Embedded leveling control structure for foundation bolts of tower crane
The utility model discloses an embedded leveling control structure for foundation bolts of a tower crane, and belongs to the technical field of installation of tower cranes. Which comprises a foundation pit (12), a reinforcing mesh is arranged in the foundation pit (12), and is characterized in that...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | WANG XIAONA ZONG KEWEN KONG WEIYING LUO DAYONG TIAN GUOSEN ZONG SHUAI |
description | The utility model discloses an embedded leveling control structure for foundation bolts of a tower crane, and belongs to the technical field of installation of tower cranes. Which comprises a foundation pit (12), a reinforcing mesh is arranged in the foundation pit (12), and is characterized in that a plurality of lifting adjusting mechanisms are vertically arranged at the bottom of the foundation pit (12), the upper ends of the lifting adjusting mechanisms extend to the position above the reinforcing mesh, a base (1) is placed at the tops of the lifting adjusting mechanisms, and foundation bolts (11) are fixed to the bottom of the base (1) and extend downwards into the reinforcing mesh. According to the embedded leveling control structure for the foundation bolts of the tower crane, the lifting adjusting mechanism is arranged in the foundation pit, the base is leveled firstly through the lifting adjusting mechanism, and then the base is fixed in the foundation pit in a concrete pouring mode. Compared with th |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_CN217204214UU</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>CN217204214UU</sourcerecordid><originalsourceid>FETCH-epo_espacenet_CN217204214UU3</originalsourceid><addsrcrecordid>eNqNyrEKwjAURuEuDqK-w8VdsLHgA5Sqk5OdS5r8kUJ6b0lu9PV18AEcDt9y1tW1m0d4D08RL8SJn-SENUmkrKk4LQkUJH0r7K1OwjRK1EwSSOWNRC5ZxrZaBRszdj831f7SPdrbAYsMyIt1YOjQ3k19NsfG1E3fn_6aPgo5NRM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Embedded leveling control structure for foundation bolts of tower crane</title><source>esp@cenet</source><creator>WANG XIAONA ; ZONG KEWEN ; KONG WEIYING ; LUO DAYONG ; TIAN GUOSEN ; ZONG SHUAI</creator><creatorcontrib>WANG XIAONA ; ZONG KEWEN ; KONG WEIYING ; LUO DAYONG ; TIAN GUOSEN ; ZONG SHUAI</creatorcontrib><description>The utility model discloses an embedded leveling control structure for foundation bolts of a tower crane, and belongs to the technical field of installation of tower cranes. Which comprises a foundation pit (12), a reinforcing mesh is arranged in the foundation pit (12), and is characterized in that a plurality of lifting adjusting mechanisms are vertically arranged at the bottom of the foundation pit (12), the upper ends of the lifting adjusting mechanisms extend to the position above the reinforcing mesh, a base (1) is placed at the tops of the lifting adjusting mechanisms, and foundation bolts (11) are fixed to the bottom of the base (1) and extend downwards into the reinforcing mesh. According to the embedded leveling control structure for the foundation bolts of the tower crane, the lifting adjusting mechanism is arranged in the foundation pit, the base is leveled firstly through the lifting adjusting mechanism, and then the base is fixed in the foundation pit in a concrete pouring mode. Compared with th</description><language>chi ; eng</language><subject>BUILDING ; CEILINGS ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FLOORS ; FOUNDATIONS ; GENERAL BUILDING CONSTRUCTIONS ; HYDRAULIC ENGINEERING ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES ; WALLS, e.g. PARTITIONS</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220816&DB=EPODOC&CC=CN&NR=217204214U$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20220816&DB=EPODOC&CC=CN&NR=217204214U$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>WANG XIAONA</creatorcontrib><creatorcontrib>ZONG KEWEN</creatorcontrib><creatorcontrib>KONG WEIYING</creatorcontrib><creatorcontrib>LUO DAYONG</creatorcontrib><creatorcontrib>TIAN GUOSEN</creatorcontrib><creatorcontrib>ZONG SHUAI</creatorcontrib><title>Embedded leveling control structure for foundation bolts of tower crane</title><description>The utility model discloses an embedded leveling control structure for foundation bolts of a tower crane, and belongs to the technical field of installation of tower cranes. Which comprises a foundation pit (12), a reinforcing mesh is arranged in the foundation pit (12), and is characterized in that a plurality of lifting adjusting mechanisms are vertically arranged at the bottom of the foundation pit (12), the upper ends of the lifting adjusting mechanisms extend to the position above the reinforcing mesh, a base (1) is placed at the tops of the lifting adjusting mechanisms, and foundation bolts (11) are fixed to the bottom of the base (1) and extend downwards into the reinforcing mesh. According to the embedded leveling control structure for the foundation bolts of the tower crane, the lifting adjusting mechanism is arranged in the foundation pit, the base is leveled firstly through the lifting adjusting mechanism, and then the base is fixed in the foundation pit in a concrete pouring mode. Compared with th</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FOUNDATIONS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyrEKwjAURuEuDqK-w8VdsLHgA5Sqk5OdS5r8kUJ6b0lu9PV18AEcDt9y1tW1m0d4D08RL8SJn-SENUmkrKk4LQkUJH0r7K1OwjRK1EwSSOWNRC5ZxrZaBRszdj831f7SPdrbAYsMyIt1YOjQ3k19NsfG1E3fn_6aPgo5NRM</recordid><startdate>20220816</startdate><enddate>20220816</enddate><creator>WANG XIAONA</creator><creator>ZONG KEWEN</creator><creator>KONG WEIYING</creator><creator>LUO DAYONG</creator><creator>TIAN GUOSEN</creator><creator>ZONG SHUAI</creator><scope>EVB</scope></search><sort><creationdate>20220816</creationdate><title>Embedded leveling control structure for foundation bolts of tower crane</title><author>WANG XIAONA ; ZONG KEWEN ; KONG WEIYING ; LUO DAYONG ; TIAN GUOSEN ; ZONG SHUAI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_CN217204214UU3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>chi ; eng</language><creationdate>2022</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FOUNDATIONS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>WANG XIAONA</creatorcontrib><creatorcontrib>ZONG KEWEN</creatorcontrib><creatorcontrib>KONG WEIYING</creatorcontrib><creatorcontrib>LUO DAYONG</creatorcontrib><creatorcontrib>TIAN GUOSEN</creatorcontrib><creatorcontrib>ZONG SHUAI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>WANG XIAONA</au><au>ZONG KEWEN</au><au>KONG WEIYING</au><au>LUO DAYONG</au><au>TIAN GUOSEN</au><au>ZONG SHUAI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Embedded leveling control structure for foundation bolts of tower crane</title><date>2022-08-16</date><risdate>2022</risdate><abstract>The utility model discloses an embedded leveling control structure for foundation bolts of a tower crane, and belongs to the technical field of installation of tower cranes. Which comprises a foundation pit (12), a reinforcing mesh is arranged in the foundation pit (12), and is characterized in that a plurality of lifting adjusting mechanisms are vertically arranged at the bottom of the foundation pit (12), the upper ends of the lifting adjusting mechanisms extend to the position above the reinforcing mesh, a base (1) is placed at the tops of the lifting adjusting mechanisms, and foundation bolts (11) are fixed to the bottom of the base (1) and extend downwards into the reinforcing mesh. According to the embedded leveling control structure for the foundation bolts of the tower crane, the lifting adjusting mechanism is arranged in the foundation pit, the base is leveled firstly through the lifting adjusting mechanism, and then the base is fixed in the foundation pit in a concrete pouring mode. Compared with th</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | chi ; eng |
recordid | cdi_epo_espacenet_CN217204214UU |
source | esp@cenet |
subjects | BUILDING CEILINGS EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FLOORS FOUNDATIONS GENERAL BUILDING CONSTRUCTIONS HYDRAULIC ENGINEERING INSULATION OR OTHER PROTECTION OF BUILDINGS ROOFS SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES WALLS, e.g. PARTITIONS |
title | Embedded leveling control structure for foundation bolts of tower crane |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-30T22%3A47%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=WANG%20XIAONA&rft.date=2022-08-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ECN217204214UU%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |