved; according to the technical scheme, the number of mounting holes can be reduced, disturbance to the formed ground can be reduced, the pile body can be reused, loss is reduced, the reflecting material is mounted on the base, the warning effect can still be achieved after the pile body is damaged, safety of passing vehicles and pedestrians is guaranteed, the side edge of the base is designed to be round corners, and the service life of the base is prolonged. The danger caused by passing of vehicle tires or pedestrians can be avoided, the mutual warning piles can be used in a</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZND2yEzPKE-sVEjOzysuKSpNLsnMz1PILM7PSQSzyhOL8jLz0hUKMnNSeRhY0xJzilN5oTQ3g5Kba4izh25qQX58anFBYnJqXmpJvLOfkaG5kbGhqblFaKgxUYoAAekq3A</recordid><startdate>20220819</startdate><enddate>20220819</enddate><creator>LI CHAO</creator><creator>WANG ZHEJIAN</creator><creator>XU ZHOUYI</creator><scope>EVB</scope></search><sort><creationdate>20220819</creationdate><title>Highway construction isolation warning pile</title><author>LI CHAO ; WANG ZHEJIAN ; XU ZHOUYI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217231578UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>LI CHAO</creatorcontrib><creatorcontrib>WANG ZHEJIAN</creatorcontrib><creatorcontrib>XU ZHOUYI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LI CHAO</au><au>WANG ZHEJIAN</au><au>XU ZHOUYI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Highway construction isolation warning pile</title><date>2022-08-19</date><risdate>2022</risdate><abstract>According to the highway construction isolation warning pile, the installation mode that a base and a pile body are combined is adopted, an embedded installation hole is formed in the base, the base is installed in the center of the base, the pile body is made of a flexible hollow material, and through detachable connection of the base and the pile body, installation and maintenance of the isolation warning pile can be conveniently achieved; according to the technical scheme, the number of mounting holes can be reduced, disturbance to the formed ground can be reduced, the pile body can be reused, loss is reduced, the reflecting material is mounted on the base, the warning effect can still be achieved after the pile body is damaged, safety of passing vehicles and pedestrians is guaranteed, the side edge of the base is designed to be round corners, and the service life of the base is prolonged. The danger caused by passing of vehicle tires or pedestrians can be avoided, the mutual warning piles can be used in a</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language chi ; eng
recordid cdi_epo_espacenet_CN217231578UU
source esp@cenet
subjects ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
title Highway construction isolation warning pile
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-01T15%3A26%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LI%20CHAO&rft.date=2022-08-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217231578UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true